Search NASA⌕ Search

SEARCH · Search NASA

Results for “cryomodule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

rf chopper for prebunched radioactive ion beams

An rf chopper system is being designed for the ReAccelerator (ReA) linac at the Facility for Rare Isotope Beams at Michigan State University. The 80.5 MHz ReA radio-frequency quadrupole accelerates prebunched 16.1 MHz beams, producing four satellite bunches for every main bunch. The chopper system includes an rf deflector that kicks every bunch vertically to spatially separate main and satellite bunches. A constant magnetic field superimposed with the chopper electric field biases the beam trajectory to ensure the high-intensity bunches do not experience a net deflection and are injected straight to the ReA6 cryomodule or sent for experiments. The kicked bunches are low in intensity and will be sent to a beam dump, resulting in a clean 16.1 MHz beam structure, which allows for a reliable time-of-flight separation of the isotopes. Published by the American Physical Society 2024

Physics↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Tuning of Multicell Superconducting Accelerating Cavities Using Pressurized Balloons

Plastic tuning of multicell superconducting accelerating cavities is crucial in the development cycle of cavities for particle accelerators. Cavities must meet stringent requirements regarding the operating mode frequency, field flatness, and eccentricity before lining them up in a cryomodule string. After dressing bare cavities with helium vessels, the welded vessel prevents access to individual cavity cells disallowing any further localized tuning. Currently, there is no straightforward way to tune dressed cavities other than cutting the vessel and then tuning the bare cavity and dressing it back, which would significantly impact cost and schedule. In this work, we present a novel tuning technique for already jacketed cavities that is non-invasive and cost-effective. The proposed scheme employs pressurized balloons to be temporarily deployed inside the cavity as a means to localize mechanical deformation in specific cells. The proposed tuning technique was successfully utilized to recover a 9-cell 1.3 GHz tesla-style cavity.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Study on Conduction Cooling of Superconducting Magnets for the ILC Main Linac

In the main linac of the International Linear Collider (ILC), superconducting magnets for beam focusing and steering will be located periodically in superconducting RF (SRF) cavity string for beam acceleration in common cryomodules. A concept of conduction cooling of the combined-functioned, splittable superconducting magnets has been proposed and investigated to adapt much different features and to meet different requirements for the superconducting magnet and SRF cavity in fabrication, assembly, and operation. It is required to integrate the superconducting magnet after the SRF cavity string assembly which completed under an ultra-clean environment. The magnet must be conductively cooled down through thermal links to a liquid helium supply pipe. According to this concept, a model magnet development was carried out in cooperation with Fermilab and KEK, and has been demonstrated in KEK superconducting RF test facility (STF). In addition, an important issue has been recently identified. High gradient SRF cavities naturally emit field emission electron flux from the inner surface, so-called dark current. It may pass through the subsequent SRF cavity string and penetrate into the superconducting magnets placed downstream. It may heat up the superconducting coils, and may cause a quench. Therefore, further study on reliable conduction cooling and to secure the superconducting magnet operation with a keeping sufficient safety margin is quite essential. In this paper, we report the installation, the improvement achieved in STF, and the R&D progress in the study on the conduction cooling of the superconducting magnet for the ILC main linac.

43 PARTICLE ACCELERATORS↗

Design of an Emittance Compensation Superconducting Magnet Package for LCLS-II-HE's SRF Photo-Injector

An SRF photo-injector (low frequency, quarter-wave resonator plus emittance compensation magnet) is planned for LCLS-II-HE as it can provide a higher cathode gradient and better electron beam quality than other types of CW electron guns. The magnet package is located immediately downstream of the SRF cavity, and incorporates a solenoid doublet, bucking coils for reduction of the fringe field, normal/skew quadrupoles and horizontal/vertical dipoles. All the magnets are wound of NbTi wire and operate in liquid helium environment. The solenoid package is located inside the SRF gun cryomodule. Design considerations include space limitations, optimal emittance compensation, the magnetic field limits in the superconducting wire and quench protection. The solenoid coils must provide a peak excitation > 25 kgauss 2 ·cm, a fringe field < 20 gauss at the wall of the SRF cavity, an integrated dipole field < 90 gauss·cm and an integrated quadrupole field < 10 gauss. As a result, a genetic algorithm was used to optimize the solenoid design. Correction dipoles and quadrupoles were designed using coil dominated Walstrom style coils.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

High-$Q_0$ treatment of CEBAF 1.5 GHz SRF cavities

The Continuous Electron Beam Accelerator Facility (CEBAF) was the first large-scale accelerator to employ superconducting radiofrequency (SRF) cavities for continuous-wave operation. Ongoing research and development efforts continue to focus on increasing the intrinsic quality factor (Q 0 ) of these cavities in order to reduce cryogenic losses while maintaining operational gradients. Here, in this work, we report on the application of high-Q 0 surface treatments to single-cell and multicell C100 and C75 style 1.5 GHz niobium cavities used in the CEBAF accelerator. Nitrogen infusion and oxygen alloying via medium-temperature baking were applied under heat-treatment constraints relevant to existing cavity hardware. Both processes yielded substantial improvements in Q 0 at moderate accelerating gradients, achieving values of approximately 2 × 10 10 at 2.07 K and 20 MV/m. The effectiveness of nitrogen infusion at reduced annealing temperatures and the successful extension of oxygen alloying to multicell cavities are demonstrated. These results establish viable pathways for implementing high-Q 0 treatments in CEBAF-compatible cavities and support future integration into cryomodules for reduced operational cryogenic load.

Dhakal, Pashupati [Thomas Jefferson National Accel↗

Beam Dynamics Studies at the PIP-II Injector Test Facility

A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.

43 PARTICLE ACCELERATORS↗

An Operationally Integrated Approach to the SNS 2.8 MW Power Upgrade

The SNS accelerator consist of a 1 GeV H⁻ linac and an accumulator ring producing a 1.4 MW pulsed proton beam which drives a spallation neutron source. The Proton Power Upgrade project will double the power capability from 1.4 to 2.8 MW by increasing the linac energy 30% and the beam current about 50%. Equipment upgrades include new superconducting RF cryomodules and supporting RF equipment, upgraded ring equipment, and upgraded high power target systems. An important aspect of the upgrade is a gradual power ramp-up starting in 2022 in which new equipment is installed during maintenance outages as it arrives.

Galambos, John D↗

Direct Observations of Sub-micropulse Electron-beam Effects from Short-range Wakefields in TESLA-type Superconducting RF Cavities

The preservation of the low emittance of electron beams during transport in the accelerating structures of large facilities is an ongoing challenge. In the cases of the TESLA-type superconducting rf cavities currently used in the European X-ray Free-electron Laser (FEL) and the under construction Linac Coherent Light Source upgrade (LCLS-II), off-axis beam transport may result in emittance dilution due to transverse long-range and short-range wakefields (SRW)*. To investigate such effects, experiments were performed at the Fermilab Accelerator Science and Technology (FAST) facility with its unique two-cavity configuration after the photocathode rf gun. We used optical transition radiation (OTR) imaging with a UV-visible synchroscan streak camera to display sub-micropulse y-t effects in the 41-MeV beam. The head-tail transverse kicks within the 11-ps-long micropulses were observed at the 100-micron level for steering off-axis in one cavity and several 100 microns for two cavities. Since the SRW kick angles go inversely with energy, these results may inform the commissioning plans of the LCLS-II injector where beam will be injected at ~1 MeV into a cryomodule.

43 PARTICLE ACCELERATORS↗

Beam Profile Measurements Utilizing an Amplitude Modulated Pulsed Fiber Laser at PIP2IT

Fermilab is undertaking the development of a new 800 MeV superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a warm front-end generating 2 mA of 2.1 MeV H⁻ followed immediately by a series of superconducting RF cryomodules to 800 MeV. To limit the potential damage to the superconducting RF cavities, PIP-II will utilize laser-based monitors to obtain beam profiles via photoionization. This paper will present the results of transverse and longitudinal beam profile measurements using a prototype profile monitor that was tested with 2.1 MeV H⁻ beam at the PIP-II Injector Test (PIP2IT) accelerator. This prototype profile monitor utilizes a high repetition rate fiber laser and fiber optic transport into the PIP2IT enclosure. In addition, results will be shown of narrow-band electron detection from amplitude modulated laser pulses.

43 PARTICLE ACCELERATORS↗

Design of a non-invasive laser-based beam profile monitor system for the new Fermilab PIP-II superconducting H- linac

As part of the new Proton Improvement Plan (PIP-II), Fermilab is undertaking the development of a new 800 MeV, 2 mA H- superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a series of superconducting RF cryomodules from 2.1 MeV to 800 MeV. To limit the potential damage to the superconducting RF cavities, PIP-II will utilize non-invasive laser-based monitors (laserwires) to obtain beam profiles via photoionization. This paper will present the design of this PIP-II laserwire system including the picosecond pulsed laser, optical transport line, 13 individual laserwire stations, laser feedback and timing controls. The paper also describes the signal detection system and operation of the profile measurements.

Scarpine, Victor [Fermilab]↗

The RF Protection Interlock System Prototype Verification

The Radio Frequency Protection Interlock system plays vital role in the LLRF related/dependent accelerator sections Protection. It’s main role is to collect information from number different sensors and indicators around nearest cavities and cryomodule and provide instant RF signal termination in case of safety thresholds violation. This submission describes newly designed RFPI system tailored to the Proton Improvement Plan II (PIP-II) requirements. The proof of concept prototype of this system has been build. The paper includes also the CMTF environment evaluation tests results and findings as an input to the next full-scope prototype design.

43 PARTICLE ACCELERATORS↗

State Machine Operation of Complex Systems

Operation of complex systems which depend on one or more other systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require different alarm limits, different archiving needs, and have different critical parameters. Relying on operators to reliably change 10s-1000s of parameters for each system for each state is unreasonable. Not changing these parameters results in alarms being ignored or disabled, critical changes missed, and/or possible data archiving problems. To reliably manage the operation of complex systems, such as cryomodules (CMs), Fermilab is implementing state machines for each CM and an over-arching state machine for the PIP-II superconducting linac (SCL). The state machine transitions and operating parameters are stored/restored to/from a configuration database. Proper implementation of the state machines will not only ensure safe and reliable operation of the CMs, but will help ensure reliable data quality. A description of PIP-II SCL, details of the state machines, and lessons learned from limited use of the state machines in recent CM testing will be discussed.

43 PARTICLE ACCELERATORS↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Previously, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H⁻ beam for injection into the Recycler Ring (RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a cw SRF linac, followed by a ~2-8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed. Research needed to implement the Booster replacement is described.

Neuffer, David V.↗

Commissioning of the LCLS-II Prototype HOM Detectors with Tesla-Type Cavities at Fast

Experiments at the Fermilab Accelerator Science and Technology* (FAST) facility detected electron beam-induced high order mode (HOM) signals from Tesla superconducting cavities. This paper describes some of the signal detection hardware used in this experiment, as well as measurements of the HOM signal magnitude versus beam trajectory. These measurements were made both with a single bunch and with a train of 50 bunches at bunch charges from 400 pC/b down to 10 pC/b. The detection hardware is designed for use with the Tesla superconducting cavities of LCLS-II at SLAC** and is based on a prototype already in use at Fermilab. The HOM signal passes through a bandpass filter that is centered on several cavity dipole modes and a zero bias Schottky diode detects its magnitude. Direct comparisons were made between the FNAL chassis and the SLAC prototype for identical beam steering conditions. To support measurements with bunch charges as low as 10 pC, the SLAC detector has RF amplification between the bandpass filter and the diode detector. With this hardware, usable HOM signal measurements are obtained with a single bunch of 10 pC in cryomodule cavities as will be needed for LCLS-II.

43 PARTICLE ACCELERATORS↗

Design of an RF-Dipole Crabbing Cavity System for the Electron-Ion Collider

The Electron-Ion Collider requires several crabbing systems to facilitate head-on collisions between electron and proton beams in increasing the luminosity at the interaction point. One of the critical rf systems is the 197 MHz crabbing system that will be used in crabbing the proton beam. Many factors such as the low operating frequency, large transverse voltage requirement, tight longitudinal and transverse impedance thresholds, and limited beam line space makes the crabbing cavity design challenging. The rf-dipole cavity design is considered as one of the crabbing cavity options for the 197 MHz crabbing system. The cavity is designed including the HOM couplers, FPC and other ancillaries. This paper presents the detailed electromagnetic design, mechanical analysis, and conceptual cryomodule design of the crabbing system.

De Silva, S. U.↗

JLAB LLRF 3.0 Development and Tests

The Jefferson Lab LLRF 3.0 system is being developed to replace legacy LLRF systems in the CEBAF accelerator. The new design builds upon 25 years of design and operational RF control experience, and our recent collaboration in the design of the LCLSII LLRF system. The new cavity control algorithm is a fully functional phase and amplitude locked Self Exciting Loop (SEL). This paper discusses the progress of the LLRF 3.0 hardware design, FPGA firmware development, User Datagram Protocol (UDP) operation, and recent LLRF 3.0 system tests on the CEBAF Booster cryomodule in the Upgrade Injector Test Facility (UITF).

Plawski, T. E.↗

Observation of Long-Range Wakefield Effects Generated in an Off-Resonance Tesla-Type Cavity

The interest in controlling emittance dilution effects due to off-axis beam transport in accelerator cavities and the resulting dipolar modes is especially important for the facilities with lower emittance beams. The Fermilab Accelerator Science and Technology (FAST) facility has a unique configuration of two single cavities after the photocathode rf gun followed by a cryomodule. The second capture cavity (CC2) was run 15 kHz off resonance and without rf power while a 25-MeV beam was injected into it. The beam centroid effects were tracked by 10 rf button BPMs with bunch-by-bunch position readout capability downstream in a 12-m drift. Possible LRW effects seemed to dominate our previously observed near-resonant HOM effects at mode 14 in this cavity. This mode also shifted in frequency compared to that of the tuned case based on direct measurements. Submacropulse vertical position slewing of 1400 microns at 11 m downstream was observed with a 125 pC/bunch, 50 bunches per macropulse, and 25-MeV beam. The y-position slew amplitudes as a function of z were also measured. Horizontal positions also showed a slew effect. Both are emittance-dilution effects which one wants to mitigate.

Lumpkin, Alex H.↗