Autonomy and Software Technology on NASA's Deep Space One
NASA's Deep Space One (DS1) mission is unprecedented.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
NASA's Deep Space One (DS1) mission is unprecedented.
For deep space optical communications, optical telescopes located above the Earth's atmosphere would have significant performance advantages over telescopes mounted on the Earth's surface. Link outages due to could cover would be eliminated, atmospheric attenuation would be eliminated, and signal degradation due to stray light would be reduced.
For deep space optical communications, optical telescopes located above the Earth's atmosphere would have significant performance advantages over telescopes mounted on the Earth's surface. Link outages due to cloud cover would be eliminated, atmospheric attenuation would be eliminated, and signal degradation due to stray light would be reduced. A study has been conducted to compare various exo-atmospheric platforms for the Earth end of the optical link.
A Deep Space Habitat (DSH) is the crew habitation module designed for long duration missions. Although humans have lived in space for many years, there has never been a habitat beyond low-Earth-orbit. As part of the Advanced Exploration Systems (AES) Habitation Project, a study was conducted to develop weightless habitat configurations using systems based on International Space Station (ISS) designs. Two mission sizes are described for a 4-crew 60-day mission, and a 4-crew 500-day mission using standard Node, Lab, and Multi-Purpose Logistics Module (MPLM) sized elements, and ISS derived habitation systems. These durations were selected to explore the lower and upper bound for the exploration missions under consideration including a range of excursions within the Earth-Moon vicinity, near earth asteroids, and Mars orbit. Current methods for sizing the mass and volume for habitats are based on mathematical models that assume the construction of a new single volume habitat. In contrast to that approach, this study explored the use of ISS designs based on existing hardware where available and construction of new hardware based on ISS designs where appropriate. Findings included a very robust design that could be reused if the DSH were assembled and based at the ISS and a transportation system were provided for its return after each mission. Mass estimates were found to be higher than mathematical models due primarily to the use of multiple ISS modules instead of one new large module, but the maturity of the designs using flight qualified systems have potential for improved cost, schedule, and risk benefits.
A Deep Space Habitat (DSH) is the crew habitation module designed for long duration missions. Although humans have lived in space for many years, there has never been a habitat beyond low-Earth-orbit. As part of the Advanced Exploration Systems (AES) Habitation Project, a study was conducted to develop weightless habitat configurations using systems based on International Space Station (ISS) designs. Two mission sizes are described for a 4-crew 60-day mission, and a 4-crew 500-day mission using standard Node, Lab, and Multi-Purpose Logistics Module (MPLM) sized elements, and ISS derived habitation systems. These durations were selected to explore the lower and upper bound for the exploration missions under consideration including a range of excursions within the Earth-Moon vicinity, near earth asteroids, and Mars orbit. Current methods for sizing the mass and volume for habitats are based on mathematical models that assume the construction of a new single volume habitat. In contrast to that approach, this study explored the use of ISS designs based on existing hardware where available and construction of new hardware based on ISS designs where appropriate. Findings included a very robust design that could be reused if the DSH were assembled and based at the ISS and a transportation system were provided for its return after each mission. Mass estimates were found to be higher than mathematical models due primarily to the use of multiple ISS modules instead of one new large module, but the maturity of the designs using flight qualified systems have potential for improved cost, schedule, and risk benefits.
The NASA Deep Space Network (DSN) has a new requirement to support high-data-rate Category A (Cat A) missions (within 2 million kilometers of Earth) with simultaneous S-band uplink, S-band downlink and Ka-band downlink. The S-band links are required for traditional TT&C (Telemetry, Tracking, and Command) support to the spacecraft, while the Ka-band link is intended for high-data-rate science returns. The new Ka-band system combines the use of proven DSN cryogenic designs, for low system temperature, and high data rate capability using commercial telemetry receivers. The initial Cat A support is required for the James Webb Space Telescope (JWST) in 2013 and possibly other missions. The upgrade has been implemented into 3 different 34-meter Beam Waveguide (BWG) antennas in the DSN, one at each of the complexes in Canberra (Australia), Goldstone (California) and Madrid (Spain). System test data is presented to show that the requirements were met and the DSN is ready for Cat A Ka-band operational support.
The Deep Space Climate Observatory (DSCOVR), formerly known as Triana, successfully launched on February 11th, 2015. To date, each of the five space-craft attitude control system (ACS) modes have been operating as expected and meeting all guidance, navigation, and control (GN&C) requirements, although since launch, several anomalies were encountered. While unplanned, these anomalies have proven to be invaluable in developing a deeper understanding of the ACS, and drove the design of three alterations to the ACS task of the flight software (FSW). An overview of the GN&C subsystem hardware, including re-furbishment, and ACS architecture are introduced, followed by a chronological discussion of key events, flight performance, as well as anomalies encountered by the GN&C team.
Extended duration deep space missions as well as permanent space habitats face numerous technical challenges, key among them is energy generation and energy storage. There are considerable monetary and technical barriers to the generation of power in space. Therefore, it is important to store and be able to access power in an efficient and safe manner over a large number of cycles. Energy storage and in particular, batteries, are vital to the operation of next-generation extraterrestrial shuttles, rovers, habitats and extravehicular activity (EVA) space suits. The performance metrics for extended duration space missions are at least 2 times greater than those set for terrestrial applications such as electric automobiles. Furthermore, safety is essential for operation of space missions particularly involving astronauts such as shuttles, habitats and EVA space suits. Preliminary systems level analysis has indicated that there are five key properties which must be optimized for successful implementation of battery systems. Those five key criteria are: safety, energy density, power, packaging design and scalability. Current state-of-the-art (SOA) lithium-ion batteries can meet or exceed the requirements for certain space applications in the areas of power and scalability, yet are insufficient in the key performance criteria of energy, safety and packaging design. The SABERS concept proposes a battery that meets all five key performance criteria through development of a solid-state architecture battery utilizing high capacity sulfur-selenium cathode and lithium metal anode. The combination of sulfur and selenium offers a balanced energy-to-power density ratio, which can be tailored to the specific application by altering the stoichiometric ratios of sulfur to selenium. This hybrid cathode will be developed by implementing NASA patented holey graphene technology as a highly conductive, ultra-lightweight electrode scaffold. A solid-state electrolyte will be used as a safe, non-flammable replacement to the highly flammable liquid organic electrolytes currently used in SOA lithium-ion batteries. This solid-state lithium-sulfur/selenium cell will be designed into a serial stacking configuration to enable dense packaging of the battery cells. The serial stacking configuration is termed a bipolar stack, which has the advantages of reducing overall cell weight, simplifying the interfaced connections for the cell, and minimizing the cooling requirements for the cell. Lastly, optimization of battery components will occur through a robust and rigorous combination of various computational modeling techniques covering multiple length scales. The expected result will be a fully solid-state battery with operational temperatures up to 150 °C which provides the required energy density, discharge rates, and inherent safety to meet the strict space mission performance criteria. In particular, the wide operational temperature window is required for the large temperature ranges which are experienced across a broad range of potential space missions. This presentation will show initial results that demonstrate the SABERS team has developed a composite carbon-sulfur cathode which exceeds 1100 Wh/kg at a discharge rate of 0.4C, and 804 Wh/kg at a discharge rate of 1C. Additionally, this presentation will show the SABERS team multiscale computational modeling approach and has produced a novel particle dynamics method called Solid Electrolyte Sphere Approximation Model (SESAM). SESAM is on the 1-10 µm scale and provides electromechanical and grain interactions for predictive design guidelines for the experimental team to follow.
The NASA Deep Space Network (DSN) is preparing to experiment with a new way to supporting highly autonomous missions. The spacecraft will have on-board intelligence to determine whether it is healthy and when ground contact is needed.
NASA's Deep Space Network (DSN) consists of more than 20 antennas located at three globally spaced ground communications facilities. Local generation and distribution of precise time and frequency reference signals comprise an essential and central component of each complex. Within each complex synchronized timing references are required by approximately 100 users located at distances up to 30 kilometers from the central control center and station Master Clock. In this paper a highly modular, hot-swappable, and expandable system design for generation, delivery, and synchronization of highly precise and stable timing signals over fiber optic cables is described.
The Deep Space Optical Communication (DSOC) project will demonstrate free-space optical communication at almost 3 AU, or 3 orders of magnitude further than any previous attempt. DSOC will utilize the 5m Palomar Hale Telescope to receive the downlink signal, which will couple the downlink light onto an optical table and into a superconducting nanowire single photon detector (SNSPD). The output of the SNSPD is digitized by the Ground Laser Receiver Signal Processing Assembly (GSPA) using a high throughput streaming time to digital converter (TDC). The GSPA is a scalable FPGA-based receiver which demodulates and decodes the DSOC downlink signal through novel signal processing algorithms implemented on Xilinx UltraScale+ FPGAs, as well as Python-based software monitor and control routines. Exploiting the unique TDC-based architecture, the GSPA supports over four orders of magnitude of downlink data rates across multiple orders of magnitude of signal and background powers. In this paper we present an overview of the hardware, firmware and software architectures to implement this system, as well as performance analysis for links ranging from near-Earth to 2.8 AU.
NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process — oversubsubscription and how to “fairly” reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.
NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. As part of an investigation into improved efficiency and responsiveness, we have been exploring and prototyping the infusion of a ”demand access” model into the DSN scheduling process. Today, DSN is fully pre-scheduled in advance, and many users rely on a stable schedule to plan their own spacecraft activities, weeks in advance of execution. However, a new class of missions is emerging that may not be scheduled as far in advance, and may be event-driven in coming across science targets at unpredictable times. These users could take advantage of an on-demand mechanism to download data. Simulations have shown that such a mechanism could improve latency (time from data collection to download) by 2x, as well as more efficiently utilize the available DSN antennas. In this paper, we describe a prototype of a demand access process and how it addresses the challenges of co-existing with a staticallyscheduled body of missions, while providing the benefits of lower latency science data return.
Flagship science missions are not alone in Deep Space thanks to BioSentinel, a 6U spacecraft launched on Artemis-1. BioSentinel is one of the longest operating CubeSats beyond cislunar space. The subsystems and COTS components of the BioSentinel bus are a template for future deep space missions, and the lessons learned from over a year of operations will enable improved performance for the next missions. BioSentinel achieved its unprecedented performance for an SLS secondary payload due to preparation, planning, and a robust design. Pre-launch antenna and interface testing with both DSN and ESA confirmed command and data pathways and allowed for operational flexibility in the critical early hours post-deployment. Mission Operations simulations prior to launch identified potential risks and primed operators to respond in flight, preparing the team to react quickly to successfully detumble the spacecraft and enter a power-positive state. The spacecraft would not have survived without the inclusion of the trailblazing 3D-printed composite cold gas propulsion system. The non-standard tank geometry enabled efficient use of the limited space available in the CubeSat, as well as the capability to detumble the spacecraft and manage momentum, while providing sufficient margin to execute potential delta-V maneuvers. The Iris radio has operated for over 18 months with no significant issues. Initial Iris performance estimates have been accurate throughout the mission. BioSentinel continues to collect data on thermal conditions and to validate our performance models with real-world knowledge. We have received exemplary support from our DSN partners. Following the conclusion of the primary science mission, the Linear Energy Transfer (LET) Spectrometer continued to collect solar and galactic radiation data from its location in heliocentric orbit. The free space dataset offered by the BioSentinel LET is a valuable source of data for model validation and future mission planning. As the spacecraft travels farther from Earth it is poised to provide longitudinally distributed measurements of solar particle events during solar maximum. The lessons learned from BioSentinel suggest key areas to enhance performance. The ability to upload modified flight software can increase the stability of memory management. Additional heaters in the propulsion system design have already proven successful on the Starling mission. Streamlining mission operations can reduce costs, increase data return, and better utilize DSN time. Enhancements such as these will facilitate reliable, long-duration deep space exploration using the proven BioSentinel 6U CubeSat bus.
The objectives, functions, and organization of the Deep Space Network are summarized. The deep space instrumentation facility, the ground communications facility, and the network control system are described. Other areas reported include: Helios Mission support, DSN support of the Mariner Mars 1971 extended mission, Mariner Venus/Mercury 1973 mission support, Viking mission support, radio science, tracking and ground-based navigation, network control and data processing, and deep space stations.
Providing the necessary exercise capability to protect crew health for deep space missions will bring new sets of engineering and research challenges. Exercise has been found to be a necessary mitigation for maintaining crew health on‐orbit and preparing the crew for return to earth's gravity. Health and exercise data from Apollo, Space Lab, Shuttle, and International Space Station missions have provided insight into crew deconditioning and the types of activities that can minimize the impacts of microgravity on the physiological systems. The hardware systems required to implement exercise can be challenging to incorporate into spaceflight vehicles. Exercise system design requires encompassing the hardware required to provide mission specific anthropometrical movement ranges, desired loads, and frequencies of desired movements as well as the supporting control and monitoring systems, crew and vehicle interfaces, and vibration isolation and stabilization subsystems. The number of crew and operational constraints also contribute to defining the what exercise systems will be needed. All of these features require flight vehicle mass and volume integrated with multiple vehicle systems. The International Space Station exercise hardware requires over 1,800 kg of equipment and over 24 m3 of volume for hardware and crew operational space. Improvements towards providing equivalent or better capabilities with a smaller vehicle impact will facilitate future deep space missions. Deep space missions will require more understanding of the physiological responses to microgravity, understanding appropriate mitigations, designing the exercise systems to provide needed mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.
Progress on Deep Space Network (DSN) supporting research and technology is presented, together with advanced development and engineering, implementation, and DSN operations of flight projects. The DSN is described. Interplanetary and planetary flight projects and radio science experiments are discussed. Tracking and navigational accuracy analysis, communications systems and elements research, and supporting research are considered. Development of the ground communications and deep space instrumentation facilities is also presented. Network allocation schedules and angle tracking and test development are included.
Future NASA deep space missions will fly advanced high resolution imaging instruments that will require high bandwidth links to return the huge data volumes generated by these instruments. Optical communications is a key technology for returning these large data volumes from deep space probes. Yet to cost effectively realize the high bandwidth potential of the optical link will require deployment of ground receivers in diverse locations to provide high link availability. A recent analysis of GOES weather satellite data showed that a network of ground stations located in Hawaii and the Southwest continental US can provide an average of 90% availability for the deep space optical link. JPL and AFRL are exploring the use of large telescopes in Hawaii, California, and Albuquerque to support the Mars Telesat laser communications demonstration. Designed to demonstrate multi-Mbps communications from Mars, the mission will investigate key operational strategies of future deep space optical communications network.