Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployable”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Aerosol-Radiation-Cloud Interactions in the South-East Atlantic: Results from the ORACLES-2016 Deployment and a First Look at ORACLES-2017 and Beyond

Seasonal biomass burning (BB) in Southern Africa during the Southern hemisphere spring produces almost a third of the Earth's BB aerosol particles. These particles are lofted into the mid-troposphere and transported westward over the South-East (SE) Atlantic, where they interact with one of the three semi-permanent subtropical stratocumulus (Sc) cloud decks in the world. These interactions include adjustments to aerosol-induced solar heating and microphysical effects. The representation of these interactions in climate models remains highly uncertain, because of the scarcity of observational constraints on both, the aerosol and cloud properties, and the governing physical processes. The first deployment of the NASA P-3 and ER-2 aircraft in the ORACLES (ObseRvations of Aerosols Above Clouds and Their IntEractionS) project in August/September of 2016 has started to fill this observational gap by providing an unprecedented look at the SE Atlantic cloud-aerosol system. We provide an overview of the first deployment, highlighting aerosol absorptive and cloud-nucleating properties, their vertical distribution relative to clouds, the locations and degree of aerosol mixing into clouds, cloud changes in response to such mixing, and cloud top stability relationships to the aerosol. We also expect to describe preliminary results of the second ORACLES deployment from Sao Tome and Pri­ncipe in August 2017. We will make an initial assessment of the differences and similarities of the BB plume and cloud properties as observed from a deployment site near the plume's northern edge. We will conclude with an outlook for the third ORACLES deployment in October 2018.

Redemann, Jens↗

Multiple Boom Deployment

Some embodiments of the invention include a boom deployment system. The boom deployment system, for example, may include a housing, a spool, a first boom, and a second boom. The spool may be disposed within the housing and configured to rotate around an axis that is fixed relative to the housing. The first boom and/or the second boom may have a cylindrical shape in a deployed configuration, a flattened shape in a stowed configuration, and a slit that extends along the longitudinal length of the boom in the deployed configuration. The first boom and/or the second boom may be stowed in the stowed configuration flattened and wrapped around the spool. The first boom and/or the second boom may transition from the stowed configuration to the deployed configuration as the spool rotates around the axis.

Turse, Dana↗

Ground demonstration of a spinning solar sail deployment concept

The dynamics of spin-deployment of a subscale solar sail concept (2.5-micron thick mylar film, 80-cm diameter) is investigated herein experimentally in the laboratory environment. To gain insight into the practicality of the deployment scheme, a tether configuration emulating the sail film was first deployed successfully, using the same experiment design. With the exception of some handling issues, the ultra-thin mylar film was also successfully deployed without entanglement. Design details and observations of both experiments are discussed. Additionally, results of analytical simulations to study the dynamics of tether deployment are given.

Leland, R.↗

Demonstration of Deployment Accuracy of the Starshade Inner Disk Subsystem

We present experimental results that demonstrate the required in-plane deployment accuracy of the starshade Inner Disk Subsystem (IDS). This effort was to address Milestone 7C of the Starshade Technology Activity S5, which requires that the in-plane deployment accuracy of the petal interfaces on the IDS be within +/-300um. A full-scale 10m-diameter IDS prototype was constructed. This prototype comprised a medium-fidelity perimeter truss, medium-fidelity spokes, and a low-fidelity optical shield (OS). The testbed also included gravity compensation systems and a laser tracker metrology system. The post-processed measurement uncertainties of the laser tracker were less than 30um at the 3 sigma level. Design, engineering and fabrication of these components was done by JPL, Tendeg, and Roccor. Testing was performed at the Tendeg facility in Louisville, Colorado. The IDS prototype was deployed 22 times and the locations of petal interfaces on the IDS were measured after each deployment. Based on this data, tolerance intervals were calculated that would contain 99.73% of future deployment accuracy errors with 90% confidence. These tolerance intervals are conservative estimates for 3 sigma bounds. The tolerance intervals for the three pertinent error components were found to be within the required allocations, with at least 19% margin.

Turse, Dana↗

Zero-G Experiments of the BionicWingsat - A 2U-Cubesat with Deployable, Biologically-Inspired Wings

In this paper, recent testing of a novel deployable structure with several potential applications in space will be described, with the focus on performed deployment experiments in a DLR Zero-g flight campaign and in ground tests. Through a cooperative effort of the German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA), a biologically-inspired structurally-integrated membrane featuring distributed functional elements has been developed and integrated into the 2U CubeSat called BionicWingSat. Such a membrane structure could be useful for all sorts of applications in which a relatively flat area is desirable such as solar sails, drag sails, or solar shades. For SmallSats and CubeSats, the design proposed also has the desirable property of being self-deploying without the need for powered deployment mechanisms. Building on previous work inspired by the wings of earwigs, the research presented in this paper focuses on testing of developed design concepts for such structural systems. To do so 24 fully integrated wings on two BionicWingSats in 2U Cubesat format were experimentally deployed in a microgravity environment during a dedicated DLR Zero-g flight campaign in 2021. The results of these experiments, the built hardware and test articles, the test arrangement, as well as a comparison to ground tests are discussed in this paper.

Spacecraft structures↗

DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are beinglhave been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FX Hg Fogging Fixative Deployment for Mercury Vapor Suppression

Idaho National Laboratory’s (INL) FX Hg fixative solution was deployed at the Y-12 Complex in Oak Ridge, Tennessee to support disposal of mercury-contaminated metal debris. The fixative was dispensed via fogging. Fogging infiltrates non-line-of-sight areas improving fixative coating on complex geometries such as debris piles. FX Hg is the mercury vapor controlling derivative of INL’s FX2 fixative. FX2 was jointly developed with the National Nuclear Laboratory of the United Kingdom, and INL developed the FX Hg derivative to suppress mercury vapor generation. The Y-12 deployment was performed in concert with cleanup contractor UCOR. A dumpster filled with debris was fogged with FX Hg. The material was acceptable as municipal landfill waste, save for the mercury vapor levels measured. If the mercury vapor generation rate could be sufficiently reduced, disposal costs for this waste would be dramatically reduced. FX Hg had previously proven effective at significantly reducing mercury vapor generation rates in bench scale testing at INL. This deployment was the first field scale deployment of the method. Efficacy results were underwhelming, but interpretation of the outcome is complicated by a paucity of hard data. Methods for improving data capture and analysis are analyzed. Operational difficulties associated with scaling the process up and process improvements for future deployments are discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Decision Support Tool for Planning Neighborhood-Scale Deployment of Low-Speed Shared Automated Shuttles

Increasing interest and investment in connected, automated, and electric vehicles, and mobility-as-a-service concepts are paving the way for the next major shift in transportation through automated and shared mobility. The initial excitement towards rapid deployment and adoption of automated vehicles has subsided, and low-speed automated shuttles are emerging as a more pragmatic pathway for introducing automated mobility in geo-fenced districts. Such shuttles hold the promise to provide a viable alternative for serving short trips in urban districts with high travel densities. As interest in low-speed automated shuttle systems (to improve urban mobility) increases, the need for tools that can inform communities regarding benefits or dis-benefits of automated shuttle deployments is imminent. However, most of the existing transportation planning and simulation tools are not capable of handling emerging shared automated mobility options. This presentation presents a microscopic simulation toolkit that can be used by cities and communities to plan for the deployment of low-speed automated shuttles systems, as well as other shared mobility options. Labeled as the Automated Mobility District (AMD) modeling and simulation toolkit, the proposed decision support tool can help cities evaluate the mobility and sustainability impacts of deploying shared automated vehicles in geofenced regions. This paper presents a description of the toolkit, as well as a sample scenario analysis for the deployment of low-speed automated shuttles in Greenville, South Carolina. Results from the scenario study demonstrate the effectiveness of the proposed simulation toolkit in planning for advanced mobility systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AP1000{sup R} licensing and deployment in the United States

In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178

In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Deployment of the Mobile Arm Retrieval System (MARS) - 12187

Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Science Plan for the Deployment of the Third ARM Mobile Facility to the Southeastern United States at the Bankhead National Forest, Alabama (AMF3 BNF)

In 2018, the U.S. Department of Energy (DOE) held a workshop for the Atmospheric Radiation Measurement (ARM) (Mather and Voyles 2013) user facility to discuss critical climate challenges and locations where key ARM Mobile Facility (AMF) observational assets could impact Earth system modeling (ESM). As an outcome, the southeast United States (SE U.S.) was identified as a high-priority region to target climate-process studies that promote a deeper understanding of the climate system and bolster ARM interactions with the community to drive ESM advancement. The DOE ARM user facility is a globally recognized leader in deploying and operating strategically located observation sites around the world for studying the properties of aerosols and clouds and their interaction with radiation, precipitation, and the Earth’s surface. In partnering with the DOE Atmospheric System Research (ASR) program, ARM solicited a multi-agency Site Science Team approach to provide input and close interaction with ARM management towards a successful SE U.S. deployment of the ARM third Mobile Facility (AMF3) (Miller et al. 2016). These efforts included identifying key locations, science drivers and instruments, and measurement strategies to address the wider climate-process needs and ESM improvement. Community input served a vital role in establishing, refining, and informing the relevant drivers and decisions regarding this AMF3 deployment. The team has identified Northern Alabama (N. AL) as regionally representative to unlock the key opportunities that will improve our understanding and model representation of aerosol, cloud, and land surface processes and their couplings in the SE U.S. A defining aspect of the AMF3 deployment is its commitment to long-term (anticipated five-year) observations to mitigate potential seasonal-to-annual variability that often limits appropriate attribution of phenomena to local or larger-scale processes. The proposed location may leverage nearby surface networks and multi-agency and partner assets to enrich this multi-year deployment. One motivation is to understand the role of spatiotemporal variability (thermodynamic, land-surface) across aspects of the climate system, with our AMF3 team anticipating future demands on characterizing the relationships between local-to-regional cloud development and surface processes across a diverse patchwork of natural, managed, and urban landscapes as found throughout the N. AL regions. The main site targets an intact, representative, forested region – the Bankhead National Forest (BNF) – underscoring further team commitment to regionally important land atmosphere two-way interactive studies “from the canopy to the clouds”, with enhanced tower instrumentation augmenting traditional ARM capabilities adjacent to this site. Multiple supplemental sites will also be distributed across this region, prioritizing added needs for biodiversity. Anticipated high-priority cloud science themes will target N. AL as a regional SE U.S. hotbed for high-impact weather, convective cloud onset, and shallow to-deep cloud transitioning. Anticipated aerosol drivers will focus on chemical processes that control the evolution of organic aerosol, the seasonality and spatial distribution of water vapor and particle-phase water, and its role on aerosol optical properties. Anticipated land atmosphere drivers consider the two-way feedbacks between surface influence on aerosols, clouds, and precipitation properties and the associated radiative impacts on plant physiology and canopy-scale fluxes. Emphasis will include the study of the impact of surface processes on aerosols via precursor emission, and on clouds via moisture flux and thermal development.

Doppler lidar, aerosols, convection↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FX Hg Fogging Fixative Deployment for Mercury Vapor Suppression - 20410

Idaho National Laboratory's (INL) FX Hg fixative solution was deployed at the Y-12 National Security Complex in Oak Ridge, Tennessee to support disposal of mercury-contaminated metal debris. The fixative was dispensed via fogging. Fogging infiltrates non-line-of-sight areas improving fixative coating on complex geometries such as debris piles. FX Hg is the mercury vapor controlling derivative of INL's FX2 fixative. FX2 was jointly developed with the National Nuclear Laboratory of the United Kingdom, and INL developed the FX Hg derivative to suppress mercury vapor generation. The Y-12 deployment was performed in concert with UCOR (URS CH2M Oak Ridge), the cleanup contractor for Y-12. A dumpster filled with debris was fogged with FX Hg. The debris was acceptable as municipal landfill waste, save for the mercury vapor levels measured. If the mercury vapor generation rate could be sufficiently reduced, disposal costs for this waste would be dramatically reduced. FX Hg had previously proven effective at significantly reducing mercury vapor generation rates in bench scale testing at INL. This deployment was the first field-scale deployment of the method. Efficacy results were underwhelming, but interpretation of the outcome is complicated by a paucity of hard data. Methods for improving data capture and analysis are analyzed. Operational difficulties associated with scaling up the process and process improvements for future deployments are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Deployment Characterization of Glass Fiber-Reinforced Thermoset and Thermoplastic Composite Tidal Turbine Blades

In 2021, the National Renewable Energy Laboratory (NREL) supported Verdant Power with the most successful tidal energy deployment in U.S. history. Three of their Gen5d 5 m turbines were deployed as part of the Roosevelt Island Tidal Energy project. Initially, the three deployed rotors were manufactured from glass fiber-reinforced epoxy composites. Midway through the deployment, one rotor was replaced with one manufactured at NREL. The new rotor utilized a novel infusible thermoplastic resin system (Elium from Arkema). Since the deployment, one epoxy rotor and one thermoplastic rotor were returned to NREL for continued materials and manufacturing research. The two rotors underwent full-scale structural testing before being sectioned and cut into specimens for a variety of manufacturing quality tests, thermomechanical characterization, and evaluation of material performance in marine environments to understand the key differences between the fiberglass-reinforced epoxy and Elium composites used for the respective rotors. Matrix burn-off tests showed that the Elium blades had a considerably higher fiber volume fraction compared to the epoxy blades (61% vs. 49%). Environmental aging of the specimens showed that the epoxy laminates absorbed more water over the conditioning period; however, it was determined that the Elium laminates had higher diffusion coefficients, so they initially absorbed water faster. Finally, one full epoxy blade and one full Elium blade were conditioned at ambient temperatures for up to 11 months, while periodic mass measurements were taken. The datasets were extrapolated to assume a full 20-year operational life span, and it was determined that the blades would not reach full saturation during that time span.

composite manufacturing↗

Summary Analysis of Different Offshore Wind Capacity Density Drivers in Proposed U.S. Projects and Impacts on Progress Towards State and Federal Deployment Targets

Understanding the density of offshore wind development - or the "capacity density" - is important for state and federal offshore wind planning efforts and to track progress towards policy goals. NREL has traditionally assumed a capacity density of 3 megawatts per square kilometer (MW/km2) when estimating the U.S. project pipeline (Musial et al. 2022), but capacity densities for existing European offshore wind farms ranged from 2-19 MW/km2 (Borrmann et al. 2018). We track the expected capacity densities of the proposed U.S. projects in the East Coast and make an analysis by state and by developer to identify what are the capacity density norms in the industry and whether the state in which the development efforts are taking place has some impact on capacity density. We also analyze the effects of the area occupied by station keeping systems on capacity density for lease areas dedicated to floating projects and provide a list of main capacity density drivers. This summary analysis sets a baseline to study how different capacity density drivers could impact the progress towards state and federal deployment targets. Given the currently delineated Renewable Energy Areas in the Outer Continental Shelf (OCS) and the basis from the summary analysis, we estimate the expected offshore wind deployment over time federally and by state and compare it to the state and federal deployment targets. The proposed analysis helps identify gaps and needs to meet state and federal targets, which provides sufficient information to propose strategic supply chain and policy planning with the objective of meeting deployment goals.

capacity density↗

Topological Assembly of a Deployable Hoberman Flight Ring from DNA

Deployable geometries are finite auxetic structures that preserve their overall shapes during expansion and contraction. The topological behaviors emerge from intricately arranged elements and their connections. Despite the considerable utility of such configurations in nature and in engineering, deployable nanostructures have never been demonstrated. In this paper, a deployable flight ring, a simplified planar structure of Hoberman sphere is shown, using DNA origami. The DNA flight ring consists of topologically assembled six triangles in two layers that can slide against each other, thereby switching between two distinct (open and closed) states. The origami topology is a trefoil knot, and its auxetic reconfiguration results in negative Poisson’s ratios. This work shows the feasibility of deployable nanostructures, providing a versatile platform for topological studies and opening new opportunities for bioengineering.

59 BASIC BIOLOGICAL SCIENCES↗