Search NASA⌕ Search

SEARCH · Search NASA

Results for “editing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

The Cambridge encyclopedia of space (revised edition)

A comprehensive and intensively illustrated development history is presented for spaceflight, ranging over its basic concepts' speculative and fictional origins, the historical roots of rocket-related technologies, and the scientific accomplishments of earth orbit and interplanetary missions to date. Attention is given to propulsion systems, spaceflight launch centers, satellite systems, and solar system exploration by the U.S. and the Soviet Union. Current space-related activities encompass the meteorology, remote sensing, telecommunications and direct broadcasting, and navigation functions of unmanned satellites, as well as such manned spacecraft roles as medical and materials science research. The military uses of space, and increasingly important space industrialization concepts, are discussed as well.

D'Allest, Frederic↗

Mission safety evaluation report for STS-33: Postflight edition

Space Transportation System 33 (STS-33) safety risk factors that represent a change from previous flights, factors from previous flights that have an impact on this flight, and the factors that are not unique to this flight are discussed. While some changes to the safety risk baseline are included to highlight their significance in risk level change, the primary purpose is to insure that changes which were too late to include in formal changes through the Failure Modes and Effects Analysis/Critical Items List and Hazard Analysis process are documented along with the safety position, which includes the acceptance rationale.

Hill, William C.↗

Mission safety evaluation report for STS-35: Postflight edition

Space Transportation System 35 (STS-35) safety risk factors that represent a change from previous flights that had an impact on this flight, and factors that were unique to this flight are discussed. While some changes to the safety risk baseline since the previous flight are included to highlight their significance in risk level change, the primary purpose is to insure that changes which were too late too include in formal changes through the Failure Modes and Effects Analysis/Critical Items List (FMEA/CIL) and Hazard Analysis process are documented along with the safety position, which includes the acceptance rationale.

Hill, William C.↗

Mission safety evaluation report for STS-48, postflight edition

Space Shuttle Discovery was launched into a 57 deg inclination orbit from the Kennedy Space Center (KSC) Launch Complex 39A at 7:11 p.m. EDT on 12 Sep. 1991. STS-48 was the second mission since return-to-flight to have KSC as the planned end-of-mission landing site, and the first mission to have a planned night landing at KSC. However, due to weather conditions at KSC, Discovery flew one extra orbit and landed at Edwards AFB, Calif. at 3:38 a.m. EDT on 18 Sep. 1991. Operation of all systems was generally satisfactory during the 5 day mission. On flight day 3, the Upper Atmospheric Research Satellite (UARS) was deployed from Discovery's payload bay 350 statute miles above Earth. This orbiting observatory will study mankind's effects on the planet's atmosphere and its shielding ozone layer. STS-48 safety risk factors are addressed that represent a change from previous flights, factors from previous flights that had an impact on this flight, and factors that are unique to this flight.

Clatterbuck, Guy E.↗

Mission safety evaluation report for STS-39, postflight edition

After a delay of approximately 2 months due to a rollback from the pad to replace the External Tank door lug housing, Space Shuttle Discovery was launched from NASA-Kennedy at 7:33 a.m. Eastern Daylight Time on 28 April 1991. STS-39 was the first unclassified DoD Shuttle mission. On 28 April, countdown proceeded normally through the T-20 minute hold. No significant problems were encountered except for the Operations Sequence-2 recorder starting unexpectedly; it was stopped by an uplink command. Discovery landed on KSC runway 15 at 2:55 p.m. EDT on 6 May 1991. This was the second time in 6 months that the Space Shuttle was diverted to KSC for landing because of high winds at Edwards AFB, Calif. This was also the 7th of 40 Shuttle missions to land at KSC in the history of the Space Shuttle Program. The Main Landing Gear outer right tire shredded 3 of the 16 cords due to either an uneven landing or a maximum force breaking test during rollout. Contributing factors to the tire cord shredding were the development of last minute crosswinds and reluctance of the ground controllers to distract the Shuttle pilots with warnings of the low flight path. As a corrective action, communication procedures will be modified for future flights.

Hardie, Kenneth O.↗

Mission safety evaluation report for STS-38, postflight edition

After several months delay due to Liquid Hydrogen (LH2) leaks in the External Tank (ET) 17 in LH2 umbilical disconnect, Atlantis was launched at 6:48 p.m. Eastern Standard Time on 15 Nov. 1990. Atlantis was cleared for launch after the replacement of the ET 17 in umbilical disconnect and a successful tanking test on 24 Oct. 1990. No technical concerns were encountered during the countdown. The end of the STS-38 mission was extended by one day because of high crosswinds at the primary landing site, Edwards Air Force Base (EAFB), Calif. On the next day, 20 Nov. 1990, the winds were too high for a safe landing at EAFB, and a decision was made to select the Shuttle Landing Facility (SLF) at the Kennedy Space Center (KSC) at the primary landing site. The deorbit burn was performed on orbit 79 of the STS-38 mission. Reentry and descent were effected with no problems. Postlanding inspection of Atlantis' exterior found little evidence of damage. There has been a concern about returning an Orbiter to KSC, because the last mission to do so experienced tire failure. Atlantis' tires and brakes were in excellent condition with no indication of excessive wear.

Hill, William C.↗

Mission safety evaluation report for STS-37, postflight edition

STS-37/Atlantis was launched on April 5, 1991 from Kennedy Space Center launch complex 39B at 9:23 a.m. Eastern Standard Time (EST). Launch was delayed 4 minutes 45 seconds because of safety concerns about the low cloud ceiling and the wind direction in the potential blast area. Based on the limited number and type of inflight anomalies encountered, the Space Shuttle operated satisfactorily throughout the STS-37 mission. A contingency EVA was performed by the crew on Flight Day (FD) 3 to free a sticky Gamma Ray Observatory (GRO) high gain antenna, after which the GRO primary payload was successfully deployed by the Orbiter's Remote Manipulator System. The GRO, which weighed just over 35,000 lbs, was the heaviest NASA science satellite ever deployed by the Space Shuttle into low Earth orbit. The scheduled entry/landing on FD 6 was waved off for one day due to high wind conditions at Edwards Air Force Base. Atlantis landed on FD 7, 11 April 1991 on Edwards AFB lakebed runway 33 at 9:55 a.m. Eastern Daylight Time.

Hill, William C.↗

Mission Safety Evaluation Report for STS-43, Postflight Edition

Some of the topics covered include: (1) an STS-43 mission summary; (2) safety risks factors/issues; (3) resolved STS-43 safety risk factors; (4) STS-40 inflight anomalies; (5) STS-37 inflight anomalies; and (6) STS-43 inflight anomalies. Background information and a list of acronyms are also presented.

Hill, William C.↗

Mission safety evaluation report for STS-29, postflight edition

The topics covered include: (1) an STS-29 mission summary; (2) safety risk factors/issues; (3) resolved STS-29 safety risk factors; (4) STS-27 flight anomalies; (5) STS-26 flight anomalies; and (6) the STS-29 official inflight anomaly report. Background information and a list of acronyms are also presented.

Source record↗

Mission safety evaluation report for STS-30, postflight edition

The topics covered include: (1) an STS-30 mission summary; (2) safety risk factors/issues; (3) resolved STS-30 safety risk factors; (4) STS-29 inflight anomalies; (5) STS-27 inflight anomalies; and (6) the STS-30 official inflight anomaly report. Background information and a list of acronyms are also presented.

Finkel, Seymour I.↗

Mission Safety Evaluation Report for STS-32, Postflight Edition

The topics covered include: (1) an STS-32 mission summary; (2) safety risk factors/issues; (3) resolved STS-32 safety risk factors; (4) STS-32 inflight anomalies; (5) STS-28 inflight anomalies; and (6) STS-32 inflight anomalies. Background information and a list of acronyms are also presented.

Hill, William C.↗

Mission Safety Evaluation Report for STS-36, Postflight Edition

The topics covered include: (1) an STS-36 mission summary; (2) safety risk factors/issues; (3) resolved STS-36 safety risk factors; (4) STS-32 inflight anomalies; (5) STS-34 inflight anomalies; and (6) STS-36 inflight anomalies. Background information and a list of acronyms are also presented.

Hill, William C.↗

Compiling and editing agricultural strata boundaries with remotely sensed imagery and map attribute data using graphics workstations

The USDA presently uses labor-intensive photographic interpretation procedures to delineate large geographical areas into manageable size sampling units for the estimation of domestic crop and livestock production. Computer software to automate the boundary delineation procedure, called the computer-assisted stratification and sampling (CASS) system, was developed using a Hewlett Packard color-graphics workstation. The CASS procedures display Thematic Mapper (TM) satellite digital imagery on a graphics display workstation as the backdrop for the onscreen delineation of sampling units. USGS Digital Line Graph (DLG) data for roads and waterways are displayed over the TM imagery to aid in identifying potential sample unit boundaries. Initial analysis conducted with three Missouri counties indicated that CASS was six times faster than the manual techniques in delineating sampling units.

Cheng, Thomas D.↗