Search NASA⌕ Search

SEARCH · Search NASA

Results for “error budget”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Microwave power beaming for long range energy transfer

Current studies by NASA have identified space solar power as a potential long term viable candidate for efficient energy transfer at orbital ranges using a microwave beam. This paper will describe some of the power-aperture relationships leading to a potential feasible design of a power beaming system. The topics include a discussion of the system constraints, the transmitter and spaceborne array configuration, and the error budget levied by microwave system requirements.

Nalos, E. J.↗

The Seasat-A synthetic aperture radar system

The paper discusses the Seasat-A synthetic aperture radar system (SAR). The objective of this system was to detect ocean waves from orbital altitudes. A SAR system operating at 1275 MHz was designed to meet this objective; the choice of wavelength resulted from the imagery obtained by aircraft during 1972 to 1974 and the ease of implementation. The Seasat-A SAR system was turned-on in orbit on July 4, 1978, and gathered imagery until the spacecraft bus failed in orbit in Oct. 1978. The hardware including the antenna, the radar sensor, and data-link subsystem, and the SAR data processing subsystem are described; the radar performance including the SAR system error budget and various SAR imageries are presented, concluding that the performance of the Seasat-A SAR system met all of its parameters on at least some of the imagery.

Jordan, R. L.↗

Achievable flatness in a large microwave power transmitting antenna

A dual reference SPS system with pseudoisotropic graphite composite as a representative dimensionally stable composite was studied. The loads, accelerations, thermal environments, temperatures and distortions were calculated for a variety of operational SPS conditions along with statistical considerations of material properties, manufacturing tolerances, measurement accuracy and the resulting loss of sight (LOS) and local slope distributions. A LOS error and a subarray rms slope error of two arc minutes can be achieved with a passive system. Results show that existing materials measurement, manufacturing, assembly and alignment techniques can be used to build the microwave power transmission system antenna structure. Manufacturing tolerance can be critical to rms slope error. The slope error budget can be met with a passive system. Structural joints without free play are essential in the assembly of the large truss structure. Variations in material properties, particularly for coefficient of thermal expansion from part to part, is more significant than actual value.

Ried, R. C.↗

Consideration for high accuracy radiation efficiency measurements for the Solar Power Satellite (SPS) subarrays

The transmit beam and radiation efficiency for 10 metersquare subarray panels were quantified. Measurement performance potential of far field elevated and ground reflection ranges and near field technique were evaluated. The state-of-the-art of critical components and/or unique facilities required was identified. Relative cost, complexity and performance tradeoffs were performed for techniques capable of achieving accuracy objectives. It is considered that because of the large electrical size of the SPS subarray panels and the requirement for high accuracy measurements, specialized measurement facilities are required. Most critical measurement error sources have been identified for both conventional far field and near field techniques. Although the adopted error budget requires advances in state-of-the-art of microwave instrumentation, the requirements appear feasible based on extrapolation from today's technology. Additional performance and cost tradeoffs need to be completed before the choice of the preferred measurement technique is finalized.

Kozakoff, D. J.↗

Development of a sub-miniature rubidium oscillator for SEEKTALK application

Warm-up and size challenges to oscillator construction are presented as well as the problems involved in these tasks. The performance of M-100 military rubidium oscillator is compared to that of a subminiture rubididum oscillator (M-1000). Methods of achieving 1.5 minute warm-up are discussed as well as improvements in performance under adverse environmental conditions, including temperature, vibration, and magnetics. An attempt is made to construct an oscillator error budget under a set of arbitrary mission conditions.

Fruehauf, H.↗

Definition of optical systems payloads

The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.

Downey, J. A., III↗

A rubidium clock for GPS

The design objectives and approach; the more important design features; the signal parameters and error budget; and early test results in the development of a second-source rubidium frequency standard for use in the GPS navigation satellites are discussed. Tests of a breadboard version of the RFS show that the measured time-domain stability is within the goal specification. The results are uncorrected for the conribution of the reference and are probably limited by the reference stability in the medium term region. The Rb reference is bbetter in the medium term region, but the Cs reference is etter at 10,000 seconds and longer, probably because of the barometric sensitivity of the rubidium reference unit.

Riley, W. J.↗

The Phoretic Motion Experiment (PME) definition phase

The aerosol generator and the charge flow devices (CFD) chamber which were designed for zero-gravity operation was analyzed. Characteristics of the CFD chamber and aerosol generator which would be useful for cloud physics experimentation in a one-g as well as a zero-g environment are documented. The Collision type of aerosol generator is addressed. Relationships among the various input and output parameters are derived and subsequently used to determine the requirements on the controls of the input parameters to assure a given error budget of an output parameter. The CFD chamber operation in a zero-g environment is assessed utilizing a computer simulation program. Low nuclei critical supersaturation and high experiment accuracies are emphasized which lead to droplet growth times extending into hundreds of seconds. The analysis was extended to assess the performance constraints of the CFD chamber in a one-g environment operating in the horizontal mode.

Eaton, L. R.↗

Spaceborne scanner imaging system errors

The individual sensor system design elements which are the priori components in the registration and rectification process, and the potential impact of error budgets on multitemporal registration and side-lap registration are analyzed. The properties of scanner, MLA, and SAR imaging systems are reviewed. Each sensor displays internal distortion properties which to varying degrees make it difficult to generate on orthophoto projection of the data acceptable for multiple pass registration or meeting national map accuracy standards and is also affected to varying degrees by relief displacements in moderate to hilly terrain. Nonsensor related distortions, associated with the accuracy of ephemeris determination and platform stability, have a major impact on local geometric distortions. Platform stability improvements expected from the new multi mission spacecraft series and improved ephemeris and ground control point determination from the NAVSTAR/global positioning satellite systems are reviewed.

Prakash, A.↗

Data vs. information: A system paradigm

The data system designer requires data parameters, and is dependent on the user to convert information needs to these data parameters. This conversion will be done with more or less accuracy, beginning a chain of inaccuracies which propagate through the system, and which, in the end, may prevent the user from converting the data received into the information required. The concept to be pursued is that errors occur in various parts of the system, and, having occurred, propagate to the end. Modeling of the system may allow an estimation of the effects at any point and the final accumulated effect, and may prove a method of allocating an error budget among the system components. The selection of the various technical parameters which a data system must meet must be done in relation to the ability of the user to turn the cold, impersonal data into a live, personal decision or piece of information.

Billingsley, F. C.↗

The solar spectral irradiance 1200-3184 A near solar maximum - July 15, 1980

Results of a sounding rocket program designed to measure the total solar ultraviolet input to the upper atmosphere are presented. Two spectrometers, a far-ultraviolet (FUV) to cover 1160-1850 A, and a middle ultraviolet (MUV) to cover 1600-3184 A, were launched piggy-back on a Black Brant rocket to an altitude of 325 km on 7-15-1980. Tables of the detailed error budgets of the reclaimed instruments are provided. Comparisons are made with results of a 1979 flight, and of 1979 and 1980 flights with solar minimum results of Rottman (1981), and reveal significant solar spectral irradiance variability from solar minimum to maximum. MUV readings below 2100 A were 14% higher in 1980 and 14% lower in 1979 than Rottman's data, and it is concluded that a significant variability occurred at wavelengths less than 1800 A.

Mount, G. H.↗

Preliminary study of GPS orbit determination accuracy achievable from worldwide tracking data

The improvement in the orbit accuracy if high accuracy tracking data from a substantially larger number of ground stations is available was investigated. Observations from 20 ground stations indicate that 20 cm or better accuracy can be achieved for the horizontal coordinates of the GPS satellites. With this accuracy, the contribution to the error budget for determining 1000 km baselines by GPS geodetic receivers would be only about 1 cm.

Larden, D. R.↗

Ocean wind field measurement performance of the ERS-1 scatterometer

The Active Microwave Instrumentation (AMI), which will be implemented on the ERS-1, is a 5.3 GHz multipurpose radar for land surface imaging, ocean wave spectrum measurement and wind observations over oceans. The imaging and wave measurements apply Synthetic Aperture Radar (SAR) techniques, while wind field detection is performed by the Scatterometer as part of the AMI. The Scatterometer system design was developed and optimized with the aid of a performance simulator. This paper, aimed at giving an overview, is presented about the: (1) ERS-1 Scatterometer system design; (2) Error budget; and the (3) Overall calibration concept.

Hans, P.↗

Thematic Mapper Image Processing System (TIPS) Processing Status

Radiometric and geometric correction performance is considered. A one quantum level requirement was met in all spectral bands with an occasional band 7 exception. Initial post launch calibration was accomplished. An absolute radiometric calibration is in progress including an investigation of low impact solution to scan striping. Initial and three downstream updates as well as coordination with LANDSAT D' instrument calibration are planned. Methods and problems in measuring geometric correction performance are examined with an emphasis on temporal registration, geodetic registrtion, and the modeling error budget. Planned efforts include eliminating band 2, band 5 chips; continued performance monitoring; calibration of profile, misalignment angles, and filer parameters; studying the need for seasonal geodetic control points; and improvement of the subpixel correlation technique.

Brooks, J.↗

Preliminary study of GPS orbit determination accuracy achievable from worldwide tracking data

The improvement in the orbit accuracy if high accuracy tracking data from a substantially larger number of ground stations is available was investigated. Observations from 20 ground stations indicate that 20 cm or better accuracy can be achieved for the horizontal coordinates of the GPS satellites. With this accuracy, the contribution to the error budget for determining 1000 km baselines by GPS geodetic receivers would be only about 1 cm. Previously announced in STAR as N83-14605

Larden, D. R.↗

The effects of epoxy shrinkage on the Advanced X-ray Astrophysics Facility Technology Mirror Assembly

A method is shown analytically which reduces the effects of epoxy shrinkage for an ultra-high precision X-ray telescope to within the system error budget. The three-dimensional shrinkage effects are discussed with reference to this telescope. The results of the analysis point to the use of an interrupted rather than continuous bond line as the best solution. Discussion of the finite element modelling techniques is included.

Cohen, L. M.↗

Infrared telescope design - Implications from cryogenic tests of fused-silica mirrors

A brief review of results from recent cryogenic tests of fused-silica mirrors is given with consideration of the implications for the design of cooled infrared telescopes. Implications include optical performance with a discusion of the top-down optical error budgeting for the Shuttle Infrared Telescope Facility (SIRTF), thermal properties of the mirrors, and mirror mounting.

Melugin, R. K.↗

Modeling and analysis of pinhole occulter experiment

The objectives were to improve pointing control system implementation by converting the dynamic compensator from a continuous domain representation to a discrete one; to determine pointing stability sensitivites to sensor and actuator errors by adding sensor and actuator error models to treetops and by developing an error budget for meeting pointing stability requirements; and to determine pointing performance for alternate mounting bases (space station for example).

Ring, J. R.↗