Search NASASearch

SEARCH · Search NASA

Results for “extreme environment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

200 records · Page 12

The MuFusE large-volume diamond anvil cell for exploring muon-catalyzed fusion at higher pressures and temperatures

A new large-volume diamond anvil cell (DAC) has been developed for the Muon-catalyzed Fusion (μCF) Experiment (MuFusE), enabling the compression and heating of deuterium–tritium (d–t) mixtures to pressures and temperatures needed to advance μCF research. The MuFusE DAC achieves the large sample volumes necessary for high-precision fusion measurements while integrating cryogenic loading, all-metal sealing, and flexible bellows to maintain a secure environment during cell compression. Combined with remote pneumatic actuation and secondary containment, the DAC safely managed a 25 Ci tritium inventory while providing a clear optical path for in situ measurements of sample pressure and composition via laser spectroscopy. Utilizing 5 mm diameter diamond anvils oriented in the path of a high-intensity muon beam, the apparatus achieved a stable sample volume of 19.2 mm 3 at liquid density, pressures up to 933 MPa and temperatures up to 400 K—benchmarks that significantly exceed previously reported limits for static d–t targets.

Kalow, J. D. [Acceleron Fusion, Inc., Cambridge, M

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1