Search NASA⌕ Search

SEARCH · Search NASA

Results for “facility management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Workflows Community Summit 2024: Future Trends and Challenges in Scientific Workflows

The 2024 Workflows Community Summit report presents the outcomes of a three-day international gathering that brought together 109 experts from 18 countries to discuss future trends and challenges in scientific workflows. The summit focused on six key areas: time-sensitive workflows, convergence of AI and HPC workflows, multi-facility workflows, heterogeneous HPC environments, user experience and interfaces, and FAIR computational workflows. Discussions highlighted emerging challenges such as integrating AI with traditional HPC, managing workflows across diverse facilities, addressing heterogeneity in computing environments, and ensuring workflows are findable, accessible, interoperable, and reusable (FAIR). The report outlines recent advances, ongoing challenges, and provides recommendations for each topic area, emphasizing the need for standardization, improved interoperability, and the development of more sophisticated tools and frameworks to support the evolving landscape of scientific workflows in the era of exascale computing and AI integration.

97 MATHEMATICS AND COMPUTING↗

Resurgence of a Nation’s Radiation Science Driven by Its Nuclear Industry Needs

This article describes the radiation facilities and associated sample preparation, management, and analysis equipment currently in place at the Dalton Cumbrian Facility, a facility which opened in 2011 to support the UK’s nuclear industry. Examples of measurements performed using these facilities are presented to illustrate their versatility and the breadth of research they make possible. Results are presented from research which furthers our understanding of radiation damage to polymeric materials, radiolytic yield of gaseous products in situations relevant to nuclear materials, radiation chemistry in light water reactor cooling systems, material chemistry relevant to immobilization of nuclear waste, and radiation-induced corrosion of fuel cladding elements. Applications of radiation chemistry relevant to health care are also described. Research concerning the mechanisms of radioprotection by dietary carotenoids is reported. An ongoing open-labware project to develop a suite of modular sample handling components suited to radiation research is described, as is the development of a new neutron source able to provide directional beams of neutrons.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Performance Computing Facility Operational Assessment 2022: Oak Ridge Leadership Computing Facility

The Oak Ridge Leadership Computing Facility (OLCF) was established to accelerate scientific discovery by providing world-leading computational performance and advanced data infrastructure. As a US Department of Energy (DOE) Office of Science user facility, the OLCF has managed the successful deployment and operation of a succession of leadership-class resources dedicated to open science. In addition to these resources, the OLCF staff continually strive to develop innovative processes and technologies, improve security, and empower users through allocation management and comprehensive user support and training. These efforts support the advancement of science by the OLCF users and benefit high-performance computing (HPC) facilities around the world. In calendar year (CY) 2022, the OLCF supported 1,681 users and 570 projects and exceeded all targets for user satisfaction. The facility received an average satisfaction score of 4.6 out of 5 on the annual user survey, and 96% of respondents reported a high satisfaction rate with the OLCF overall. Of the 3,212 user tickets submitted in CY 2022, OLCF staff resolved 97% within 3 business days. The facility also introduced several new services for users this year, including weekly virtual office hours with subject matter experts from ORNL and vendor partners; new views in MyOLCF that allow users to analyze allocation and compute usage for a project; the ability to build and run containers on Summit; and improved data visualization support and training resources.

97 MATHEMATICS AND COMPUTING↗

US Department of Energy, Office of Science, High-Performance Computing Facility: 2023 Operational Assessment Oak Ridge Leadership Computing Facility

The Oak Ridge Leadership Computing Facility (OLCF) was established to accelerate scientific discovery by providing world-leading computational performance and advanced data infrastructure. As a US Department of Energy (DOE) Office of Science user facility, the OLCF has managed the successful deployment and operation of a succession of leadership-class resources dedicated to open science. In addition to these resources, the OLCF staff continually strive to develop innovative processes and technologies, improve security, and empower users through effective allocation management and comprehensive user support and training. These efforts support the advancement of science by the OLCF users and benefit high-performance computing (HPC) facilities around the world. In calendar year (CY) 2023, the OLCF supported 1,676 users and 598 projects and exceeded all targets for user satisfaction. The facility received an average satisfaction score of 4.52 out of 5 on the annual user survey, and 94% of respondents reported a high satisfaction rate with the OLCF overall. Of the 3,619 user tickets submitted in CY 2023, OLCF staff resolved 97% within 3 business days. The facility opened Frontier to full scientific operations this year. Two projects conducted on Frontier received the Association for Computing Machinery (ACM) Gordon Bell Prize and the Gordon Bell Special Prize for Climate Modeling, and a third earned a nomination as a Gordon Bell Prize finalist. The facility’s previous flagship machine, Summit, gained new life and was extended through 2024 in part to help provide resources to the Integrated Research Infrastructure (IRI) projects and the National Artificial Intelligence Research Resource (NAIRR) pilot program. The facility instantiated an Advanced Computing Ecosystem testbed in part to support IRI workflows. OLCF made interactivity easier and more accessible to users than ever through tools like Jupyter notebooks and workflows.

97 MATHEMATICS AND COMPUTING↗

US Department of Energy, Office of Science, High-Performance Computing Facility 2024 Operational Assessment Oak Ridge Leadership Computing Facility

The Oak Ridge Leadership Computing Facility (OLCF) was established to accelerate scientific discovery by providing world-leading computational performance and advanced data infrastructure to the US Department of Energy (DOE) computing community. As a DOE Office of Science user facility, the OLCF has managed the successful deployment and operation of a succession of leadership-class resources dedicated to open science. In addition to these resources, the OLCF staff continually strive to develop innovative processes and technologies, improve security, and empower users through effective allocation management and comprehensive user support and training. These efforts support the advancement of science by the OLCF users and benefit high-performance computing (HPC) facilities around the world.

97 MATHEMATICS AND COMPUTING↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reference Fuel Development for NonAluminum Spent Nuclear Fuel Management

Background – The L Area Facility was initially constructed as a nuclear reactor for nuclear material production in the 1950s – The reactor was shut down in the late 1980s: in the 1990s the mission changed to storing nuclear material • Current Mission – L Area provides for the safe receipt, storage, handling, and shipping of spent nuclear fuel (SNF) and other nuclear materials – Received more than 47,000 SNF assemblies since 1964 from power and research reactors (domestic and foreign)

Sifuentes, Christian A. [Savannah River Nuclear So↗

Grid-Interactive Efficient Buildings Support Federal Facility Decarbonization

The Federal Energy Management Program (FEMP) plays a key role in helping agencies understand and meet energy-related goals, including those surrounding smart buildings technologies and grid-interactive efficient buildings (GEBs), which can support decarbonization. GEB enables demand flexibility that has the potential to reduce electrical infrastructure costs and transform the grid edge, where buildings connect to the power grid.

decarbonization↗

FY2020 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit). Proposed activities, discoveries, new information and changes potentially affecting the 2010 SRS CA are documented in this and earlier Annual Summary reports, and a consolidated list of changes since the 2010 CA is documented in this report. The impact to the CA of changes arising from updated performance assessment (PA) baselines [i.e., Saltstone Disposal Facility (SDF), E-Area Low-Level Waste Facility (ELLWF), and F & H Tank Farm (FTF & HTF) closures] is expected to be minor for the following reasons: The primary contributors to the SRS CA dose impact at the Upper Three Runs (UTR) point of assessment (POA) are the H-Canyon and Mixed Waste Management Facility (MWMF), contributing 68% and 9%, respectively, to the dose impact at that POA. The combined contribution to the UTR dose impact from all PA’s (SDF, ELLWF, FTF and HTF) is ~2% of this total. The 2010 SRS CA model validation performed indicates that the CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. Doses evaluated are well below the SRS established 15 mrem/yr administrative limit (Crapse et al. 2011). Based on the assessment presented within this annual review and collective engineering judgement, the conclusions of the 2010 SRS CA remain valid and there is reasonable assurance that SRS will meet the performance objectives delineated in DOE Manual 435.1-1. The 2010 SRS CA should be updated to incorporate PA changes, proposed changes to inventories and sources and model improvements accumulated since the 2010 CA. The timing will be dependent on the completion of the ongoing E-Area PA revision.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PV Stormwater Management Research and Testing (PV-SMaRT) (Final Technical Report)

The objective of the Photovoltaic Stormwater Management Research and Testing (PV-SMaRT) project was to develop and disseminate research-based, solar-specific resources for estimating stormwater runoff at ground-mounted PV facilities and detail stormwater management and water quality best practices. The intended use of stormwater management and water quality best practices and stormwater runoff estimation resources is to reduce balance of system soft costs associated with stormwater infrastructure requirements and improve water quality through research-tested best practices. Currently, stormwater regulations and guidelines vary by jurisdiction and can lead to regulatory uncertainty and increased compliance costs for managing stormwater runoff at solar sites. To address these concerns, the NREL team and its partners (University of Minnesota, Great Plains Institute, and Fresh Energy) established and engaged an advisory Water Quality Task Force (WQTF); conducted field research on stormwater infiltration and runoff at five ground-mounted PV sites; validated a 3-D hydrologic model to predict water runoff and generate stormwater runoff coefficients for a range of site conditions and PV designs; developed a stormwater management and water quality best practices document; and engaged with local jurisdictions and other stakeholders to disseminate best practices, stormwater runoff coefficients, and other tools. Key outputs of this project were a PV-SMaRT Runoff Calculator developed by University of Minnesota, a webinar detailing project outcomes and how to use the PV-SMaRT runoff calculator, and a document on Best Practices for regulators and developers regarding stormwater runoff at PV sites.

14 SOLAR ENERGY↗

Scaling for Nuclear Reactor System: Overview

A scaling analysis is essential for predicting the behavior of a reactor system under various operating conditions, as well as for ensuring safe and reliable experimentation and adequate dataset generation for supporting the system code model development and assessment in accordance with USNRC guidelines 1.203. Testing and modeling can be carried out at various scales, from small test units to full-scale reactors, to validate the predictions produced by the analysis. However, due to the cost and challenges associated with full-scale testing, the nuclear industry uses scaled test facilities—integral effect test (IET) and separate effect test (SET)—to identify potential design issues and optimize the design to ensure regulatory compliance for safer operation and anticipated accident management. In general, IET facilities are non-nuclear thermal hydraulics test facilities. In contrast, SET facilities can be non-nuclear testing (e.g., steam generator, containment, pump system SETs) and nuclear testing (mostly fuel-material irradiation testing). IETs are used to study the system-level thermal-hydraulic behavior of the reactor coolant system (RCS) under different anticipated operational occurrences (AOOs) and design basis accidents (DBAs) such as loss-of-coolant-accident (LOCA) and loss-of-power (i.e., station blackout) and loss-of-flow (i.e., failure of RCS pump). Several LOCA scenarios could happen in reactor DBAs, such as main steam line break (MSLB), SG tube rapture (SGTR), break in direct vessel injection (DVI), and other small breaks LOCA. Scaling analysis determines the appropriate size and operating conditions for the test facility. This involves analyzing the system's thermal-hydraulic behavior at different scales and identifying the key parameters that affect the thermal-hydraulic behavior of the reactor. These key parameters can be identified so that the scaled facility can replicate the expected conditions in a prototypical setting. The scaled facility can simulate the same flow rates, pressure gradients, heat transfer coefficients, and fluid properties as the prototype. Scaling analysis is used to ensure that the results from these tests can be scaled up to predict the behavior of a full-scale prototype with an acceptable range of scaling distortions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hillsborough County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Hillsborough County used the Clear Sky Decision Support Toolkit to analyze solar + storage as an additional resiliency feature at its Brandon Support Operation Complex (BSOC). During normal operations, the BSOC houses water utility administration services and workspaces for water and wastewater engineers, facilities maintenance, and environmental management staff. During emergency management activation, the BSOC serves as an emergency hub for Emergency Support Function 3 (ESF-3), which includes public utilities, public works, and engineering staff support members. The BSOC is designated as a critical facility by the County.

14 SOLAR ENERGY↗

Valuation of pollination services from habitat management: a case study of utility scale solar energy facilities in the United States

Creating and maintaining pollinator habitats following the ecological infrastructure concept in degraded or unutilized land, such as solar energy facilities, is a practical way to synergistically advance the food, energy, and ecology nexus. Given the large land-use requirements for solar farming—the fastest growing renewable energy technology–considerable attention has been focused on strategies to maximize multiple ecosystem services. In this study, we coupled the principles of agronomy and ecology with economics and integrated national-scale data on crops, pollinators, and solar facilities to identify locations for creating pollinator habitats and estimating the economic value of pollination from the habitats. We examined opportunities for pollination services from pollinator-friendly utility-scale solar facilities adjacent to 42 million hectares of pollination-dependent crops in the conterminous United States at high resolution of 1 ha. We used the net income method to estimate the potential economic value of creating habitat in the land adjacent to solar facilities in the eight states with the greatest number of solar installations. Creating pollinator habitats at the 217 utility-scale solar facilities in these states could support adjacent 80,000 hectares of high pollinator dependent crops, which could potentially generate a pollination value of $\$$120 to $\$$264 million USD. The location-specific information and high-resolution maps generated for the United States demonstrate integration of grey and green infrastructure to support the food, energy, and environment nexus.

14 SOLAR ENERGY↗

E- Area Low-Level Waste Facility Multitiered Groundwater and Intruder Radionuclide Screening

Solid Waste Management (SWM) operates the E- Area Low-Level Waste Facility (ELLWF) where low level on-site and off-site solid waste streams are buried. The facility has been in operation since late 1994 and is currently projected to remain in operation until 2065. This facility can accommodate a broad range of waste forms resulting from the six different types of disposal unit (DU) options (i.e., varying degrees of engineered barriers → trenches to concrete vaults). This facility is currently operating under a Performance Assessment (PA)issued back in 2008, along with several subsequent supporting Special Analyses (SA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Federal Facility Agreement and Consent Order: Nevada National Security Site Use Restriction Management Plan with ROTC 1

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). (Note: This pertains to those FFACO sites not managed by the U.S. Department of Energy [DOE], Legacy Management.) The closure in place alternative is used for sites closed with residual contamination at levels requiring corrective action as determined using the FFACO process. The URs contain and control all requirements for long-term monitoring. This URMP also serves as the single repository of the URs implemented under the FFACO that identify use restricted areas and contain the current requirements for inspections, maintenance, and monitoring of the UR. The requirements in these URs replace all requirements listed in previous documentation. This consolidates post-closure monitoring requirements into a single source that ensures completeness and consistency of UR requirements and information. Standardized UR forms were developed to clearly document post-closure requirements that are consistent with current protocols and to ensure consistent information is contained in the URs. Standard notification, summary, and site controls statements were developed for all URs with provisions to insert site-specific options in the text. Current protocols for Industrial Sites and Soils URs are defined in this document and in the Soils Risk-Based Corrective Action (RBCA) Evaluation Process (DOE/EMNV, 2018). The standardized UR forms that have been approved to date are listed in Appendix A. Additional UR forms will be added once the review and approval process has been completed.

54 ENVIRONMENTAL SCIENCES↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗