Search NASA⌕ Search

SEARCH · Search NASA

Results for “feature engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Orbit transfer vehicle engine study, phase A extension. Volume 1: Executive summary

A 1980 state-of-the-art advanced expander engine was configured that delivers near-optimum payload-performance and exhibits the simplicity reliability, and life characteristics required of the OTV mission. Engine optimization studies indicate that the performance of the conventional expander cycle engine can be improved substantially through combustion chamber surface area enhancement, thermal enhancement, turbine regeneration, and power cycle efficiency enhancement procedures. The 20K lb. thrust staged combustion engine can be adapted to operate at extended periods in the 1 to 2K lb. thrust regime. The study results indicate that long-life, high performnce operation in the low thrust mode can be achieved with minimum modifications (kitting) of the engine. Although the main contribution to mission success and crew safety stems from propulsion system redundancy, significant reliability can be gained from engine component redundancy, specific engine design features ensuring safety and reliability, including an engine health monitoring system, and from a total program approach to safety and reliability, such as that presently applied to the space shuttle.

Source record↗

Simulation of a combined-cycle engine

A FORTRAN computer program was developed to simulate the performance of combined-cycle engines. These engines combine features of both gas turbines and reciprocating engines. The computer program can simulate both design point and off-design operation. Widely varying engine configurations can be evaluated for their power, performance, and efficiency as well as the influence of altitude and air speed. Although the program was developed to simulate aircraft engines, it can be used with equal success for stationary and automative applications.

Vangerpen, Jon↗

Adding a Visualization Feature to Web Search Engines: It’s Time

Since the first world wide web (WWW) search engine quietly entered our lives in 1994, the “information need” behind web searching has rapidly grown into a multi-billion dollar business that dominates the internet landscape, drives e-commerce traffic, propels global economy, and affects the lives of the whole human race. Today’s search engines are faster, smarter, and more powerful than those released just a few years ago. With the vast investment pouring into research and development by leading web technology providers and the intense emotion behind corporate slogans such as “win the web” or “take back the web,” I can’t help but ask why are we still using the very same “text-only” interface that was used 13 years ago to browse our search engine results pages (SERPs)? Why has the SERP interface technology lagged so far behind in the web evolution when the corresponding search technology has advanced so rapidly? In this article I explore some current SERP interface issues, suggest a simple but practical visual-based interface design approach, and argue why a visual approach can be a strong candidate for tomorrow’s SERP interface.

99 GENERAL AND MISCELLANEOUS↗

Application of Systems Engineering Principles and Techniques in Biological Big Data Analytics: A Review

In the past few decades, we have witnessed tremendous advancements in biology, life sciences and healthcare. These advancements are due in no small part to the big data made available by various high-throughput technologies, the ever-advancing computing power, and the algorithmic advancements in machine learning. Specifically, big data analytics such as statistical and machine learning has become an essential tool in these rapidly developing fields. As a result, the subject has drawn increased attention and many review papers have been published in just the past few years on the subject. Different from all existing reviews, this work focuses on the application of systems, engineering principles and techniques in addressing some of the common challenges in big data analytics for biological, biomedical and healthcare applications. Specifically, this review focuses on the following three key areas in biological big data analytics where systems engineering principles and techniques have been playing important roles: the principle of parsimony in addressing overfitting, the dynamic analysis of biological data, and the role of domain knowledge in biological data analytics.

dynamic analysis↗

The NASA Quiet Engines.

The present status of the Quiet Engine Program is reviewed, and the future prospects suggested by recent quiet engine test results are discussed. Following a brief survey of noise sources, quiet engine design features, and the major elements of the Quiet Engine Program, a review is presented of specific quiet engine test that includes the two baseline quiet engines tested and flyover noise comparison results. It is shown that the application to future aircraft of the developed and demonstrated engine noise reduction technology can bring about a substantial reduction in aircraft noise levels. The minimization of the economic penalty associated with this noise reduction technology is being studied.

Ciepluch, C. C.↗

Scaling Evaluation of Ice-Crystal Icing on a Modern Turbofan Engine in PSL Using the COMDES-MELT Code

This paper presents preliminary ice-crystal icing (ICI) altitude scaling evaluation results of a Honeywell Uncertified Research Engine (HURE) that was tested in the NASA Glenn Research Center Propulsion Systems Laboratory (PSL) during January of 2018. This engine geometry features a hidden core design to keep the core less exposed. The engine was fitted with internal video cameras to observe various ice buildup processes at multiple selected locations within the engine core flow path covering the fan stator, the splitter-lip/shroud/strut, and the high pressure compressor (HPC) variable inlet guide vane (IGV) regions. The potential ice accretion risk was pre-determined to occur by using NASA’s in-house 1D Engine Icing Risk assessment code, COMDES-MELT. The code was successful in predicting the risk of ice accretion in adiabatic regions like the fan-stator of the HURE at specific engine operating points. However at several operating points during the test, liquid water was observed running along the shroud toward the variable IGV of the HPC regions with an air temperature well below freezing, thus no particle melting could have occurred due to heating from the air alone. It was reasoned that other sources of heat were present in that region. To account for these heat sources the inlet total temperature was adjusted to give a wet bulb temperature of 24 F below the standard minimum wet bulb temperature of 492 R to allow ice to accrete in the splitter-lip/shroud/strut region, which was determined from a reference case where hard ice was observed in that region. With that adjustment the COMDES-MELT code was successful in providing operating points where there was a risk of ice accretion during the test campaign. In addition to calculating possible conditions at different selected lower altitudes, simulations were run to determine potential inlet conditions that could lead to ice-crystal accretion along the prescribed stations where the cameras were available. From there, scaled test conditions were determined by best matching the following three icing related parameters of the reference condition: (1) the local air total wet bulb temperature, (2) the local ice crystal cloud melt ratio and (3) the engine fan face ice/water to air mass flux ratio of the ice crystal cloud. Instantaneous images taken from the time-lapsed movies of ice buildup were used along with the relevant thermodynamic data of air, water vapor and local icing condition to help evaluate how closely the proposed altitude scaling method could be used in ground based test facility to duplicate selected reference ICI features observed at specific location inside this engine at different scale altitudes. Discussions on observed limitation for engine icing scaling application from this test campaign and needed improvement are provided. A scaling test procedure to help identify potential ICI risk conditions and possible ice accretion locations of a new turbofan engine is evaluated in PSL.

Engine Testing in PSL↗

Variable stream control engine concept for advanced supersonic aircraft: Features and benefits

The Variable Stream Control Engine is studied for advanced supersonic cruise aircraft. Significant environmental and performance improvements relative to first generation supersonic turbojet engines are cited. Two separate flow streams, each with independent burner and nozzle systems are incorporated within the engine. By unique control of the exhaust temperatures and velocities in two coannular streams, significant reduction in jet noise is obtained.

Howlett, R. A.↗

Criticality Safety Controls and the Safety Basis at PFP

With the implementation of DOE Order 420.1B, Facility Safety, and DOE-STD-3007-2007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities', a new requirement was imposed that all criticality safety controls be evaluated for inclusion in the facility Documented Safety Analysis (DSA) and that the evaluation process be documented in the site Criticality Safety Program Description Document (CSPDD). At the Hanford site in Washington State the CSPDD, HNF-31695, 'General Description of the FH Criticality Safety Program', requires each facility develop a linking document called a Criticality Control Review (CCR) to document performance of these evaluations. Chapter 5, Appendix 5B of HNF-7098, Criticality Safety Program, provided an example of a format for a CCR that could be used in lieu of each facility developing its own CCR. Since the Plutonium Finishing Plant (PFP) is presently undergoing Deactivation and Decommissioning (D&D), new procedures are being developed for cleanout of equipment and systems that have not been operated in years. Existing Criticality Safety Evaluations (CSE) are revised, or new ones written, to develop the controls required to support D&D activities. Other Hanford facilities, including PFP, had difficulty using the basic CCR out of HNF-7098 when first implemented. Interpretation of the new guidelines indicated that many of the controls needed to be elevated to TSR level controls. Criterion 2 of the standard, requiring that the consequence of a criticality be examined for establishing the classification of a control, was not addressed. Upon in-depth review by PFP Criticality Safety staff, it was not clear that the programmatic interpretation of criterion 8C could be applied at PFP. Therefore, the PFP Criticality Safety staff decided to write their own CCR. The PFP CCR provides additional guidance for the evaluation team to use by clarifying the evaluation criteria in DOE-STD-3007-2007. In reviewing documents used in classifying controls for Nuclear Safety, it was noted that DOE-HDBK-1188, 'Glossary of Environment, Health, and Safety Terms', defines an Administrative Control (AC) in terms that are different than typically used in Criticality Safety. As part of this CCR, a new term, Criticality Administrative Control (CAC) was defined to clarify the difference between an AC used for criticality safety and an AC used for nuclear safety. In Nuclear Safety terms, an AC is a provision relating to organization and management, procedures, recordkeeping, assessment, and reporting necessary to ensure safe operation of a facility. A CAC was defined as an administrative control derived in a criticality safety analysis that is implemented to ensure double contingency. According to criterion 2 of Section IV, 'Linkage to the Documented Safety Analysis', of DOESTD-3007-2007, the consequence of a criticality should be examined for the purposes of classifying the significance of a control or component. HNF-PRO-700, 'Safety Basis Development', provides control selection criteria based on consequence and risk that may be used in the development of a Criticality Safety Evaluation (CSE) to establish the classification of a component as a design feature, as safety class or safety significant, i.e., an Engineered Safety Feature (ESF), or as equipment important to safety; or merely provides defense-in-depth. Similar logic is applied to the CACs. Criterion 8C of DOE-STD-3007-2007, as written, added to the confusion of using the basic CCR from HNF-7098. The PFP CCR attempts to clarify this criterion by revising it to say 'Programmatic commitments or general references to control philosophy (e.g., mass control or spacing control or concentration control as an overall control strategy for the process without specific quantification of individual limits) is included in the PFP DSA'. Table 1 shows the PFP methodology for evaluating CACs. This evaluation process has been in use since February of 2008 and has proven to be simple and effective. Each control identified in the applicable new/revised CSE is evaluated via the table. The results of this evaluation are documented in tables attached to the CCR as an appendix, for each CSE, to the base document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Achieving Unprecedented CO 2 Utilization InCO 2 Concrete™: System Design, Product Development and Process Demonstration

Anthropogenic sources of carbon dioxide are generated from a number of sources, but the key among these are ordinary Portland cement (OPC) production and combustion of fossil fuels. Cement production is the largest global CO 2 source from the mineral decomposition of carbonates. This is due to the clinkering process whereby limestone (mainly consisting of CaCO 3 ) is decomposed into CaO and CO 2 , and combined with silica rich clays at high temperatures to form clinkers (i.e. the four key minerals that comprise cement). The high temperature range of 1400 – 1550°C required for this process accounts for up to 60% of the generated CO 2 from cement production. Combination of the limestone decomposition and thermal requirements of the clinkering process causes cement production to contribute 8-9% of annual global CO 2 emissions. Combustion of fossil fuels (coal, oil and gas) was shown to contribute a much larger portion of global CO 2 emissions. As of 2018, combustion of fossil fuels accounted for 65% of global CO 2 , where 41% was derived from stationary sources for electricity and heat generation and the other 24% was related to transport. To reduce these contributions, key steps forward in CO 2 utilization technologies are required. Therefore, a CO 2 mineralization technology (CO 2 mineralization concrete) to reduce the OPC content in concrete, while utilizing flue gas emissions from fossil fuel combustion has been developed to address both areas simultaneously. This Reversa™ technology utilizes low-carbon cementation agents produced by in situ CO 2 mineralization (“mineral carbonation reactions”) to offer a promising alternative to OPC. CO 2 mineralization relies upon the reaction of dissolved CO 2 with inorganic alkaline reactants to precipitate mineral carbonates (e.g., CaCO 3 ), which bind proximate particles and achieve cementation. Herein, a concrete green body, which is composed of a mixture of binder, water, and mineral aggregates, is exposed to CO 2 borne in industrial flue gas streams. This manner of CO 2 mineralization allows the production of construction components that feature equivalent engineering attributes as their OPC-based counterparts while featuring a much smaller embodied carbon intensity (eCI). The purpose of this project is to demonstrate the feasibility of the Reversa process evolving from a TRL-3 technology at the bench-scale up to TRL-6 technology at the pilot-scale. The reliability of the Reversa technology was tested to prove the effective production of three standard industrial concrete products selected during the course of the project. The results detailed herein will demonstrate the evolution of this technology to the industrial scale. The culmination of this work resulted in 9 production runs completed at the National Carbon Capture Center (NCCC), Wilsonville, AL, using natural gas (NG) flue gas as the CO 2 source. Over the course of the production runs at NCCC, the CO 2 utilization as a function of time, 24-h CO 2 uptake, electricity usage, and 28-d net area compressive strength recorded for each run. Collection of this data will be used to determine the success of the demonstration goals: (1) achieving in excess of 0.2gCO 2 /g reactant , (2) achieving greater than 50% reduction in global warming potential compared to standard produced units, and (3) ensuring compliance of carbonated concrete with industry standard specifications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

ADDITIVELY MANUFACTURED SURFACE HEAT TRANSFER ENHANCEMENTS FOR THE TRANSFORMATIONAL CHALLENGE REACTOR

The Transformational Challenge Reactor (TCR) is a high-temperature gas-cooled reactor design that uses additively manufactured fuel elements. TCR fuel elements have walls made of silicon carbide and are filled with tristructural-isotropic fuel particles. These fuel elements can have radically different shapes and integrated features than existing designs due to the reduced cost for complex structures in binder jet additive manufacturing. As such, binder jet additive manufacturing enables wall surface features to be embedded that can deliver superior heat transfer performance than smooth wall designs. In this work, the authors conducted a computational fluid dynamics study to evaluate selected wall features integrated into TCR fuel elements. Results show that surface features can outperform smooth wall designs; however, there are unique challenges for gas-cooled reactor core designs that have not been fully explored by previous research. For example, the rough surface finish and process variability of ceramics additive manufacturing make it challenging to predict surface roughness effects before fabrication. Additionally, the small hydraulic diameters of coolant channels in reactor cores make it difficult to engineer surface features that do not significantly increase the pressure drop. Engineers must carefully size surface features for heat transfer enhancement in additive fuel elements to operate above the base material's surface roughness effects and below the coolant channel size.

Weinmeister, Justin↗

Nuclear Engine System Simulation (NESS) version 2.0

The topics are presented in viewgraph form and include the following; nuclear thermal propulsion (NTP) engine system analysis program development; nuclear thermal propulsion engine analysis capability requirements; team resources used to support NESS development; expanded liquid engine simulations (ELES) computer model; ELES verification examples; NESS program development evolution; past NTP ELES analysis code modifications and verifications; general NTP engine system features modeled by NESS; representative NTP expander, gas generator, and bleed engine system cycles modeled by NESS; NESS program overview; NESS program flow logic; enabler (NERVA type) nuclear thermal rocket engine; prismatic fuel elements and supports; reactor fuel and support element parameters; reactor parameters as a function of thrust level; internal shield sizing; and reactor thermal model.

Pelaccio, Dennis G.↗

Performance Assessment Results for the Hanford Integrated Disposal Facility - 19134

In 2014, the US DOE Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Integrated Disposal Facility. The Hanford Integrated Disposal Facility is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste containers that will be produced at the Hanford Waste Treatment and Immobilization Plant. The disposal facility is also expected to receive solid secondary waste produced at the Hanford Waste Treatment and Immobilization Plant and other solid wastes from site activities. The constructed facility is awaiting authorization to receive waste. Although no waste destined for the facility is currently being generated, operations cannot begin until the facility has received a Disposal Authorization Statement from US DOE and a permit modification from the State of Washington Department of Ecology. Both the Disposal Authorization Statement and permit modification require a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for the next 1,000 to 10,000 years. Based on the analyses presented in the Integrated Disposal Facility Performance Assessment, US DOE issued a conditional Disposal Authorization Statement for the facility in June 2018. Demonstrating the long-term performance of the facility to be protective of human health and the environment was evaluated under the requirements of US DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the disposal facility would comply with the performance objectives specified in the order. The evaluation was performed using numerical models to simulate source term releases from vitrified and cement-based waste forms. Source term releases were subsequently transported through an air pathway and a groundwater pathway to a point of compliance 100 meters from the disposed of waste. In addition, an analysis evaluating the consequences of an inadvertent intrusion into the waste was also performed. In accordance with US DoE's technical standard for performance assessments, deterministic and probabilistic analyses were performed to demonstrate that the Hanford Integrated Disposal Facility, together with the engineered features of the waste forms and natural features of the selected site, provides a reasonable expectation that the low-level waste and mixed low-level waste disposal will meet the radiological performance objectives established by US DOE. Post-closure doses to future members of the public were evaluated after the time of closure and included a 100-year period of institutional controls that limited exposure immediately following closure of the facility. Calculated doses to a future member of the public from the air pathway were below the 100 μSv/yr dose performance objective. Calculated doses to a future member of the public from all exposure pathways, including the air pathway and the groundwater pathway, were below the 250 μSv/yr dose performance objective. Doses following an inadvertent intrusion into the facility after the institutional control period were below the 5 mSv acute dose performance measure and the 1 mSv/yr chronic dose performance measure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

QCSEE task 2: Engine and installation preliminary design

High-bypass turbofan engines with features required for commercial short haul powered lift transports were designed. Two engines were configured for each of the externally blown flap installations, under-the-wing and over-the-wing. Estimates of installed and uninstalled performance, noise, and weight were defined for each propulsion system.

Neitzel, R. E.↗