Search NASA⌕ Search

SEARCH · Search NASA

Results for “federal office”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

NASA Earth Observations Track the Gulf Oil Spill

The NASA Applied Sciences Program created the Gulf of Mexico Initiative (GOMI) in 2007 "to enhance the region s ability to recover from the devastating hurricanes of 2005 and to address its coastal management issues going into the future." The GOMI utilizes NASA Earth science assets to address regional priorities defined by the Gulf of Mexico Alliance, a partnership formed by the states of Alabama, Florida, Louisiana, Mississippi, and Texas, along with 13 federal agencies and 4 regional organizations to promote regional collaboration and enhance the ecological and economic health of the Gulf of Mexico. NASA's GOMI is managed by the Applied Science and Technology Project Office at Stennis Space Center and has awarded over $18 million in Gulf of Mexico research since 2008. After the Deepwater Horizon oil spill, GOMI personnel assisted members of the Gulf of Mexico Alliance with obtaining NASA remote sensing data for use in their oil spill response efforts.

Jones, Jason B.↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Marshall Application Realignment System (MARS) Architecture

The Marshall Application Realignment System (MARS) Architecture project was established to meet the certification requirements of the Department of Defense Architecture Framework (DoDAF) V2.0 Federal Enterprise Architecture Certification (FEAC) Institute program and to provide added value to the Marshall Space Flight Center (MSFC) Application Portfolio Management process. The MARS Architecture aims to: (1) address the NASA MSFC Chief Information Officer (CIO) strategic initiative to improve Application Portfolio Management (APM) by optimizing investments and improving portfolio performance, and (2) develop a decision-aiding capability by which applications registered within the MSFC application portfolio can be analyzed and considered for retirement or decommission. The MARS Architecture describes a to-be target capability that supports application portfolio analysis against scoring measures (based on value) and overall portfolio performance objectives (based on enterprise needs and policies). This scoring and decision-aiding capability supports the process by which MSFC application investments are realigned or retired from the application portfolio. The MARS Architecture is a multi-phase effort to: (1) conduct strategic architecture planning and knowledge development based on the DoDAF V2.0 six-step methodology, (2) describe one architecture through multiple viewpoints, (3) conduct portfolio analyses based on a defined operational concept, and (4) enable a new capability to support the MSFC enterprise IT management mission, vision, and goals. This report documents Phase 1 (Strategy and Design), which includes discovery, planning, and development of initial architecture viewpoints. Phase 2 will move forward the process of building the architecture, widening the scope to include application realignment (in addition to application retirement), and validating the underlying architecture logic before moving into Phase 3. The MARS Architecture key stakeholders are most interested in Phase 3 because this is where the data analysis, scoring, and recommendation capability is realized. Stakeholders want to see the benefits derived from reducing the steady-state application base and identify opportunities for portfolio performance improvement and application realignment.

Belshe, Andrea↗

Nevada National Security Site Radiological Control Manual

Please have this STIP assigned, documented, and recorded in OSTI as Report Number DOE/NV/03624--0257 Revision 1 and Author as Radiological Control Managers' Council. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) is for Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” which is located in Area 5 of the Nevada National Security Site (NNSS). CAU 577 includes five low-level waste cells at the Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. To resolve issues related to this alleged violation of hazardous waste regulations, a Settlement Agreement was executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019, which identified agreed-upon mitigation measures. The Settlement Agreement required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO).

54 ENVIRONMENTAL SCIENCES↗

National Hydropower Fish Passage Database User's Guide and Methodology

Fish passage facilities are used to mitigate the impacts of hydropower dams on migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. This database contains information of great value to a broad range of stakeholders; it includes fish passage facility engineering characteristics, targeted fish species, operational schedules, and costs. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations, industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the U.S. Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

13 HYDRO ENERGY↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Gas Turbine Powertrain System Development Project

A progress report on the Advanced Gas Turbine Powertrain System Development Project being performed under contract from NASA Lewis is presented. The goals and objectives of the project are described noting that funds from the DOE, Office of Transportation Programs are used to sponsor the project. Among the demonstration objectives are attaining a fuel economy of 42.5 miles per gallon in a 1985 Pontiac Phoenix, multifuel capability, and emission levels within the federal standards. Design objectives examined include competitive reliability and life as well as competitive initial and life cycle costs. Finally, it is stressed that high risk and key elements in this advanced powertrain project are the development of ceramic turbine engine components and the aerodynamic development of small size turbine components.

Helms, H. E.↗

Technical Basis Related to the Posture of NASA’s Office of Safety and Mission Assurance for the Launch of Radioactive Material Other than Space Nuclear Systems: Volume 1–Overview of Analysis and Results

NASA has launched and reentered payloads containing radioactive material for over 50 years. The isotopes, their quantity, and their form have varied significantly. The handling of this material prior to its integration into the spacecraft at the launch Center (and after its return to Earth after flight, if applicable) falls under the purview of the Office of the Chief Health and Medical Officer, while after the radioactive material is integrated into the spacecraft at the launch Center, it falls under the purview of the Office of Safety and Mission Assurance’s (OSMA) Nuclear Flight Safety Program. Historically, OSMA concurrence was required for any launch or reentry involving radioactive material. However, OSMA recently revisited this posture due to changes in the Federal policy in this area, and the significant accrued experience. The current report represents the more quantitative study envisioned in the recent change in posture. More specifically, this document addresses the potential risks and other considerations associated with launching small quantities of radioactive material (below the level requiring the Federally-mandated process in National Security Presidential Memorandum- (NSPM-) 20, “Presidential Memorandum on Launch of Spacecraft Containing Space Nuclear Systems” (USG, 2019) to provide the technical basis for when such activities require OSMA concurrence versus notification, as it relates to nuclear flight safety.

Don Helton↗

Multi-State Transportation Electrification Impact Study: Preparing the Grid for Light-, Medium-, and Heavy-Duty Electric Vehicles

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ORNL National Hydropower Fish Passage Database

Fish passage facilities are used to mitigate impacts of hydropower dams to migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory (ORNL) partnered with fish passage engineers and hydropower experts from the US Fish and Wildlife Service (USFWS), the National Oceanic Atmospheric Administration’s National Marine Fisheries Service (NOAA NMFS), and the Low Impact Hydropower Institute (LIHI) to create the first national scale database of fish passage infrastructure at US hydropower developments. This database consists of the ORNL_Fish_Passage_Dataset.zip file with 13 individual .csv files that contain information on fish passage facility engineering characteristics, targeted fish species, operational schedule, and costs. which is of great value to a diverse range of stakeholders. This information was collected between December 2023 and July 2025 from project partners, other hydropower stakeholders, online datasets available for download, and a stakeholder questionnaire Information. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations (NGOs), industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the US Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

Matson, Paul [Oak Ridge National Laboratory (ORNL)↗

Space science in the 1990's and beyond

NASA's Office of Space Sciences is changing its approach to our missions, both current and future. Budget realities are necessitating that we change the way we do business and the way we look at our role in the Federal Government. These challenges are being met by a new and innovative approach that focuses on achieving a balanced world-class space science program that requires far less resources while providing an enhanced role for technology and education as integral components of our Research and Development (R&D) programs.

Huntress, Wesley T., Jr.↗

Transportation Electrification Impact Study (TEIS)

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

An Overview of the Risk Assessment Information System

This technical memorandum (TM) presents an overview of the Risk Assessment Information System (RAIS), a collection of web-based tools designed to assist with the environmental risk assessment process. The objective of the RAIS is to be a single resource for the risk assessment process, providing guidance when planning and performing the steps: data assessment, exposure assessment, toxicity assessment, and risk characterization. The RAIS evolved as a result of the initial remediation efforts at various United States (U.S.) Department of Energy (DOE) facilities. The goal was to increase the efficiency and transparency of the human health and ecological assessments being performed by DOE’s Office of Environmental Management, Oak Ridge Operations (ORO) office by providing a repository for toxicity information, physicochemical data, risk assessment procedures, standardized risk calculation methods, and web-based tools. Since the initial launch in 1996, the RAIS has expanded its user base outside of the federal government and now has users from over 100 countries, universities, states, and local governments. What sets the RAIS apart from other risk assessment sites are the publicly available, searchable toxicity and physicochemical databases and the wide range of chemical and radionuclide risk calculation tools. The purpose of this TM is to present the RAIS tools in order of the website menus and explain how they fit in the risk assessment process. In addition, this TM describes differences between the chemical and radionuclide tools of the RAIS. Screening level equations, chronic daily intake equations, and default exposure factors used in the chemical and radionuclide calculators are included in the appendices of this TM. This TM is not intended to be a detailed guide to risk assessment or the RAIS tools. The tools on the RAIS can be used to comply with procedures from multiple agencies, including but not limited to DOE, U.S. Environmental Protection Agency (EPA), U.S. Department of Defense (DoD), and many state governments. Further information on the RAIS tools can be found in the user guides and tutorials available on the webpage.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

A Cultural Resource Survey of 110.55 Acres at the Coyote Test Field, Sandia National Laboratories, Kirtland Air Force Base, Bernalillo County, Albuquerque, New Mexico

This report presents the results of a Section 110 cultural resource survey of Sandia National Laboratories’ (Sandia) 9930 and 9939 Complexes, in the Coyote Test Field (CTF), located on lands permitted to the Department of Energy (DOE) by the Department of Defense (DOD), Kirtland Air Force Base (KAFB), Bernalillo County, Albuquerque, New Mexico. The Department of Energy, National Nuclear Security Administration Sandia Field Office (DOE/NNSA SFO) and National Technology and Engineering Solutions of Sandia, LLC, in accordance with Section 110 and Section 106 of the National Historic Preservation Act (NHPA) and its implementing regulations 36 C.F.R. Part 800, states that every federal agency must establish their own historic preservation program for the identification, evaluation, and protection of historic properties and to ensure that historic preservation is fully integrated into the ongoing programs of federal agencies. Sandia’s Cultural Resources Program (CRP) establishes areas of potential effects based upon projected Sandia mission needs. Some of these areas have no immediate undertakings planned but are in areas where undertakings can happen at a future date.

54 ENVIRONMENTAL SCIENCES↗

A Study to Estimate the Effectiveness of Visual Testing Training for Aviation Maintenance Management

The Air Commerce Act of 1926 set the beginning for standards in aviation maintenance. Even after deregulation in the late l970s, maintenance standards and requirements still have not changed far from their initial criteria. After a potential candidate completes Federal Aviation Administration training prerequisites, they may test for their Airframe and Powerplant (A&P) certificate. Performing maintenance in the aviation industry for a minimum of three years, the technician may then test for their Inspection Authorization (IA). After receiving their Airframe and Powerplant certificate, a technician is said to have a license to perform. At no time within the three years to eligibility for Inspection Authorization are they required to attend higher-level inspection training. What a technician learns in the aviation maintenance industry is handed down from a seasoned technician to the new hire or is developed from lessons learned on the job. Only in Europe has the Joint Aviation Authorities (JAA) required higher-level training for their aviation maintenance technicians in order to control maintenance related accidents (Lu, 2005). Throughout the 1990s both the General Accounting Office (GAO) and the National Transportation Safety Board (NTSB) made public that the FAA is historically understaffed (GAO, 1996). In a safety recommendation the NTSB stated "The Safety Board continues to lack confidence in the FAA's commitment to provide effective quality assurance and safety oversight of the ATC system (NTSB, 1990)." The Federal Aviation Administration (FAA) has been known to be proactive in creating safer skies. With such reports you would suspect the FAA to also be proactive in developing more stringent inspection training for aviation maintenance technicians. The purpose of this study is to estimate the effectiveness of higher-level inspection training, such as Visual Testing (VT) for aviation maintenance technicians, to improve the safety of aircraft and to make recommendations to management with regard to the value of such training.

Law, Lewis Lyle↗

Panel Session 12: Effective Aspects of the 2016 Consent Order between DOE-EM-LA Field Office - NM Environment Department and Identifying Comparable Approaches

This panel focused on the extremely effective 2016 Compliance Order on Consent executed between the US Department of Energy (DOE) Office of Environmental Management - Los Alamos Field Office (EM-LA) and the New Mexico Environment Department (NMED) and highlights practices and concepts toward developing an environmental compliance agreement that is mutually productive to both the NMED and the DOE. To further demonstrate successful practices, the panel also highlighted another very effective compliance agreement with comparable approaches - the 1993 Savannah River Site (SRS) Federal Facility Agreement (FFA) executed between DOE, the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency (EPA). EM-LA, NMED, SRS, and SCDHEC representatives provided attendees an opportunity to understand and compare extremely effective approaches to regulatory compliance across the complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PNNL Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2020

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2020 was 3.5E-05 mrem (3.5E-07 mSv). No non-routine emissions occurred in 2020. The Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗