Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight delay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

The Low Temperature Microgravity Physics Facility: Progress and Status

The Jet Propulsion Laboratory (JPL) is developing the Low Temperature Microgravity Physics Facility (LTMPF). The LTMPF is a multiple user and multiple flight facility that will provide a long duration low temperature environment for performing state of the art experiments at the International Space Station (ISS). During each mission, two distinct primary experiments will be accommodated. Secondary experiments utilizing the hardware built for the primary experiments will also be accommodated during each mission. Over the past year, much progress has occurred on the LTMPF as the flight hardware has started to be built. Also, many changes have occurred. Last summer, the initial flight of the LTMPF was delayed until early 2008 by a 2-year slip in the delivery of the Japanese Experiment Module (KIBO) Exposed Facility of the ISS, where the LTMPF will be attached when it flies. Finally, the experiments that will fly as part of the first mission have been changed so that one Gravitational and Relativistic experiment and one Low Temperature Condensed Matter experiment will fly on each flight of the LTMPF. Therefore, the experiments that will fly on the initial mission of the LTMPF will be DYNAMX and the Superconducting Microwave Oscillator Experiment (SUMO).

Larson, Melora↗

Probabilistic Analysis of Ground-Holding Strategies

The Ground-Holding Policy Problem (GHPP) has become a matter of great interest in recent years because of the high cost incurred by aircraft suffering from delays. Ground-holding keeps a flight on the ground at the departure airport if it is known it will be unable to land at the arrival airport. The GBPP is determining how many flights should be held on the ground before take-off and for how long, in order to minimize the cost of delays. When the uncertainty associated with airport landing capacity is considered, the GHPP becomes complicated. A decision support system that incorporates this uncertainty, solves the GHPP quickly, and gives good results would be of great help to air traffic management. The purpose of this thesis is to modify and analyze a probabilistic ground-holding algorithm by applying it to two common cases of capacity reduction. A graphical user interface was developed and sensitivity analysis was done on the algorithm, in order to see how it may be implemented in practice. The sensitivity analysis showed the algorithm was very sensitive to the number of probabilistic capacity scenarios used and to the cost ratio of air delay to ground delay. The algorithm was not particularly sensitive to the number of periods that the time horizon was divided into. In terms of cost savings, a ground-holding policy was the most beneficial when demand greatly exceeded airport capacity. When compared to other air traffic flow strategies, the ground-holding algorithm performed the best and was the most consistent under various situations. The algorithm can solve large problems quickly and efficiently on a personal computer.

Sheel, Minakshi↗

Demand-Capacity Balancing Algorithms for Urban Air Mobility Operations

This paper proposes new Demand/Capacity Balancing (DCB) algorithms that resolve imbalances at enroute waypoints, such as crossing, merging, and UAM corridor entry or exit waypoints, in addition to vertiports; we refer to this algorithm as DCB-Waypoint, still using pre-departure delay as the sole resolution mechanism. Like DCB-Vertiport, DCB-Waypoint takes one flight at a time and resolves imbalances one waypoint at a time, starting from the origin vertiport followed by the sequence of constrained waypoints and, finally, the destination vertiport. The next advancement assigns airborne delays, in addition to pre-departure delays at vertiports. This algorithm, called DCB-Airborne-Delays, uses information on flight speeds to ensure that the assigned delays are feasible, meaning that variations in flight speeds are within feasible aircraft speed ranges. The proposed algorithms are being implemented in a new fast-time simulation tool developed especially for simulating UAM operations. The full paper will provide additional details of the new DCB algorithms that have been developed, as well as the results from simulations using these algorithms. Finally, the DCB algorithms will be compared against one another to obtain insights and recommendations for the future development of more advanced DCB algorithms.

urban air mobility, demand-capacity balancing↗

Demand-Capacity Balancing Algorithms for Urban Air Mobility Operations

This paper proposes new Demand/Capacity Balancing (DCB) algorithms that resolve imbalances at enroute waypoints, such as crossing, merging, and UAM corridor entry or exit waypoints, in addition to vertiports; we refer to this algorithm as DCB-Waypoint, still using pre-departure delay as the sole resolution mechanism. Like DCB-Vertiport, DCB-Waypoint takes one flight at a time and resolves imbalances one waypoint at a time, starting from the origin vertiport followed by the sequence of constrained waypoints and, finally, the destination vertiport. The next advancement assigns airborne delays, in addition to pre-departure delays at vertiports. This algorithm, called DCB-Airborne-Delays, uses information on flight speeds to ensure that the assigned delays are feasible, meaning that variations in flight speeds are within feasible aircraft speed ranges. The proposed algorithms are being implemented in a new fast-time simulation tool developed especially for simulating UAM operations. The full paper will provide additional details of the new DCB algorithms that have been developed, as well as the results from simulations using these algorithms. Finally, the DCB algorithms will be compared against one another to obtain insights and recommendations for the future development of more advanced DCB algorithms.

urban air mobility↗

The 11 July 1988 Denver windshear encounters

On July 11, 1988, between 2207 and 2213 UTC (16:07 to 16:13 MDT), four successive United flights had inadvertent encounters with microburst windshear conditions while on final approach to Denver Stapleton Airport (DEN), each resulting in a missed approach, subsequent delay, and uneventful arrival. A fifth flight executed a missed approach without encountering the phenomena. There was no damage to aircraft and no passenger injuries were incurred. The term inadvertent is used within United Airlines' windshear training materials and the Federal Aviation Administration (FAA) Windshear Training Aid to connote an encounter with windshear after vigilance and cautionary practices fail to identify and afford complete avoidance of the hazardous area. No crew culpability is implied. A comprehensive investigation for scientific purposes in the study of windshear phenomenon is being conducted separately under the guidance of the FAA with involvement and cooperation from United, the National Transportation Safety Board (NTSB), National Center for Atmospheric Research (NCAR), Boeing, Douglas, NASA, and others.

Ireland, Robert L.↗

Comparison of Different Control Schemes for Strategic Departure Metering

Airports and their terminal airspaces are key choke points in the air transportation system causing major delays and adding to pollution. A solution aimed at mitigating these chokepoints integrates the scheduling of runway operations, flight release from the gates and ramp into the airport movement area, and merging with other traffic competing for downstream airspace points. Within this integrated concept, we present a simulation-based analysis of the departure metering process, which delays the release of flights into the airport movement area while balancing two competing objectives: (1) maintaining large enough queues at the airport resources to maximize throughput and (2) absorbing excess delays at the gates or in ramp areas to save on fuel consumption, emissions, noise, and passenger discomfort. Three metering strategies are compared which respectively attempt to control the number of flights that (1) left the gate but did not take off, (2) left the ramp but did not take off, and (3) spent their unimpeded transit time to the runway but did not take off. It was observed that under deterministic and demand uncertainty conditions, the first strategy performed better than the other two strategies in terms of maintaining the runway throughput while transferring a significant average delay of two minutes to the gate. On the other hand, under uncertainties of flight transit time and runway service rate, all the strategies struggled to delay flights at the gate without a significant impact on the runway throughput.

air traffic management↗

Intravascular bubbles associated with intravenous injections and altitude

Ultrasonically detected microbubbles were more abundant in the pulmonary artery of dogs intravenously injected with 10 ml of saline than in the same noninjected control during 10,000 ft (3,048 m), 20,000 ft (6,096 m), and 40,000 ft (12,121 m) exposures. Continuous intravenous (i.v.) drip infusions also introduced many small bubbles. Since they may serve as 'nuclei' for visible intravascular bubble formation, are sometimes associated with decompression sickness, and are additionally considered undesirable, it would appear prudent to minimize i.v. injections immediately before flights. However, a 10-min delay before ascent wil reduce their number and a 60-min delay will insure their almost complete absence. Also, slow ascent, a 1-h denitrogenation time, or use of a degassed solution will help reduce their total number.

Cooke, J. P.↗

Design considerations of manipulator and feel system characteristics in roll tracking

A fixed-base simulation was performed to identify and quantify interactions between the pilot's hand/arm neuromuscular subsystem and such control system features of typical modern fighter aircraft roll rate command mechanizations as: (1) force versus displacement sensing side-stick type manipulator, (2) feel force/displacement gradient, (3) feel system versus command prefilter dynamic lag, and (4) flight control system effective time delay. The experiment encompassed some 48 manipulator/filter/aircraft configurations. Displacement side-stick experiment results are given and compared with the previous force sidestick experiment results. Attention is focused on control bandwidth, excitement (peaking) of the neuromuscular mode, feel force/displacement gradient effects, time delay effects, etc. Section 5 is devoted to experiments with a center-stick in which force versus displacement sensing, feel system lag, and command prefilter lag influences on tracking performance and pilot preference are investigated.

Johnston, Donald E.↗

Air traffic management as principled negotiation between intelligent agents

The major challenge facing the world's aircraft/airspace system (AAS) today is the need to provide increased capacity, while reducing delays, increasing the efficiency of flight operations, and improving safety. Technologies are emerging that should improve the performance of the system, but which could also introduce uncertainty, disputes, and inefficiency if not properly implemented. The aim of our research is to apply techniques from intelligent control theory and decision-making theory to define an Intelligent Aircraft/Airspace System (IAAS) for the year 2025. The IAAS would make effective use of the technical capabilities of all parts of the system to meet the demand for increased capacity with improved performance.

Wangermann, J. P.↗

The Importance of Engine External's Health

Engine external components include all the fluid carrying, electron carrying, and support devices that are needed to operate the propulsion system. These components are varied and include: pumps, valves, actuators, solenoids, sensors, switches, heat exchangers, electrical generators, electrical harnesses, tubes, ducts, clamps and brackets. The failure of any component to perform its intended function will result in a maintenance action, a dispatch delay, or an engine in flight shutdown. The life of each component, in addition to its basic functional design, is closely tied to its thermal and dynamic environment .Therefore, to reach a mature design life, the component's thermal and dynamic environment must be understood and controlled, which can only be accomplished by attention to design analysis and testing. The purpose of this paper is to review analysis and test techniques toward achieving good component health.

Stoner, Barry L.↗

NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

Baxley, Brian T.↗

Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps), Version 2.0

This document is an update to the operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) integrates three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to the Final Approach Fix. These arrival streams are Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and their implantation into an operational environment. The ATD-1 goals include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

Baxley, Brian T.↗

Streamlining GNC Architecture Development and FSW Integration for the Mars Ascent Vehicle

The Mars Ascent Vehicle (MAV) will be the first vehicle to perform an ascent from the surface of another atmospheric planetary body outside of the Earth-Moon system. Significant light-time delay requires complete autonomy of flight throughout ascent, and naturally a high level of reliability is desired in both MAV’s hardware and software subsystems. The MAV Guidance, Navigation and Controls (GNC) team and the MAV Flight Software (FSW) team have partnered together to improve the efficiency of algorithm integration onto the MAV flight processor, and to increase confidence that said integration is successful and without human error. An interface architecture is proposed for the GNC suite that allows both the guidance and navigation subsystems to provide code algorithms directly in C++, and the controls subsystem to provide MATLAB Simulink auto-coded algorithms. Several continuous integration/deployment (CI/CD) methodologies have been considered for ease of transition of algorithm code from the GNC team to the FSW team. The GNC/FSW teams also worked together to develop a cFS-friendly wrapper which abstracts the integration of the GNC algorithm code into an interface-level API that is compatible with cFS. Several iterations of vehicle GNC code have been produced between the GNC/FSW team’s partnership, and this strong interface between these two teams have allowed the GNC/FSW teams to greatly increase confidence of efficient and error-free implementation of the GNC code onto MAV for a successful flight.

Engineering↗

Advanced Transport Delay Compensation Algorithms: Results of Delay Measurement and Piloted Performance Tests

This report summarizes the results of delay measurement and piloted performance tests that were conducted to assess the effectiveness of the adaptive compensator and the state space compensator for alleviating the phase distortion of transport delay in the visual system in the VMS at the NASA Langley Research Center. Piloted simulation tests were conducted to assess the effectiveness of two novel compensators in comparison to the McFarland predictor and the baseline system with no compensation. Thirteen pilots with heterogeneous flight experience executed straight-in and offset approaches, at various delay configurations, on a flight simulator where different predictors were applied to compensate for transport delay. The glideslope and touchdown errors, power spectral density of the pilot control inputs, NASA Task Load Index, and Cooper-Harper rating of the handling qualities were employed for the analyses. The overall analyses show that the adaptive predictor results in slightly poorer compensation for short added delay (up to 48 ms) and better compensation for long added delay (up to 192 ms) than the McFarland compensator. The analyses also show that the state space predictor is fairly superior for short delay and significantly superior for long delay than the McFarland compensator.

Guo, Liwen↗

Advanced Caution and Warning System

The current focus of ACAWS is on the needs of the flight controllers. The onboard crew in low-Earth orbit has some of those same needs. Moreover, for future deep-space missions, the crew will need to accomplish many tasks autonomously due to communication time delays. Although we are focusing on flight controller needs, ACAWS technologies can be reused for on-board application, perhaps with a different level of detail and different display formats or interaction methods. We expect that providing similar tools to the flight controllers and the crew could enable more effective and efficient collaboration as well as heightened situational awareness.

Spirkovska, Lilly↗

Techniques for accommodating control effector failures on a mildly statically unstable airplane

Commercial airplanes are becoming increasingly more sophisticated, placing an increasing burden on pilots to detect and resolve the exhaustive set of possible control effector failures. Automatic techniques are needed to either reconfigure an existing control law or restructure a new control law after failure. A discrete control law has been designed for the longitudinal channel of a mildly statically unstable commercial airplane, to track the glideslope during the approach to landing phase of flight. Single effector failures with time delays for failure detection and identification are analyzed for both the reconfigured and restructured control laws, and results are compared with those from previous research using a statically stable airplane. Strategies considered include reconfiguration and restructuring with new flight conditions. Validation of all cases is made using a 6 DOF nonlinear airplane simulation.

Ostroff, A. J.↗

Maiden Voyage of the Rodent Habitat on ISS: Opportunities for Investigating Molecular Mechanisms and Biomedical Consequences of Long Duration Spaceflight

Research using rodents is an essential tool for advancing biomedical research on Earth and in space. The National Research Counsel’s Decadal survey (1) emphasized the importance of expanding NASAs life sciences research to perform long duration, rodent experiments on the International Space Station (ISS). To accomplish this objective, flight hardware, operations, and science capabilities were developed at NASA ARC to support both commercial and government-sponsored research. In preparation for the maiden voyage of the Rodent Habitat hardware and operations system (Rodent Research-1), and in close consultation with a Science Working Group comprised of veterinarians and experienced spaceflight investigators, we modified existing Animal Enclosure Module hardware, developed new hardware, operations, and science activities, and performed a series of ground-based verification tests. Preflight, ground based hardware tests included a simulation of SpaceX Dragon launch conditions (vibration and hypergravity) using the Transporter, and also two long-term biocompatibility tests (32 and 92 days) using the Habitat developed for long term housing on the ISS. The launch simulation test showed that adult mice housed in Transporter hardware adapted well, even if launch simulation was followed by a period of simulated weightlessness (via hind limb unloading). The biocompatibility tests demonstrated that the Habitat successfully supported animal health and also provided a useful video imaging system that enables frequent monitoring of animal health and behavior by veterinary and scientific experts on the ground, independent of ISS crew intervention. At the conclusion of all tests, mice were deemed healthy and suitable for conducting biological research. Additional preflight analyses of tissues preserved by freezing or fixation for gene expression analyses revealed that spleen and liver tissues recovered under conditions that simulated on-orbit activities yielded high quality RNA (RIN values 8-10) and liver enzyme activities and protein content (e.g. catalase). In addition, new methods were developed to optimize future science return by dissecting tissues post-euthanasia and storage. Various tissues were harvested from either intact or partially dissected, frozen carcasses after storage for ~2-6 months; most of the tissues (brain, heart, kidney, eye, adrenal glands and skeletal muscle) were of high RNA quality for science return, whereas some tissues (small intestine, bone marrow and bones) were not. These data demonstrated the protocols developed for future flight experiments supported science return despite delayed preservation post-euthanasia or prolonged storage, and furthermore, that high-quality RNA samples from many different tissues can be recovered by dissection following prolonged storage of the tissue in situ at -80˚C. The first flight experiments carrying 20 mice were launched on Sept 21, 2014 in an unmanned Dragon Capsule, SpaceX4; Rodent Research-1 is dedicated to achieving both NASA validation and CASIS science objectives. Ground based control groups (housed in flight hardware or standard cages) were maintained in environmental chambers at Kennedy Space Center. Crewmembers previously trained in animal handling transferred mice from the Transporter into Habitats under simultaneous veterinary supervision by video streaming and were deemed healthy. Health and behavior of all mice on the ISS was monitored by video feed on a daily basis. The 10 mice for validation (16wk old, female C57Bl6/J) ambulated freely and actively throughout the Habitat, relying heavily on their forelimbs for locomotion. The first on-orbit dissections of mice were performed successfully on Oct 12 and 13, 2014, and the validation mice will reside on ISS for up to 30 days. In conclusion, new capability for long duration rodent research is under development, including in-flight sample collection (which avoids the complication of reentry); results obtained to date will be described. This new Rodent Research system enables achievement of both basic science and translational research objectives to advance human exploration of space.

maiden voyage↗

Evolution of Electronic Approval Request Procedures at Charlotte Douglas International Airport

A departure approval request, or APREQ, establishes a later runway departure time for a flight, allowing it to absorb tactical delay on the ground. APREQ times are traditionally coordinated by a process known as "call-for-release" whereby an airport surface traffic manager calls an airspace traffic manager on the telephone. This research examines new electronic APREQ coordination enabled by the NASA Airspace Technology Demonstration-2 system and compares it to the traditional call-for-release method of coordination. During the initial deployment period, electronic APREQ coordination was used for more than half of eligible flights. A majority of electronic requests were approved in less than one minute on average. Both the average tactical delay and compliance with the electronically coordinated departure times did not differ significantly from departure times coordinated using call-for-release.

APREQ↗