Search NASA⌕ Search

SEARCH · Search NASA

Results for “geologist”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

201 records · Page 12

Simulating Mars: Enabling Testing of the Perseverance Rover Sampling and Caching Subsystem on Earth

The development of the Sampling and Caching Subsystem (SCS) on the JPL Perseverance Rover lies at the intersection of testing, robotics, and geology. The SCS team established three primary system test campaigns and venues to aid in the development of SCS through verification and validation testing – Qualification Model Dirty Testing (QMDT) to provide a venue for testing in a Martian environment, Vehicle System Testbed (VSTB) for testing while integrated with the mobility subsystem on Martian-like terrain, and the Flight Software Testbed (FSWTB) for conducting tests using the flight motor controllers and software system on a hexapod which had the ability to simulate rover tilt. Each venue contributed a vital piece to the SCS building blocks. However, the QMDT venue operating within a 10-ft diameter Thermal Vacuum chamber to simulate Martian environment provided a sui generis opportunity to fine tune the entire sampling and caching process while building the team’s knowledge base about rock drillability, system life, and target selection. On Earth, because Martian rocks are not readily available, the development team must utilize geoanalogs to the rocks and regolith on Mars. Geologists on the team helped establish a set of standard rock types to use for Mars missions, like Basalt, Sandstone, Mudstone, Gypsum, and other related geoanalogs. These geoanalogs are characterized with a standard suite of tests for density, compressibility, and other characteristics to categorize potential drillability. This concept of drillability is what links the geoanalogs on Earth to the samples we collect on Mars. With the simulant characteristics defined, these geoanalog rocks are ready to be drilled into as we do on the Martian surface. A key aspect of interacting with the surface on Mars is rock target identification and selection. The Perseverance robotic system uses the on-board cameras, instrumentation, and software to collect enough information to identify potential scientific targets. With the targets identified, SCS can place the Corer and abrade the surface or collect a sample. For a ground test activity like QMDT, the test team did not have all of the camera and instrumentation systems that the rover does, so the team developed ground test equivalents to process a rock, build a target map, and define the target. The team constructed a Rock Scanning Station to build a 3D point cloud of the rock. This point cloud was then processed and evaluated with predefined and programmed criteria in a Target Downselect Tool. A primary output of the Target Downselect Tool is a defined target that can be uploaded directly to the robotic software system to simulate and build the robotic sequences used in tests. With these insights and programmatic definition of targets, the QMDT test team was able to make the same decisions that the Perseverance surface operations team does. In addition, valuable lessons learned from developing the target selection ground tools and using them were implemented into the tools used for surface operations.

Kim, Junggon↗

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog↗