Search NASA⌕ Search

SEARCH · Search NASA

Results for “high availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

New controller for high voltage converter modulator at spallation neutron source

The Spallation Neutron Source (SNS) has developed a new control system for the High Voltage Convertor Modulator (HVCM) at the SNS to replace the original control system which is approaching obsolescence. The original system was based on controllers for similar high voltage systems that were already in use [1]. The new controller, based on National Instruments PXI/FlexRIO Field Programmable Gate Array (FPGA) platform, offers enhancements such as modular construction, flexibility and non-proprietary software. The new controller also provides new capabilities like various methods for modulator pulse flattening, waveform capture, and first fault detection. This paper will discuss the design of the system, including the human machine interface, based on lessons learned at the SNS and other projects. It will also discuss performance and other issues related to its operation in an accelerator facility which requires high availability. To date, 73% of the operational HVCMs have been upgraded to with the new controller, and the remainder are scheduled for completion by mid-2017.

Wezensky, Mark W↗

Storage Requirements for Grid Integration of Marine Renewable Energy - a Parametric Study

Marine resources such as waves and tides house immense potential to serve as energy-rich sources of renewable power generation. They are known to be highly available,persistent and predictable in nature. Therefore, these can serve as one of the critical components for a primarily renewable energy-driven, resilient and robust future power grid. Although some inherent temporal characteristics of these resources lend themselves favorably to potential grid applications, the inclusion of storage allows the benefits and value streams to become realized more fully. In this paper, we present a framework for assessing impact of marine energy resources inclusion on the overall load generation balance and its impact on the relevant storage requirements to obtain the desired level of renewable energy penetration. From this study, we can critically infer two main points - (a) the relative storage requirements for grid operations with and without marine energy, and (b) the avoided cost of storage by including marine energy into the generation mix. We demonstrate our framework for two different locations across the United States.

Hanif, Sarmad↗

Muon Collider Physics Summary

The perspective of designing muon colliders with high energy and luminosity, which is being investigated by the International Muon Collider Collaboration, has triggered a growing interest in their physics reach. We present a concise summary of the muon colliders potential to explore new physics, leveraging on the unique possibility of combining high available energy with very precise measurements.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Modernizing the SNS Control System

The Spallation Neutron Source at Oak Ridge National Laboratory has been operating since 2006. An upgrade to double the machine power from 1.4 MW to 2.8 MW is currently underway and a project to add a second target station is in the preliminary design phase. While each project will add the controls needed for their specific scope, the existing control system hardware, software, and infrastructure require upgrades to maintain high availability and ensure the system will meet facility requirements into the future. While some systems have received new hardware due to obsolescence, much of the system is original apart from some maintenance and technology refresh. Software will also become obsolete and must be upgraded for sustainability. Further, requirements for system capacity can be expected to increase as more subsystems upgrade to smarter devices capable of higher data rates. This paper covers planned improvements to the integrated control system with a focus on reliability, sustainability, and future capability.

White, Karen S.↗

Experience in Remote Demolition of the Activated Biological Shielding of the Multi Purpose Research Reactor (MZFR) on the German Karlsruhe Site - 12208

In 2009, WAK Decommissioning and Waste Management GmbH (WAK) became owner and operator of the waste treatment facilities of Karlsruhe Institute of Technology (KIT) as well as of the prototype reactors, the Compact Sodium-Cooled Fast Reactor (KNK) and Multi-Purpose Reactor (MZFR), both being in an advanced stage of dismantling. Together with the dismantling and decontamination activities of the former WAK reprocessing facility since 1990, the envisaged demolishing of the R and D reactor FR2 and a hot cell facility, all governmentally funded nuclear decommissioning projects on the Karlsruhe site are concentrated under the WAK management. The small space typical of prototype research reactors represented a challenge also during the last phase of activated dismantling, dismantling of the activated biological shield of the MZFR. Successful demolition of the biological shield required detailed planning and extensive testing in the years before. In view of the limited space and the ambient dose rate that was too high for manual work, it was required to find a tool carrier system to take up and control various demolition and dismantling tools in a remote manner. The strategy formulated in the concept of dismantling the biological shield by means of a modified electro-hydraulic demolition excavator in an adaptable working scaffolding turned out to be feasible. The following boundary conditions were essential: - Remote exchange of the dismantling and removal tools in smallest space. - Positioning of various supply facilities on the working platform. - Avoiding of interfering edges. - Optimization of mass flow (removal of the dismantled mass from the working area). - Maintenance in the surroundings of the dismantling area (in the controlled area). - Testing and qualification of the facilities and training of the staff. Both the dismantling technique chosen and the proceeding selected proved to be successful. Using various designs of universal cutters developed on the basis of wall saws, both the activated steel liner and the inner reinforcing layer were cut remotely in one process. This allowed for the efficient execution of the following remote concrete removal steps using mining techniques. The electro-hydraulic demolition excavator that was purchased and then modified turned out to be an ideal tool carrier system with rapid-exchange coupling. Due to the high availability, no major delays occurred. This also was a result of the consistently implemented maintenance and repair concept. With the excavator installed in a modifiable scaffolding suspended from a rotating carrier ring, all dismantling areas could be reached and treated in spite of the small space. Thanks to an optimum organization of work-flows, routine change of dismantling work, and maintenance or repair, the iterative radiological measurement campaigns could be integrated in the whole activity without the dismantling work being disturbed significantly. The ventilation system with pressure grading and pre-filtration units ensured a low contamination level in the dismantling area. It was also possible to manage the dust formed by the milling of concrete surfaces. As it was possible to further cut metal parts and crushed concrete later on, residue flows were optimized. The planned overall period for testing, dismantling the bio-shield and removing the equipment was 36 months. The final duration was 39 months. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nominal Device Support for ATCA Shelf Manager

The ATCA standard specifies a mandatory Shelf Manager (ShM) unit which is a key element for the system operation. It includes the Intelligent Platform Management Controller (IPMC) which monitors the system health, retrieves inventory information and controls the Field Replaceable Units (FRUs). These elements enable the intelligent health monitoring, providing high-availability and safety operation, ensuring the correct system operation. For critical systems like ones of tokamak ITER these features are mandatory to support the long pulse operation. The Nominal Device Support (NDS) was designed and developed for the ITER CODAC Core System (CCS), which will be the responsible for plant Instrumentation and Control (I and C), supervising and monitoring on ITER. It generalizes the Enhanced Physics and Industrial Control System (EPICS) device support interface for Data Acquisition (DAQ) and timing devices. However the support for health management features and ATCA ShM are not yet provided. This paper presents the implementation and test of a NDS for the ATCA ShM, using the ITER Fast Plant System Controller (FPSC) prototype environment. This prototype is fully compatible with the ITER CCS and uses the EPICS Channel Access (CA) protocol as the interface with the Plant Operation Network (PON). The implemented solution running in an EPICS Input / Output Controller (IOC) provides Process Variables (PV) to the PON network with the system information. These PVs can be used for control and monitoring by all CA clients, such as EPICS user interface clients and alarm systems. The results are presented, demonstrating the fully integration and the usability of this solution. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Knowledge management information tool analytics with distributed database engine - 15737

The D and D KM-IT is a web-based knowledge management information tool custom built for the deactivation and decommissioning (D and D) user community. The system allows interested users to post information which goes through a custom work flow. To better improve the performance and user experience, the analysis of server logs is being conducted using MongoDB. MongoDB is a document database that provides high performance, high availability, and easy scalability. Objectives: - Feasibility study of Distributed Database Engine, MongoDB for web analytics; - Analyze server logs to evaluate D and D KM-IT module usage; - Generate useful information from the analysis. Method: - The server logs were loaded and stored in MongoDB for analysis; - Analysis and visualization was performed using NodeJS and Java Script library. Results: - It was possible to store log files in MongoDB; - Log files with different time stamps and groups from different servers can be aggregated; - Queries can be written to extract meaningful information from aggregated log files (e.g. users from different countries/organizations). Conclusions: - MongoDB is useful for server log analytics as the analyst can immediately access, analyze, and visualize MongoDB data based on the requirements; - The information can be extracted to develop custom reports; - Optimized queries can be run for fast data access. Path forward: - Custom queries need to be developed to extract information leading to improved user information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

To Decommission or Not To Decommission? That is the Question... Revisited

Major Highlights Comparing 1998 to 2014: Favoring Plant Shutdown: Electric utility deregulation has created greater competition; Markets have been disrupted by cheap natural gas; Despite high availability, cost of electric power from natural gas still below break-even cost of nuclear generation; Emerging ISO acceptance of fluctuating renewable energy on the grid. Favoring DECON: D and D technologies have matured; Reactor Vessel and Internals segmentation methods still being refined; Nuclear workforce is 16 years older and leaving the nuclear industry (Impact on D and D TBD); Avoiding risk of more restrictive regulation and higher LLW disposal costs. Favoring SAFSTOR: Full funding of NDT still major driver for deferring immediate dismantlement. SAFSTOR vs. near term D and D influenced by: Status of and confidence in decommissioning fund (NDT) and cost estimate; Local and state politics; Public pressure. Most early shutdown plants tend to have under-funded decommissioning funds and opt for SAFSTOR. SAFSTOR allows for fund growth through interest compounding, but must assume that cost increase is less than fund growth: May not be true across the board, Much uncertainty/risk in waste disposal costs, regulatory requirements, etc. when projected out several decades. Once initiated SAFSTOR decision is not easily changed to DECON: Plant infrastructure equipment and components not readily available, RCS chemical decontamination can be very challenging, Key/knowledgeable plant personnel are gone. Consideration for phased approach to DECON: Remove >95% of the radiological source term under today's known regulations and cost by full System Decontamination of the primary circuit systems, and removal of NSSS and decontamination of the Containment Building; Improves risk profile in those areas most vulnerable to excessive cost growth; Able to defer D and D of the remainder of the plant to allow for the NDT to grow with interest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Solid Pyrex Rod for Conceptual Soluble Boron Free SMR

Various small modular reactor (SMR) designs have been proposed by the nuclear vendors and universities in order to address the energy needs for developing countries and remote communities. Most of them target for the long-term fuel cycle of 4 years or more to achieve high availability. In addition, soluble boron free operation is proposed to simplify the primary system, to enhance the safety characteristics by inherent negative moderator temperature coefficients, etc. The Pyrex rods are used to hold-down the excess reactivity in the core. In order to achieve the cycle length of 4 years, Solid Pyrex rods are used for Conceptual Soluble Boron Free SMR (CSBF-SMR) design. The Solid Pyrex rods which are one of conventional burnable absorbers (BAs) have advantages in the license and applicability into current design of fuel assembly. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Effects of Reflector on Core Reactivity for Conceptual Soluble Boron Free SMR

Various small modular reactor (SMR) designs have been proposed by the nuclear vendors and universities in order to address the energy needs for developing countries and remote communities. Most of them target for the long-term fuel cycle of 4 years or more to achieve high availability. In addition, soluble boron free operation is proposed to simplify the primary system, to enhance the safety characteristics by inherent negative moderator temperature coefficients, etc. The neutron economy should be improved to achieve longer cycle length with a small core. Therefore, analysis of reflector for Conceptual Soluble Boron Free SMR. (CSBF-SMR) is required. In this study, five materials for radial reflector were selected to investigate the effect on core reactivity. Their thickness was also analyzed to get an optimum configuration. The goal of this study is to determine optimum material and thickness of reflector of the CSBF-SMR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of an Adder-Topology ILC Damping Ring Kicker Modulator

The ILC damping ring injection and extraction kickers will require high availability modulators that can deliver {+-}5 kV pulses into 50 {Omega} with a 2 ns flattop ({approx}1 ns rise and fall time) at up to 6 MHz. An effort is underway at SLAC National Accelerator Laboratory to meet these requirements using a transmission line adder topology to combine the output of an array of {approx}1 kV modules. The modules employ an ultra-fast hybrid MOSFET/driver that can switch 33 A in 1.2 ns. Experimental results for a scale adder structure are presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extending ACNET communication types to include multicast semantics

In Fermilab's accelerator control system, multicast communication wasn't properly incorporated into ACNET's transport layer, nor in its programming API. We present some recent work that makes multicasts naturally fit in the ACNET network environment. We also show how these additions provide high-availability for ACNET services.

99 GENERAL AND MISCELLANEOUS↗

Towards a PEBB-Based Design Approach for a Marx-Topology ILC Klystron Modulator

Introduced by the U.S. Navy more than a decade ago, the concept of Power Electronic Building Blocks (PEBBs) has been successfully applied in various applications. It is well accepted within the power electronics arena that this concept offers the potential to achieve increased levels of modularity and compactness. This approach is thus ideally suited for applications where easy serviceability and high availability are key, such as the ILC. This paper presents a building block approach for designing a Marx-topology ILC klystron modulator.

43 PARTICLE ACCELERATORS↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, within a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability, and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation, testing results, and other information. Where appropriate, actual performance history was used to calculate failure rates for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to assess compliance with requirements and to highlight design or performance shortcomings for further decision making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability, and maintainability analysis, and present findings and observation based on analysis leading to the Ground Operations Project Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, in a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation; testing results, and other information. Where appropriate, actual performance history was used for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to verify compliance with requirements and to highlight design or performance shortcomings for further decision-making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability and maintainability analysis, and present findings and observation based on analysis leading to the Ground Systems Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

Optimal subhourly electricity resource dispatch under multiple price signals with high renewable generation availability

This article proposes a system-wide optimal resource dispatch strategy that enables a shift from a primarily energy cost-based approach, to a strategy using simultaneous price signals for energy, power and ramping behavior. A formal method to compute the optimal sub-hourly power trajectory is derived for a system when the price of energy and ramping are both significant. Optimal control functions are obtained in both time and frequency domains, and a discrete-time solution suitable for periodic feedback control systems is presented. The method is applied to North America Western Interconnection for the planning year 2024, and it is shown that an optimal dispatch strategy that simultaneously considers both the cost of energy and the cost of ramping leads to significant cost savings in systems with high levels of renewable generation: the savings exceed 25% of the total system operating cost for a 50% renewables scenario.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗