Search NASA⌕ Search

SEARCH · Search NASA

Results for “inline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Review of Bison Usage in VERA

Bison is being used in VERA in a variety of ways; this milestone will document an independent review of the current usage of Bison and provide guidance that will improve the accuracy, performance, and consistency in the ways that Bison is used. This task will entail running a suite of small, single and multi-cycle problems with VERA-CS, followed by Bison, and Tiamat (inline) and evaluating the usage. It will also entail performing several detailed ramp to full power solutions to compare the one-way coupled solver with the fully-coupled Tiamat. This will include at least one iteration with the PHI team to incorporate some of the feedback and improve the usage. This work will also be completed in conjunction with an FMC task to evaluate the ability of Bison to model load-follow in a PWR

97 MATHEMATICS AND COMPUTING↗

Production Facility Prototype Blower 1000 Hour Test Results II

Long duration tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks were not included in these tests. Five 1000 hour tests have been completed since the first test was performed in January of 2016. All five 1000 hour tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for each test, including a review of the first and second tests, are included in this report.

42 ENGINEERING↗

Test Problems for Programmed Burn [Slides]

This document presents updated FLAG results for the Kenamond programmed burn test problems. Problem definition, exact solutions for constant detonation velocity, and FLAG results using a Huygens solution are provided in Kenamond’s “Lund High Explosive Programmed Burn Model in the FLAG Code” LA-UR-09-08297. FLAG results using Line-of-Sight (LOS) preconditioning of the Huygens solution are presented in Kenamond’s “Line-of-Sight (LOS) High Explosive Programmed Burn Model in the FLAG Code” LA-UR-09-08296. FLAG has an old, serial, uniform-grid “mapped” 2D DSD solver and a new, inline, parallel, conformal mesh 2D/3D DSD solver. These solvers will be exercised with flat Dn-Kappa relations to facilitate comparison with analytic solutions. The remaining slides document FLAG results with 1) Huygens, 2) Huygens with LOS, 3) old DSD, and 4) new DSD. By design, these geometries are coarsely meshed. Plotting error with respect to the analytic solutions reveals sensitivities to element type, element aspect ratio, boundary conditions, detonator timing, and discontinuous detonation velocity. In all plots of this document, color is absolute error relative to the exact solution. In all plots of this document, contours are burntime isochrones of the numerical solution.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Filtration of Hanford Tank AP-107 Supernatant

Bench-scale filtration testing of 9.5 liters of 241-AP-107 supernatant was conducted using two different crossflow filters (CFFs) and two different dead-end filters (DEF) in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. The following filters were tested: Mott CFF Model 7610 (media grade 5); Mott CFF Model 7610 (media grade 0.1); Mott inline filter Model 6480 (media grade 5) (also known as the backpulsed dead-end filter, BDEF); and, Mott 70-mm disc filter (media grade 0.1) (also known as the dead-end filter, DEF) The CFFs were tested in the cells unit filter (CUF) system in recycle mode and the DEFs (in-line and disc) were used to dewater the feed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Production Facility Prototype Blower 1000 Hour Test Results III

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Eight long duration 500 and 1000 hour tests have been completed since the first test was performed in January of 2016. All eight long duration tests have proven successful in exposing preventable issues related to oil and helium leaks.

47 OTHER INSTRUMENTATION↗

Fiscal Year 2019 Filtration of Hanford Tank AP-107 Supernatant

Bench-scale filtration testing of 9 liters of 241-AP-107 supernatant was conducted using two different filters in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. The following filters were tested: (1) Mott inline filter Model 6480 (media grade 5) (also known as the backpulsed dead-end filter, BDEF) (2) Mott 70-mm disc filter (media grade 5) (also known as the dead-end filter, DEF) The BDEF was used to filter approximately 7 liters of AP-107 at a targeted flux of 0.065 gpm/ft 2 and exhibited no measurable pressure increase during filtration. The BDEF was backpulsed after 17.5 hours of filtration and no solids were observed in the backpulse concentrate. The DEF was used to filter 2 liters of AP-107 feed and no increase in filter resistance was measured and no solids were observed on the filter at the conclusion of filtration. Results are in contrast to similar filtration testing of 241-AP-107 supernatant received in fiscal year 2018, where solids were observed and collected and caused a measurable increase in filtration resistance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Production Facility Prototype Blower 1000 Hour Test Results IV

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Twelve long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All twelve long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the ninth test to the twelfth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, and III.

42 ENGINEERING↗

Low Cost (CAPEX and variable): Tool design for cell and module fabrication with thin, free-standing silicon wafers

This project aimed to develop technologies that can potentially enable free-standing thin (<80 μm) wafer in today’s manufacturing lines with high production yield, and thereby reduce capex barriers of silicon photovoltaics cells and modules. One of the major benefits is that thin wafer dramatically reduces the amount of polysilicon required. As a result, it can lead to reduction in the capital expenditures associated with polysilicon refining and wafer fabrication, which together are more than half of the total capital expenditure to manufacture Si PV module. We focused our efforts on developing the tools needed to enable high yield fabrication of wafer, cell, and module with thin silicon wafers. However, as the wafer thickness reduces, the major challenge is that wafer breakage increases significantly. Three technological areas were explored in this project to improve the production yield of the silicon wafer, namely detection of edge cracks via dark-field near-infrared (NIR) scattering; (2) wafer handling using controlled temperature profiles; (3) manufacturable low-stress cell interconnection for multiwire. First, the formation of wafer cracks in submillimeter length is one of the reasons that causes wafer breakages. Crack detection tools are needed to enable us to locate and track the wafer crack during manufacturing, so that we can improve the process to reduce initialization. The state-of-the-art crack detection technique cannot fulfill the need for measuring submillimeter edge cracks detrimental for thin wafers. The prototype developed in this project demonstrates the scanning of microcracks near wafer edges. With a semi-automatic laboratory setup, the submillimeter cracks were reliably detected near the edges in multi-Si wafers. The smallest detectable crack is 200 µm in length in slow scans; and submillimeter cracks are detected in high-throughput scans at the scan speed of >0.5 m/s, which is compatible with the inline detection of a manufacturing line at least 1 sec/wafer. This detection limit is a significant advancement in comparison to the benchmarked industrial tool. Second, wafer handling with the well-controlled temperature profile was thought to be the solution to reduce crack initiation and propagation during the manufacturing. However, without crack detection being widely adopted in production line, we did not find a strong industrial pull toward this technology. We did an initial literature survey and then diverted our efforts to the other tasks. Third, the innovation on low-stress multi-wire interconnection tackles a fundamental problem in the standard interconnection scheme. The standard over-under “zig-zag” interconnection induces a significant amount of stress into the soldering point on the cell whenever PV module is under stress, e.g., thermal cycling, transportation, and installation. Therefore, the interconnection process was re-designed in this project to allow for significant movement between adjacent solar cells, e.g., due to thermal expansion, without building up stresses on the solar cells or solder joints. The new interconnection method with the cross-connect wire also simplifies the tabbing and stringing process by replacing the standard over-under method with an off-cell interconnect from top to bottom. A manual tabbing and stringing tool for this new process was prototyped in the lab to demonstrate the fabrication of this new interconnection design. During the test with brass sheets as our “testing cells”, it was found that the mechanical cycling test only broke the interconnection after more than 50,000 cycles, which is equivalent to more than 130 years of the day-and-night thermal cycles. Lastly, throughout the project, we continuously analyzed the PV market with techno-economic analysis to identify the opportunity for thin Si adoption. Even though the drastic cost reduction has already happened in the past five years, our analysis results indicated that we can still save quite significantly in both manufacturing cost and factory capex, Particularly, in order to grow the PV manufacturing capacity to multi-terawatt level, reducing the thickness of silicon wafer is one of the most effective ways to quickly reduce factory capex, and sustain the high growth rate. The technologies developed in this project are readily available to provide some assistances in tackling the production yield problem.

14 SOLAR ENERGY↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

Hydrodynamic and Radiographic Toolbox (HART)

With a multi-lab and university team, we propose to develop new methods for a Hydrodynamic and Radiographic Toolbox (HART) that will enable a fuller and more extensive use of experimental radiographic data towards better characterizing and reducing uncertainties in predictive modeling of weapons performance. We will achieve this by leveraging recent developments in areas of computational imaging, statistical and machine learning, and reduced order modeling of hydrodynamics. In terms of software practices, by partnering with XCP (RISTRA Project) we will conform to recent XCP standards that are inline with modern software practices and standards and ensure compatibility and ease of inter-operability with existing codes. Three new activities under this proposal include (a) the development and use of deep learning-based surrogates to accelerate reconstruction and variational inference of density fields from radiographs of hydrotests, (b) a model-data fusion strategy that couples deep learning-based density reconstructions with fast hydrodynamics simulators to better constrain the reconstruction, and (c) a method for treating asymmetries using techniques adopted from limited view tomography. All three new activities will be based on improved treatment of scatter, noise, beam spot movement, detector blur, and flat fielding in the forward model, and a use of sophisticated priors to aid in the re construction. The improvements to the forward model and improved algorithmic design of the reconstruction when complete will be contained in the iterative reconstruction code SHIVA—a code project that we have recently initiated. The many ways in which machine learning can be used in the reconstruction work will be contained in a code HERMES that has been initiated with DTRA support. For example, the significant levels of acceleration that will likely be achieved by the use of machine learning techniques will permit us (and are required) to quantify uncertainties in density retrievals. Next, the two-way coupling between density reconstruction and model-based simulation of the hydrodynamics will be contained in code EREBUS, and will permit a fuller realization of the potential of the data to constrain the hydrodynamic model and better address issues related to asymmetries in the problem. Finally, we anticipate that the better consistency with physics achieved in our reconstructions will allow them to be used by X-Division more so than today.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Fiscal Year 2020 Filtration of Hanford Tank Waste 241-AP-105

Bench-scale filtration testing of 15 liters of 241-AP-105 supernatant was conducted using a Mott inline filter Model 6610 (media grade 5) backpulsed dead-end filter (BDEF) in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. The as-received samples were diluted with raw water from the Hanford Site to assess the propensity for solids to form upon dilution and to assess the impact those solids have on filtration performance. The feed was split into two batches. The first batch was settled and decanted as planned in Tank Side Cesium Removal operations. The BDEF was used to filter this AP-105 feed at a targeted flux of 0.065 gpm/ft 2 and exhibited no measurable pressure increase during filtration. The second batch was fed to the BDEF with solids resuspended. This was also operated at the targeted flux of 0.065 gpm/ft 2 . In this case, the target pressure differential of 2 psid (resistance of 6.24 × 10 10 m -1 ) was reached in slightly more than 12 h. A backpulse restored the filter flux; however, the time to the next backpulse was slightly shorter. These tests indicate that after the addition of raw water, settle and decant effectively removed solids from the feed. It is not possible to assess the time required for these solids to settle based on the result from these tests. However, if sufficient time is allowed for the solids to settle, no measurable filter fouling was observed in current testing. In contrast, if insufficient time is allowed for solids to settle, filter fouling will occur relatively quickly and will likely require backpulses more frequently than every 12 hours (1.91 m 3 /m 2 volume filtered). Solids concentrated from backpulse solutions displayed large variability in composition with Al-silicates and mixed chromium-aluminum oxide phases. Amounts of Mg, Fe, and Ca were also found in the presence of Na and O. These solids could be grouped in three categories: (1) soluble Na-salts that formed large block-like particles but were made up of fibrous materials, (2) amorphous Al-phases, and (3) colloidal iron oxides with an average particle diameter of 4.2 µm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experiments Simulations and Diagnostics for Spatial and Temporal Resolution of Liquid Atomization

Progress toward quantitative measurements and simulations of 3D, temporally resolved aerodynamic induced liquid atomization is reported. Columns of water and galinstan (liquid metal at room temperature) are subjected to a step change in relative gas velocity within a shock tube. Breakup morphologies are shown to closely resemble previous observations of spherical drops. The 3D position, size, and velocity of secondary fragments are quantified by a high-speed digital inline holography (DIH) system developed for this measurement campaign. For the first time, breakup dynamics are temporally resolved at 100 kHz close to the atomization zone where secondary drops are highly non-spherical. Experimental results are compared to interface capturing simulations using a combined level set moment of fluid approach (CLSMOF). Initial simulation results show good agreement with observed breakup morphologies and rates of deformation.

36 MATERIALS SCIENCE↗

Opacity Table Generation

Radiation opacity is a key property of material systems which describes the absorption and scattering of photons. Such processes are an important part of energy transport, diagnostics, and astrophysical phenomena. Recent experiments in iron opacity and continuum lowering have sparked renewed interest in and careful vetting of opacity models. Even within the local thermodynamic equilibrium approximation, opacity varies over a large parameter space: material, temperature, density, and energy. Opacity tables that span wide regimes of this parameter space are of prime importance to radiation-hydrodynamics codes. Accurate opacity calculations cannot be achieved inline during a radiation hydrodynamics simulation since they involve accounting for all possible electron transitions of all important atomic states of a thermal ensemble. Livermore’s current framework utilizes precalculated tables at many densities, temperatures, and energies. Last year, the opacity theory team completed an L2 milestone concerning the development of a new code, Opus, which served the dual purpose of creating a modern code infrastructure and version control as well as the basis for training new members of that team, a critical need as key members near or are passed retirement. For the current L2 milestone, we exercised and validated Opus on three elements: boron, carbon, and nitrogen, which have few enough electrons to allow a careful convergence study over many input parameters. Here, we report on the production of new tables, show their convergence with respect to important parameters, state some of their limitations, and document a mostly automated production process. In this section, we address the milestone completion criteria, found on the title page and the subsection headings. In section 2, we validate Opus against Tycho and compare with TabOp and Atomic. Section 3 details some of the physics implemented in Opus and relevant to this report. We then cover details of the density-temperature grid in section 4 and do a spectral comparison between different parameter settings and different codes in section 5. After summarizing these results in section 6, we give instructions how to run the opacity table scripts in appendix A and document the scripts and input/output files in appendix B.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Production Facility Prototype Blower 1000 Hour Test Results V

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Thirteen long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All thirteen long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the thirteenth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, III, and IV.

36 MATERIALS SCIENCE↗

Fiscal Year 2021 Filtration of Hanford Tank 241-AP-107 Supernatant Samples Obtained at Prototypic Tank Level and Filtered at 16 °C

Bench-scale filtration testing of 8.5 liters of supernatant from Hanford waste tank 241-AP-107, chilled to 16 °C, was conducted using a backpulse dead-end filter (BDEF) filtration system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. This was done to assess the impact of a lower sampling location within the tank as well the lowered filtration temperature on supernatant stability and fouling. The as-received samples were transferred to 1.5-liter poly bottles and held at 16 °C for approximately 1 week prior to filtration. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 to match the prototypic operation of the TSCR system. During the initial period of filtration, the differential pressure required to effect filtration at 0.065 gpm/ft 2 increased until it reached 2 psid [the Tank Side Cesium Removal (TSCR) action limit] at 26 hours. After this, the filter was backpulsed to dislodge accumulated solids and reduce this pressure differential. An additional eight backpulses were conducted during the initial filtration period; each time, the target pressure was reached sooner than during the previous interval. Volume filtered decreased from 0.9 to 0.03 m 3 /m 2 over the course of 14 processing hours. After the ninth backpulse, the backpulse frequency had become unsustainable, and it was decided to perform an extensive filter cleaning. The filter was cleaned by draining the chilled AP-107 feed into chilled holding containers, introducing 0.1 M NaOH into the feed vessel, and recirculating the NaOH through the system for 20 minutes before allowing the system to soak for 2 hours without temperature control. A measurable decrease in filter resistance during this recirculation indicated that the 0.1 M NaOH was likely dissolving some of the solids that had deposited on the filter. Post cleaning, the filter resistance was effectively restored to initial conditions as the initial transmembrane pressure was restored to original levels. However, resumed processing of the AP-107 feed at 16 °C continued to result in an increased rate of filter resistance. An additional five backpulses were conducted (four during feed processing, one during subsequent cleaning) before the conclusion of the test. Solids concentrated from the backpulse solutions displayed sodium oxalate-type phases, Al-oxides and sodium Al-oxides/carbonates, iron oxides, and Ca-bearing phases (calcite). The scanning electron microscopy analyses also revealed a large distribution of particles, with some particles, notably sodium phosphate dodecahydrate, having diameters close to 0.5 mm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Configuration Evaluation for Process Settling of Hanford Waste Solid Particles

Direct Feed High-Level Waste (DFHLW) is a potential flowsheet operations approach to initiating high-level waste (HLW) vitrification prior to completion of the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. A settle/decant process has been proposed to concentrate solids prior to delivery to the WTP HLW Facility during DFHLW operations, wherein the solids in a settled layer would be remixed with the supernatant liquid remaining after decanting operations to provide the feed at required solids concentrations. Settling would be used in lieu of purpose-built filtration or other solids separation equipment. Pacific Northwest National Laboratory (PNNL) is providing baseline technical support to the Washington River Protection Solutions (WRPS) Flowsheet Integration group. To support planning for DFHLW, WRPS previously requested that PNNL evaluate the current data set available to predict the time needed for HLW solids to settle and the solids concentration and strength of that settled layer, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling times. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers. In addition to the data gaps, an overarching observation was made that there is significant variation in behavior of settling rate and settled layer data. The settling time required to concentrate solids via a settle/decant process was determined from the limited data to have a difference of potentially more than a factor of 5,000 in the estimated settling times, varying from 0.2 to 1,060 days for example depending on process vessel depth and final sediment solids concentration. In contrast, successful processes of liquid-forward output streams resulting from in-tank settling and decanting forward liquid have been reported for operations conducted at the Hanford Site. The purpose of this current report is to further support DFHLW planning by evaluating double-shell tank (DST) and alternate vessel equipment and operational configurations to enable optimization of the settle/decant process to concentrate solids. Hanford waste processing behavior specific to liquid feed availability following a slurry transfer in a DST is summarized, including process stream characteristics and process equipment configurations. The performance of DST process equipment configurations is evaluated for possible improvements using computational fluid dynamics (CFD) and simple analytical models. Potential new vessel design(s) specific to enabling effective settle/decant processes, and cursory summary of other separate and inline solids separations processes, are also provided. The CFD results indicated that improvement in outflow solids concentration was promoted by a reduction in the slurry flow rate, angling the distributor nozzles downward, and lifting the transfer pump. The solid-liquid analysis evaluating particle trajectory confirmed that the potential for particle ingestion (in the transfer pump) was decreased with increased radial separation between the inlet and outlet (transfer pump inlet), decreased inlet flow, and decreased liquid density and viscosity for a neutrally buoyant inlet flow. An assessment was also made of the potential for inflow configuration changes to result in the discrete mounding or piling of solids within the tank. Based on the characterization of the settled waste to date, HLW sediments will be unlikely to sustain a substantial angle of repose to facilitate significant variations in the elevation of the settled solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY20 Proxy App Suite Release: Report for ECP Proxy App Project Milestone ADCD-504-10

Version 4.0 of the ECP Proxy App Suite is practically unchanged from the previous release. The current set of proxies has proven useful for many aspects of benchmarking and co-design and we see little reason to alter the suite. Although there have been few changes to the ECP suite, the team has been hard at work in other areas. In the area of Machine Learning (ML) we have now created a separate proxy suite dedicated to this scientific applications of ML. The suite includes: miniGAN (Generative Adversarial Networks), miniRL (Reinforcement Learning), CRADL (inline inference), Cosmoflow-Benchmark (Convolutional Neural Network), and MLPerf-DeepCam (Climate Segmentation Benchmark). Section 3 contains more information about these proxies as well as the principles that are guiding the development of the suite. We have surveyed available proxies for several application domains including Computational Fluid Dynamics, Quantum Chemistry, Quantum Computing Simulation, Molecular Dynamics, Monte Carlo Transport, and Density Functional Theory to identify gaps in proxy coverage. Several new proxy apps are either already available or will be released soon to fill these gaps. Section 4 provides full details. Finally, section 5 reports on our continued collaboration with the ECP Continuous Integration (CI) effort to use proxy apps to help identify problems and roadblocks to cross-lab CI. We have also assisted the El Capitan Center of Excellence (COE) to stand up a CI system that will be used to test releases of HPE and AMD software stacks. We hope that the COE effort can serve as a model for ECP by showing how the Proxy App Team can work with AD and ST teams identify critical features, kernels, patterns, etc. and incorporate them into a CI system that will help ensure that Frontier and Aurora will provide those needed capabilities.

97 MATHEMATICS AND COMPUTING↗

Continuous Fiber Bath Treatments at Pilot Scale: A Novel Testbed System

The technical demands on high performance textiles continues to expand, and the research community has answered the call with innovative fiber bath treatments for enhanced properties and sizings for improved composites. However, little translation to greater scale has been demonstrated. To fill this gap, a novel, multifunctional system has been developed to explore polymer fiber treatment methods, the deployment of nanoadditive coatings and other sizings, and smart processing methods at the pilot scale. Continuous tows of fibers can be passed through a temperature-controlled, crossflow bath with an immersion residence time exceeding 2 hours. The modular system is resistant to corrosive solutions, includes additional inline stations for washing and drying after processing, is equipped with a bevy of sensors, pumps, and valves monitored and controlled by a LabView program, and can be fully contained in a standard lab fume hood. This new testbed system, when coupled with high fidelity materials characterization methods, will enable rapid evaluation of new fiber treatment methods at pilot-scale.

36 MATERIALS SCIENCE↗