Search NASA⌕ Search

SEARCH · Search NASA

Results for “interrupt”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Dopant Optimization of Donors in Semiconductor Opening Switches to Eliminate Prepulse

Semiconductor opening switches are solid-state devices capable of delivering nanosecond, hundreds of kilovolts pulses by interrupting kiloamps of current. The interruption of the current occurs in a moderately doped p-region when a high electric field region (HFR) is formed. The HFR occurs because the reverse pumping current cannot be supported by the saturation velocity and majority carrier concentration of the doping level. However, the donor profile also significantly affects the pulse performance. A secondary prepulse occurs if a secondary HFR is formed at the interface of the background n-doping and N+ doping (X n ) . By moving the location of X n deeper into the diode, the effect of the prepulse is reduced. This article investigates the effect of the donor doping profile on the performance metrics of semiconductor opening switches through technology computer-aided design (TCAD) simulations and experimental results. Through a SILVACO TCAD optimization, we designed a P + /p/n - base/n/N + where the intersection of the moderate p-region and intrinsic n-base region (X p ) is at 160 μm and X n is at 220 μm. This profile is fabricated via silicon epitaxy. Experimentally, it is shown that a deep X n (220 μm) compared with a shallow X n (300 μm) reduces the rise time by >5× . In addition, the magnitude of current density during interruption affects the prepulse foot and pulse shape. At lower current densities without the graded donor profile, high peak voltages are not achieved. Comparing the experimental results to the TCAD simulations shows that the model is predictive under high-current densities in the semiconductor opening switch (SOS) regime.

nanosecond pulse power↗

Investigation of interfacial impurities in m-plane GaN regrown p-n junctions for high-power vertical electronic devices

GaN is an attractive material for high-power electronics due to its wide bandgap and large breakdown field. Verticalgeometry devices are of interest due to their high blocking voltage and small form factor. One challenge for realizing complex vertical devices is the regrowth of low-leakage-current p-n junctions within selectively defined regions of the wafer. Presently, regrown p-n junctions exhibit higher leakage current than continuously grown p-n junctions, possibly due to impurity incorporation at the regrowth interfaces, which consist of c-plane and non-basal planes. Here, we study the interfacial impurity incorporation induced by various growth interruptions and regrowth conditions on m-plane p-n junctions on free-standing GaN substrates. The following interruption types were investigated: (1) sample in the main MOCVD chamber for 10 min, (2) sample in the MOCVD load lock for 10 min, (3) sample outside the MOCVD for 10 min, and (4) sample outside the MOCVD for one week. Regrowth after the interruptions was performed on two different samples under n-GaN and p-GaN growth conditions, respectively. Secondary ion mass spectrometry (SIMS) analysis indicated interfacial silicon spikes with concentrations ranging from 5e16 cm -3 to 2e18 cm -3 for the n-GaN growth conditions and 2e16 cm -3 to 5e18 cm-3 for the p-GaN growth conditions. Oxygen spikes with concentrations ~1e17 cm -3 were observed at the regrowth interfaces. Carbon impurity levels did not spike at the regrowth interfaces under either set of growth conditions. We have correlated the effects of these interfacial impurities with the reverse leakage current and breakdown voltage of regrown m-plane p-n junctions.

42 ENGINEERING↗

SU-E-J-150: Impact of Intrafractional Prostate Motion On the Accuracy and Efficiency of Prostate SBRT Delivery: A Retrospective Analysis of Prostate Tracking Log Files

Purpose: To measure intrafractional prostate motion by time-based stereotactic x-ray imaging and investigate the impact on the accuracy and efficiency of prostate SBRT delivery. Methods: Prostate tracking log files with 1,892 x-ray image registrations from 18 SBRT fractions for 6 patients were retrospectively analyzed. Patient setup and beam delivery sessions were reviewed to identify extended periods of large prostate motion that caused delays in setup or interruptions in beam delivery. The 6D prostate motions were compared to the clinically used PTV margin of 3–5 mm (3 mm posterior, 5 mm all other directions), a hypothetical PTV margin of 2–3 mm (2 mm posterior, 3 mm all other directions), and the rotation correction limits (roll ±2°, pitch ±5° and yaw ±3°) of CyberKnife to quantify beam delivery accuracy. Results: Significant incidents of treatment start delay and beam delivery interruption were observed, mostly related to large pitch rotations of ≥±5°. Optimal setup time of 5–15 minutes was recorded in 61% of the fractions, and optimal beam delivery time of 30–40 minutes in 67% of the fractions. At a default imaging interval of 15 seconds, the percentage of prostate motion beyond PTV margin of 3–5 mm varied among patients, with a mean at 12.8% (range 0.0%–31.1%); and the percentage beyond PTV margin of 2–3 mm was at a mean of 36.0% (range 3.3%–83.1%). These timely detected offsets were all corrected real-time by the robotic manipulator or by operator intervention at the time of treatment interruptions. Conclusion: The durations of patient setup and beam delivery were directly affected by the occurrence of large prostate motion. Frequent imaging of down to 15 second interval is necessary for certain patients. Techniques for reducing prostate motion, such as using endorectal balloon, can be considered to assure consistently higher accuracy and efficiency of prostate SBRT delivery.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SU-E-T-426: Feasibility of Stereotactic Body Radiation Therapy (SBRT) Treatment of Pancreatic Cancer Using Volumetric Modulated Arc Therapy (VMAT) with Active Breathing Control (ABC)

Purpose: SBRT shows excellent tumor control and toxicity rates for patients with locally advanced pancreatic cancer (PCA). Herein, we evaluate the feasibility of using VMAT with ABC for PCA SBRT. Methods: Nine PCA patients previously treated via SBRT utilizing 11-beam step-and-shoot IMRT technique in our center were retrospectively identified, among whom eight patients received 3300cGy in 5 fractions while one received 3000cGy in 5 fractions. A VMAT plan was generated on each patient’s planning CT in Pinnacle v9.8 on Elekta Synergy following the same PCA SBRT clinical protocol. Three partial arcs (182°–300°, 300°-60°, and 60°-180°) with 2°/4° control-point spacing were used. The dosimetric difference between the VMAT and the original IMRT plans was analyzed. IMRT QA was performed for the VMAT plans using MapCheck2 in MapPHAN and the total delivery time was recorded. To mimic the treatment situation with ABC, where patients hold their breath for 20–30 seconds, the delivery was intentionally interrupted every 20–30 seconds. For each plan, the QA was performed with and without beam interruption. Gamma analysis (2%/2mm) was used to compare the planned and measured doses. Results: All VMAT plans with 2mm dose grid passed the clinic protocol with similar PTV coverage and OARs sparing, where PTV V-RxDose was 92.7±2.1% (VMAT) vs. 92.1±2.6% (IMRT), and proximal stomach V15Gy was 3.60±2.69 cc (VMAT) vs. 4.80±3.13 cc (IMRT). The mean total MU and delivery time of the VMAT plans were 2453.8±531.1 MU and 282.1±56.0 seconds. The gamma passing rates of absolute dose were 94.9±3.4% and 94.5±4.0% for delivery without and with interruption respectively, suggesting the dosimetry of VMAT delivery with ABC for SBRT won’t be compromised. Conclusion: This study suggests that PCA SBRT using VMAT with ABC is a feasible technique without compromising plan dosimetry. The combination of VMAT with ABC will potentially reduce the SBRT treatment time.

60 APPLIED LIFE SCIENCES↗

Quenching of an electric arc in a vacuum gap with a uniform transverse magnetic field

The breaking ability of a vacuum arc interrupter with a uniform transverse magnetic field formed by a system of permanent magnets was investigated experimentally. The vacuum interrupter with a 0.5-{mu}F shunting capacitor switched off a dc current of up to 150 A at magnetic fields of 100-180 mT. At magnetic fields of 120-160 mT, the breaking ability of the vacuum interrupter was increased to 300 A by introducing a nonuniformity in the magnetic field distribution near the contact surface.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The Numerical Simulation of the Nanosecond Switching of a p-SOS Diode

Abrupt high-density reverse current interruption has been numerically simulated for switching from forward to reverse bias in a silicon p{sup +}P{sub 0}n{sup +} structure (p-SOS diode). It has been shown that the current interruption in this structure occurs as a result of the formation of two dynamic domains of a strong electric field in regions in which the free carrier concentration substantially exceeds the concentration of the doping impurity. The first domain is formed in the n{sup +} region at the n{sup +}P{sup 0} junction, while the second domain is formed in the P{sup 0} region at the interface with the p{sup +} layer. The second domain expands much faster, and this domain mainly determines the current interruption rate. Good agreement is achieved between the simulation results and the experimental data when the actual electric circuit determining the electron–hole plasma pumping in and out is accurately taken into account.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Assessing Changes in the Reliability of the U.S. Electric Power System

Over the past 15 years, the most well-publicized efforts to assess trends in U.S. electric power system reliability have focused only on a subset of all power interruption events (see, for example, Amin 2008 and Campbell 2012)—namely, only the very largest events, which trigger immediate emergency reporting to federal agencies and industry regulators. Anecdotally, these events are thought by many to represent no more than 10% of the power interruptions experienced annually by electricity consumers. Moreover, a review of these emergency reports has identified shortcomings in relying on these data as reliable sources for assessing trends, even with the reliability events they report (Fisher et al. 2012). Recent work has begun to address these limitations by examining trends in reliability data collected annually by electricity distribution companies (Eto et al. 2012). In principle, all power interruptions experienced by electricity customers, regardless of size, are recorded by the distribution utility. Moreover, distribution utilities have a long history of recording this information, often in response to mandates from state public utility commissions (Eto et al. 2006). Thus, studies that rely on reliability data collected by distribution utilities can, in principle, provide a more complete basis upon which to assess trends or changes in reliability over time.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Capturing the Impact of Storage and Other Flexible Technologies on Electric System Planning

Power systems of the future are likely to require additional flexibility. This has been well studied from an operational perspective, but has been more difficult to incorporate into capacity expansion models (CEMs) that study investment decisions on the decadal scale. There are two primary reasons for this. First, the necessary input data, including cost and resource projections, for flexibility options like demand response and storage are significantly uncertain. Second, it is computationally difficult to represent both investment and operational decisions in detail, the latter being necessary to properly value system flexibility, in CEMs for realistically sized systems. In this work, we extend a particular CEM, NREL's Resource Planning Model (RPM), to address the latter issue by better representing variable generation impacts on operations, and then adding two flexible technologies to RPM's suite of investment decisions: interruptible load and utility-scale storage. This work does not develop full suites of input data for these technologies, but is rather methodological and exploratory in nature. We thus exercise these new investment decisions in the context of exploring price points and value streams needed for significant deployment in the Western Interconnection by 2030. Our study of interruptible load finds significant variation by location, year, and overall system conditions. Some locations find no system need for interruptible load even with low costs, while others build the most expensive resources offered. System needs can include planning reserve capacity needs to ensure resource adequacy, but there are also particular cases in which spinning reserve requirements drive deployment. Utility-scale storage is found to require deep cost reductions to achieve wide deployment and is found to be more valuable in some locations with greater renewable deployment. Differences between more solar- and wind-reliant regions are also found: Storage technologies with lower energy capacities are deployed to support solar deployment, and higher energy capacity technologies support wind. Finally, we identify potential future research and areas of improvement to build on this initial analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improved device measures performance of batteries under load

Kordesch-Marko interrupter bridge circuit includes capability of varying frequency of interruption in steps from 60 Hz to 2000 Hz range extension, and addition of operating modes to allow instrument to serve as steady dc constant-current source or load, or source of interrupted constant current.

Powell, J. D.↗

Examination of time series through randomly broken windows

In order to determine the Fourier transform of a quasi-periodic time series (linear problem), or the power spectrum of a stationary random time series (quadratic problem), data should be recorded without interruption over a long time interval. The effect of regular interruption such as the day/night cycle is well known. The effect of irregular interruption of data collection (the "breaking" of the window function) with the simplifying assumption that there is a uniform probability p that each interval of length tau, of the total interval of length T = N sub tau, yields no data, is investigated. For the linear case it is found that the noise-to-signal ratio will have a (one-sigma) value less than epsilon if N exceeds p(-1)(1-p)epsilon(-2). For the quadratic case, the same requirement is met by the less restrictive requirement that N exceed p(-1)(1-p)epsilon(-1).

Sturrock, P. A.↗

On Why It Is Impossible to Prove that the BDX90 Dispatcher Implements a Time-sharing System

The Software Implemented Fault Tolerance SIFT system, is written in PASCAL except for about a page of machine code. The SIFT system implements a small time sharing system in which PASCAL programs for separate application tasks are executed according to a schedule with real time constraints. The PASCAL language has no provision for handling the notion of an interrupt such as the B930 clock interrupt. The PASCAL language also lacks the notion of running a PASCAL subroutine for a given amount of time, suspending it, saving away the suspension, and later activating the suspension. Machine code was used to overcome these inadequacies of PASCAL. Code which handles clock interrupts and suspends processes is called a dispatcher. The time sharing/virtual machine idea is completely destroyed by the reconfiguration task. After termination of the reconfiguration task, the tasks run by the dispatcher have no relation to those run before reconfiguration. It is impossible to view the dispatcher as a time-sharing system implementing virtual BDX930s running concurrently when one process can wipe out the others.

Boyer, R. S.↗

Evacuated FM08 Fuses Carry a Sustained Arc in a Bus over 75 VDC

The FM08 style fuse is specified to interrupt an overcurrent of up to 300 A in a bus of up to 125 VDC, but this applies only when its barrel is filled with air. When placed into a space-grade vacuum, the FM08 style fuse exhausts its air within a year. Then, the probability of an enduring arc is high for all ratings when the bus is above 75 VDC, and the overcurrent is large. The arc endures until something else interrupts the current. The fuse can violently eject metal vapor or other material during the sustained arcing. The evacuated FM08 does not develop a sustained arc when interrupted in a bus of 38 VDC or less, at least when there is little inductance in the circuit. This is consistent with its successful use in many spacecraft having buses in the range 24 to 36 volts.

Leidecker, Henning↗

Determination of the Solid/Liquid Interface Shape and Resultant Radial Homogeneity in Directionally Solidified Hg(0.89)Mn(0.11)Te

Directional solidification and interrupted directional solidification experiments were used to determine tile shape of the solid/liquid interface and the resultant radial homogeneity in Hg(0.89)Mg(0.11)Te. For directionally solidified samples solidified at a rate of 0.09 microns/sec in a thermal gradient of 83 C/cm, a maximum of 0.006 molar percent MnTe radial variation across the Hg0.89)Mn(0.11)Te boules at specific locations was determined using an FTIR technique. This FTIR evaluation of the radial homogeneity also indicated an asymmetrical, convex interface shape during solidification. The asymmetrical, convex shape of the growth interface was confirmed by interrupted directional solidification experiments. These were performed under the same growth conditions as the normally completed directional solidification experiments except that the samples were quenched before the final growth transient was reached. In these experiments, etching and scanning X-ray fluorescence were used to reveal the shape of the solid/liquid interface. Microprobe analysis of composition gradients across the interface was used to confirm the authors' previous work in evaluating the segregation coefficient of Hg(0.89)Mn(0.11)Te alloy. Microprobe analysis of the interface region of the interrupted growth sample revealed a dendritic structure containing secondary and tertiary dendritic arms.

Price, M. W.↗

Characteristics of Single-Event Upsets in a Fabric Switch (ADS151)

Abstract-Two types of single event effects - bit errors and single event functional interrupts - were observed during heavy-ion testing of the AD8151 crosspoint switch. Bit errors occurred in bursts with the average number of bits in a burst being dependent on both the ion LET and on the data rate. A pulsed laser was used to identify the locations on the chip where the bit errors and single event functional interrupts occurred. Bit errors originated in the switches, drivers, and output buffers. Single event functional interrupts occurred when the laser was focused on the second rank latch containing the data specifying the state of each switch in the 33x17 matrix.

Buchner, Stephen↗

Method of and system for classifying emergency locating transmitters and emergency positions indicating radio beacons

During a distress call, a distress location transmitter 10 generates a high frequency carrier signal 40 that is modulated by a predetermined distress waveform characteristic 29. The classification of user associated with the distress call is identified by periodically interrupting modulation 42; user classification is determined by the repetition rate of the interruptions, the interruption periods, or both.

Wren, Paul E.↗

Event driven executive

Tasks may be planned for execution on a single processor or are split up by the designer for execution among a plurality of signal processors. The tasks are modeled using a design aid called a precedence graph, from which a dependency table and a prerequisite table are established for reference within each processor. During execution, at the completion of a given task, an end of task interrupt is provided from any processor which has completed a task to any and all other processors including itself in which completion of that task is a prerequisite for commencement of any dependent tasks. The relevant updated data may be transferred by the processor either before or after signalling task completion to the processors needing the updated data prior to commencing execution of the dependent tasks. Coherency may be ensured, however, by sending the data before the interrupt. When the end of task interrupt is received in a processor, its dependency table is consulted to determine those tasks dependent upon completion of the task which has just been signalled as completed, and task dependency signals indicative thereof are provided and stored in a current status list of a prerequisite table. The current status of all current prerequisites are compared to the complete prerequisites listed for all affected tasks and those tasks for which the comparison indicates that all prerequisites have been met are queued for execution in a selected order.

Tulpule, Bhalchandra R.↗

Heap/stack guard pages using a wakeup unit

A method and system for providing a memory access check on a processor including the steps of detecting accesses to a memory device including level-1 cache using a wakeup unit. The method includes invalidating level-1 cache ranges corresponding to a guard page, and configuring a plurality of wakeup address compare (WAC) registers to allow access to selected WAC registers. The method selects one of the plurality of WAC registers, and sets up a WAC register related to the guard page. The method configures the wakeup unit to interrupt on access of the selected WAC register. The method detects access of the memory device using the wakeup unit when a guard page is violated. The method generates an interrupt to the core using the wakeup unit, and determines the source of the interrupt. The method detects the activated WAC registers assigned to the violated guard page, and initiates a response.

97 MATHEMATICS AND COMPUTING↗

A Quantitative Assessment of Utility Reporting Practices for Reporting Electric Power Distribution Events

Metrics for reliability, such as the frequency and duration of power interruptions, have been reported by electric utilities for many years. This study examines current utility practices for collecting and reporting electricity reliability information and discusses challenges that arise in assessing reliability because of differences among these practices. The study is based on reliability information for year 2006 reported by 123 utilities in 37 states representing over 60percent of total U.S. electricity sales. We quantify the effects that inconsistencies among current utility reporting practices have on comparisons of System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Index (SAIFI) reported by utilities. We recommend immediate adoption of IEEE Std. 1366-2003 as a consistent method for measuring and reporting reliability statistics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗