Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Reliability, Maintainability, and Availability: Consideration During the Design Phase in Ground Systems to Ensure Successful Launch Support

The future of Space Exploration includes missions to the moon, asteroids, Mars, and beyond. To get there, the mission concept is to launch multiple launch vehicles months, even years apart. In order to achieve this, launch vehicles, payloads (satellites and crew capsules), and ground systems must be highly reliable and/or available, to include maintenance concepts and procedures in the event of a launch scrub. In order to achieve this high probability of mission success, Ground Systems Development and Operations (GSDO) has allocated Reliability, Maintainability, and Availability (RMA) requirements to all hardware and software required for both launch operations and, in the event of a launch scrub, required to support a repair of the ground systems, launch vehicle, or payload. This is done concurrently with the design process (30/60/90 reviews).

Gillespie, Amanda M.↗

Space shuttle: Effect of orbiter/booster proximity interferences on the aerodynamic characteristics of the launch configuration during separation or abort maneuvers, M equals 0.6 - 1.38

The transonic phase of the 0.0088105-scale MSC orbiter booster separation test was conducted in the LTV 4-foot high speed wind tunnel, at Mach numbers of 0.6,0.9, 1.1, and 1.38. The purpose of this test was to define the effects of the orbiter/ booster proximity interference on the aerodynamic characteristics of the launch configuration during separation or abort maneuvers. Each model had both straight and delta wings available for variation of launch vehicle configuration concepts.

Romere, P. R.↗

Overview of C/C-SiC Composite Development for the Orion Launch Abort System

Past and present efforts by the authors to further understanding of the ceramic matrix composite (CMC) material used in the valve components of the Orion Launch Abort System (LAS) Attitude Control Motor (ACM) will be presented. The LAS is designed to quickly lift the Orion Crew Exploration Vehicle (CEV) away from its launch vehicle in emergency abort scenarios. The ACM is a solid rocket motor which utilizes eight throttleable nozzles to maintain proper orientation of the CEV during abort operations. Launch abort systems have not been available for use by NASA on manned launches since the last Apollo ]Saturn launch in 1975. The CMC material, carbon-carbon/silicon-carbide (C/C-SiC), is manufactured by Fiber Materials, Inc. and consists of a rigid 4-directional carbon-fiber tow weave reinforced with a mixed carbon plus SiC matrix. Several valve and full system (8-valve) static motor tests have been conducted by the motor vendor. The culmination of these tests was the successful flight test of the Orion LAS Pad Abort One (PA ]1) vehicle on May 6, 2010. Due to the fast pace of the LAS development program, NASA Marshall Space Flight Center assisted the LAS community by performing a series of material and component evaluations using fired hardware from valve and full ]system development motor tests, and from the PA-1 flight ACM motor. Information will be presented on the structure of the C/C-SiC material, as well as the efficacy of various non ]destructive evaluation (NDE) techniques, including but not limited to: radiography, computed tomography, nanofocus computed tomography, and X-ray transmission microscopy. Examinations of the microstructure of the material via scanning electron microscopy and energy dispersive spectroscopy will also be discussed. The findings resulting from the subject effort are assisting the LAS Project in risk assessments and in possible modifications to the final ACM operational design.

Allen, Lee R.↗

Development of an expert planning system for OSSA

This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

Groundwater, B.↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

Uranus Orbiter and Probe: Mission Challenges and Concept Updates Since the Origins, Worlds, and Life Decadal Survey

Origins, Worlds, and Life: Planetary Science and Astrobiology in the Next Decade identified a Uranus Orbiter and Probe as the highest-priority strategic mission for the decade 2023–2032, as it enables broad cross-disciplinary science in the largely unexplored Uranian system. The mission architecture evaluated by the Decadal Survey was a singular proof of concept demonstrating that a moderately instrumented mission could deliver Decadal-priority science with a reduced cost and risk posture by leveraging existing technologies to the maximum extent possible. With revised assumptions since the Decadal, we have explored a large trade space including launch vehicles, propulsion options, cruise trajectories, available power sources, viable concept of operations, and science data return for later launch dates without a Jupiter gravity assist. The most repeatable trajectory solutions employ either a commercially derived solar electric propulsion (SEP) transfer stage or the availability of a more capable launch vehicle under development, such as the SpaceX Starship. Orbit insertion has been moved farther from Uranus to acknowledge the remaining uncertainty in Uranian ring structure. A streamlined, SEP-adaptable, orbiter design was developed using two Next Gen Radioisotope Thermoelectric Generators, and the probe design was matured, reducing the entry gravitational acceleration, and assuming the largest Decadal-recommended payload to provide margin for future instrument selections. With this updated design, we also constructed a detailed concept of operations for three representative science cases, returning 13–15 Gbit of science data and spacecraft telemetry per ∼34 day orbit.

Amy A Simon↗

Acoustic and Vibration Environment for Crew Launch Vehicle Mobile Launcher

A launch-induced acoustic environment represents a dynamic load on the exposed facilities and ground support equipment (GSE) in the form of random pressures fluctuating around the ambient atmospheric pressure. In response to these fluctuating pressures, structural vibrations are generated and transmitted throughout the structure and to the equipment items supported by the structure. Certain equipment items are also excited by the direct acoustic input as well as by the vibration transmitted through the supporting structure. This paper presents the predicted acoustic and vibration environments induced by the launch of the Crew Launch Vehicle (CLV) from Launch Complex (LC) 39. The predicted acoustic environment depicted in this paper was calculated by scaling the statistically processed measured data available from Saturn V launches to the anticipated environment of the CLV launch. The scaling was accomplished by using the 5-segment Solid Rocket Booster (SRB) engine parameters. Derivation of vibration environment for various Mobile Launcher (ML) structures throughout the base and tower was accomplished by scaling the Saturn V vibration environment.

Vu, Bruce T.↗

Multiphase Simulations of the SLS Launch Environment

NASA’s Space Launch System (SLS), which will send astronauts back to the Moon in the next few years, is powered by four RS-25 engines and two RSRMV solid rocket boosters (SRBs). During launch the SLS propulsion system generates intense acoustics and other powerful waves, such as ignition overpressure (IOP) which, if unmitigated, have the potential to damage the vehicle and possibly cause loss of mission or crew. To protect the vehicle from these powerful waves, the SLS launch pad design includes an ignition overpressure/sound suppression (IOP/SS) system which sprays 270,000 gallons per minute of water very close to the SRB and RS-25 nozzles. The SRB and RS-25 engine plumes, and the proximity of the IOP/SS water, create a complex multiphase (gas and liquid) environment during the SLS ignition sequence. The interplay among these systems creates challenges related to water spray into/onto engine nozzles, potential debris transport, and additional transient loads due to strong plume-water interactions - all of which the SLS vehicle must be able to withstand. Prior to the Artemis I launch, the SLS multiphase liftoff environment was largely unknown due to differences from the Space Shuttle and other programs. Some data was available from tests of individual systems, but no integrated testing or analysis was available. Even post-launch analysis of Artemis I cannot provide a full understanding of the complex physics involved due to limited (or obstructed) camera views and instrumentation. Computational fluid dynamics (CFD) is being used to investigate the details of the multiphase environment which could not be measured, help comprehend the data gathered from the launch, and ultimately identify phenomena that are a concern for future flights. Project Details Engineers at NASA’s Marshall Space Flight Center (MSFC) have executed simulations using the Loci/STREAM-Volume of Fluid (VoF) multiphase CFD solver to understand this environment. Initial efforts successfully validated the CFD solver on various tests, giving confidence to simulate the SLS multiphase liftoff environment prior to the Artemis I launch. The CFD simulation of the SLS ignition sequence was conducted in three phases. First the IOP/SS water system was simulated for approximately 6 seconds to reach a quasi-steady state. Next, the RS-25 engine plumes were activated and held at full power for 1 second. Lastly, the SRB booster was activated and the simulation was carried out until just prior to vehicle motion. This simulation process mimics the conditions that exist at launch. Results and Impact The SLS ignition sequence simulation results provide deep understanding of the underlying physics occuring during launch. Observations from the simulation include reduction of water splashing into/onto the engine nozzles, change in angling of the dense water sheets, and the origin of the powerful ignition overpressure (IOP) wave. These observations directly inform the SLS program on subjects including plume-water induced side loads, debris transport, and the acoustic launch environment. Additionally, with post launch comparison of CFD observations to flight data, these tools can be applied to launch vehicles and environments other than SLS with confidence. Why HPC Matters The SLS ignition sequence CFD simulations are conducted on meshes up to hundreds of millions of cells on thousands of processors for weeks at a time. These simulations generate terabytes of data that must also be stored and archived for future use on HPC systems. Simply put, the CFD simulations would not be possible without NASA HPC resources. What’s Next Comparisons between the Artemis I flight data and the CFD simulations will be continued to both improve confidence in the CFD results and provide deeper understanding into the SLS multiphase launch environment. This will be used to provide insight for decision making for the first manned SLS flight, Artemis II. Future simulations will target new configurations of the SLS IOP/SS water required to support the more powerful variants of the SLS vehicle, such as Block 1B. Additionally, this capability provides NASA the ability to investigate launch environments for vehicles other than SLS to support other missions.

Travis Rivord↗

Nickel-hydrogen CPV battery update

The multicell common pressure vessel (CPV) nickel hydrogen battery manufactured by Johnson Controls Battery Group, Inc. has completed full flight qualification, including random vibration at 19.5 g for two minutes in each axis, electrical characterization in a thermal vacuum chamber, and mass-spectroscopy vessel leak detection. A first launch is scheduled for late in 1992 or early 1993 by the Naval Research Laboratory (NRL). Specifics of the launch date are not available at this time due to the classified nature of the program. Release of orbital data for the battery is anticipated following the launch.

Jones, Kenneth R.↗