Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Design of an optical fiber cable link for lightning instrumentation

A lightning instrumentation system was designed to record current magnitudes of lightning strikes that hit a launch pad service structure at NASA's Kennedy Space Center. The instrumentation system consists of a lightning ground rod with a current sensor coil, an optical transmitter, an optical fiber cable link, a detector receiver, and a recording system. The transmitter is a wideband pulse transformer driving an IR LED emitter. The transmitter operates linearly as a transducer. A low loss fiber bundle provides isolation of the recorder system from the electromagnetic field of the lightning strike. The output of an optical detector receiver module is sampled and recorded in digital format. The significant factors considered in the design were dynamic range, linearity, mechanical configuration, electromagnetic isolation, and temperature compensation.

Grove, C. H.↗

Space science on the Space Shuttle - Plans and prospects

The paper gives an overview of current planning for the use of the Space Shuttle and Spacelab for carrying out NASA's program in Space Science. Attention is given to the major categories of use: (1) as a launch and service vehicle; (2) as an experiment platform for carrying out passive observations; (3) as a component in active and controlled experiments in space; and (4) as a manned orbiting laboratory for carrying out investigations requiring hands-on access to equipment and samples. Examples of each type of use are given. Also discussed are some of the multi-user facility instruments which are planned for early development. Finally, payloads to be carried on the early missions are discussed with particular emphasis on the capabilities of the Shuttle/Spacelab.

Rosendhal, J. F.↗

Space power distribution system technology. Volume 1: Reference EPS design

The multihundred kilowatt electrical power aspects of a mannable space platform in low Earth orbit is analyzed from a cost and technology viewpoint. At the projected orbital altitudes, Shuttle launch and servicing are technically and economically viable. Power generation is specified as photovoltaic consistent with projected planning. The cost models and trades are based upon a zero interest rate (the government taxes concurrently as required), constant dollars (1980), and costs derived in the first half of 1980. Space platform utilization of up to 30 years is evaluated to fully understand the impact of resupply and replacement as satellite missions are extended. Such lifetimes are potentially realizable with Shuttle servicing capability and are economically desirable.

Decker, D. K.↗

Orbiter Processing Overview

Footage of orbiter processing is shown. The Space Shuttle Discovery Landing Operations, Rollback to Orbiter Processing Facility After Landing, Orbiter Processing Facility, Vehicle Assembly Building (VAB), Orbiter Rollover from the Orbiter Processing Facility to the VAB, Atlantis Orbiter Lift and Mate, Atlantis Rollout to Launch Pad 39, Payload Canister Door Opened and Payload Move into Payload Ground Handling Mechanism, Payload into Orbiter, Orbiter Payload Bay Door Closure, Launch Pad Processing at Launch Complex 39, Rotating Service Structure Rollback at Launch Pad, Discovery Lift-off and SRB separation is presented.

Source record↗

Access to Space for Technology Validation Missions: A Practical Guide

Space technology experiments and validation missions share a common dilemma with the aerospace industry in general: the high cost of access to space. Whether the experiment is a so-called university cubesat, a university measurement experiment, or a NASA New Millennium Program (NMP) technology validation mission, the access to space option can be scaled appropriately for the particular constraints. A cubesat might fly as one of a number of cubesats that negotiate a flight on an experimental vehicle. A university experiment might do the same. A NASA flight validation might partner with an Air Force experimental mission.

access to space↗

The Manufacturing Process for the NASA Composite Crew Module Demonstration Structure

This paper will describe the approaches and methods selected in fabrication of a carbon composite demonstration structure for the Composite Crew Module (CCM) Program. The program is managed by the NASA Safety and Engineering Center with participants from ten NASA Centers and AFRL. Multiple aerospace contractors are participating in the design development, tooling and fabrication effort as well. The goal of the program is to develop an agency wide design team for composite habitable spacecraft. The specific goals for this development project are: a).To gain hands on experience in design, building and testing a composite crew module. b) To validate key assumptions by resolving composite spacecraft design details through fabrication and testing of hardware. This abstract is based on Preliminary Design data..The final design will continue to evolve through the fall of 2007 with fabrication mostly completed by conference date. From a structures perspective, the.CCM can be viewed as a pressure module with variable pressure time histories and a series of both impact and quasi-static, high intensity point, line, and area distributed loads. The portion of the overall space vehicle being designed and. fabricated by the CCM team is just the pressure module and primary loading points. The heaviest point loads are applied and distributed to the pressure module at.an aluminum Service Module/Alternate Launch Abort System (SM/ALAS) fittings and at Main and Drogue Chute fittings. Significant line loads with metal to metal impact is applied at.the Lids ring. These major external point and line loads as well as pressure impact loads (blast and water landing) are applied to the lobed floor though the reentry shield and crushable materials. The pressure module is divided into upper and lower. shells that mate together with a bonded belly band splice joint to create the completed structural assembly. The benefits of a split CCM far outweigh the risks of a joint. These benefits include lower tooling cost and less manufacturing risk. Assembly of the top and bottom halves of the pressure shell will allow access to the interior of the shell throughout remaining fabrication sequence and can also potentially permit extensive installation of equipment and .crew facilities prior to final assembly of the two shell halves. A Pi pre-form is a woven carbon composite material which is provided in pre-impregnated form and frozen for long term storage. The cross-section shape allows the top of the pi to be bonded to a flat or curved surface with a second flat plate composite section bonded between two upstanding legs of the Pi. One of the regions relying on the merits of the Pi pre-form is the backbone. All connections among plates of the backbone structure, including the upper flanges, and to the lobe base of the pressure shell are currently joined by Pi pre-forms. The intersection of backbone composite plates is formed by application of two Pi pre-forms, top flanges and lobed surfaces are bonded with one Pi pre-form. The process of applying the pre-impregnated pi-preform will be demonstrated to include important steps like surface preparation, forming, application of pressure dams, vacuum bagging for consolidation, and curing techniques. Chopped carbon fiber tooling was selected over other traditional metallic and carbon fiber tooling. The requirement of schedule and cost economy for a moderate reuse cure tool warranted composite tooling options. Composite tooling schedule duration of 18 weeks compared favorably against other metallic tooling including invar tooling. Composite tooling also shows significant cost savings over low CTE metallic options. The composite tooling options were divided into two groups and the final decision was based on the cost, schedule, tolerance, temperature, and reuse requirements.

Pelham, Larry↗

Creating Processes Associated with Providing Government Goods and Services Under the Commercial Space Launch Act at Kennedy Space Center

Kennedy Space Center (KSC) has decided to write its agreements under the Commercial Space Launch Act (CSLA) authority to cover a broad range of categories of support that KSC could provide to our commercial partner. Our strategy was to go through the onerous process of getting the agreement in place once and allow added specificity and final cost estimates to be documented on a separate Task Order Request (TOR). This paper is written from the implementing engineering team's perspective. It describes how we developed the processes associated with getting Government support to our emerging commercial partners, such as SpaceX and reports on our success to date.

Letchworth, Janet F.↗

Large-Scale Cryogen Systems and Test Facilities

NASA has completed initial construction and verification testing of the Integrated Systems Test Facility (ISTF) Cryogenic Testbed. The ISTF is located at Complex 20 at Cape Canaveral Air Force Station, Florida. The remote and secure location is ideally suited for the following functions: (1) development testing of advanced cryogenic component technologies, (2) development testing of concepts and processes for entire ground support systems designed for servicing large launch vehicles, and (3) commercial sector testing of cryogenic- and energy-related products and systems. The ISTF Cryogenic Testbed consists of modular fluid distribution piping and storage tanks for liquid oxygen/nitrogen (56,000 gal) and liquid hydrogen (66,000 gal). Storage tanks for liquid methane (41,000 gal) and Rocket Propellant 1 (37,000 gal) are also specified for the facility. A state-of-the-art blast proof test command and control center provides capability for remote operation, video surveillance, and data recording for all test areas.

Johnson, R. G.↗

KSC ISS Logistics Support

The presentation contains a status of KSC ISS Logistics Operations. It basically presents current top level ISS Logistics tasks being conducted at KSC, current International Partner activities, hardware processing flow focussing on late Stow operations, list of KSC Logistics POC's, and a backup list of Logistics launch site services. This presentation is being given at the annual International Space Station (ISS) Multi-lateral Logistics Maintenance Control Panel meeting to be held in Turin, Italy during the week of May 13-16. The presentatiuon content doesn't contain any potential lessons learned.

ISS↗

Rocket Propulsion (RP) 21 Steering Committee Meeting - NASA Spacecraft Propulsion Update

Lander Tech is three separate but synergistic efforts: Lunar CATALYST (Lunar Cargo Transportation and Landing by Soft Touchdown) Support U.S. industry led robotic lunar lander development via three public-private efforts. Support U.S. industry led robotic lunar lander development via three public-private partnerships. Infuse or transfer landing technologies into these public private partnerships. Advanced Exploration Systems-Automated Propellant Loading (APL) -Integrated Ground Operations. Demonstrate LH2 zero loss storage, loading and transfer operations via testing on a large scale in a relevant launch vehicle servicing environment. (KSC, GRC). Game Changing Technology-20 Kelvin -20 Watt Cryocooler Development of a Reverse Turbo-Brayton Cryocooler operating at 20 Kelvin with 20 Watts of refrigeration lift.

Propellant↗

NASA Support for Commercial Crew Launch Capabilities

Since the earliest days of U.S. human spaceflight, NASA’s Marshall Space Flight Center in Huntsville, Alabama, has played a key role in American crew launch capability, from engineering support for the first Mercury-Redstone launches, to the Saturn launches to the Moon, through Shuttle and now Artemis. Today, Marshall brings that expertise gained through decades of crewed space launches to NASA’s Commercial Crew Program (CCP), providing launch vehicle engineering and programmatic support. The team’s responsibilities have included human certification of commercial launch systems for the CCP missions, including Atlas V and Falcon 9, and verifying each launch vehicle complies with flight certification. MSFC provides expertise in nearly all aspects of launch vehicle design and performance including solid motors and liquid engines, stage propulsion, thrust vector control, structural and dynamics, safety and mission assurance. During each commercial crew launch, an engineering support team is on console at Marshall’s Huntsville Operations Support Center, which has provided launch operations support since Apollo, providing real-time oversight to safety standards for the vehicle and verifying data. Launch vehicle support for Commercial Crew has come as a paradigm shift for the MSFC team, inspiring new approaches that leverage expertise and best practices from past NASA-developed launch vehicle missions, while at the same time providing new synergies from work with commercial partners on CCP. This paper will explore the role that the Marshall launch vehicle services team plays in the Commercial Crew Program, as well as lessons learned from the program that will continue to benefit a new era of spaceflight partnerships.

Commercial Crew↗

Commercial ELV services and the National Aeronautics and Space Administration - Concord or discord?

In implementation of the U.S. policy to foster and encourage the commercial expendable launch vehicle (ELV) industry, tensions have developed between the industry and U.S. Government agencies in two distinct areas: industry use of government facilities and government purchase of commercial ELV services. The reasons for the tensions and discrete legal problems for each area are identified and discussed. Specifically, in the use of government facilities area, issues of insurance and indemnification for third-party liability and government property, concerns over priority and scheduling, and dispute-resolution procedures are discussed. In the area of government purchase of ELV launch services, a comparison is made between a launch service purchase and prior procurement practice. In all areas, the conclusion is reached that while problems still exist, they generally are understood and great progress has been made toward their resolution.

Frankle, Edward A.↗

Space Ops 2002: Bringing Space Operations into the 21st Century. Track 3: Operations, Mission Planning and Control. 2nd Generation Reusable Launch Vehicle-Concepts for Flight Operations

With the successful implementation of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) enters a new era of opportunity for scientific research. The ISS provides a working laboratory in space, with tremendous capabilities for scientific research. Utilization of these capabilities requires a launch system capable of routinely transporting crew and logistics to/from the ISS, as well as supporting ISS assembly and maintenance tasks. The Space Shuttle serves as NASA's launch system for performing these functions. The Space Shuttle also serves as NASA's launch system for supporting other science and servicing missions that require a human presence in space. The Space Shuttle provides proof that reusable launch vehicles are technically and physically implementable. However, a couple of problems faced by NASA are the prohibitive cost of operating and maintaining the Space Shuttle and its relative inability to support high launch rates. The 2nd Generation Reusable Launch Vehicle (2nd Gen RLV) is NASA's solution to this problem. The 2nd Gen RLV will provide a robust launch system with increased safety, improved reliability and performance, and less cost. The improved performance and reduced costs of the 2nd Gen RLV will free up resources currently spent on launch services. These resource savings can then be applied to scientific research, which in turn can be supported by the higher launch rate capability of the 2nd Gen RLV. The result is a win - win situation for science and NASA. While meeting NASA's needs, the 2nd Gen RLV also provides the United States aerospace industry with a commercially viable launch capability. One of the keys to achieving the goals of the 2nd Gen RLV is to develop and implement new technologies and processes in the area of flight operations. NASA's experience in operating the Space Shuttle and the ISS has brought to light several areas where automation can be used to augment or eliminate functions performed by crew and ground controllers. This experience has also identified the need for new approaches to staffing and training for both crew and ground controllers. This paper provides a brief overview of the mission capabilities provided by the 2nd Gen RLV, a description of NASA's approach to developing the 2nd Gen RLV, a discussion of operations concepts, and a list of challenges to implementing those concepts.

Hagopian, Jeff↗

Flight support system mechanisms

The Flight Support System (FSS) which contains twelve mechanisms (six different types) which are used for retention and positioning of a Multimission Modular Spacecraft (MMS) within the Space Shuttle's cargo bay during launch, retrieval, and servicing missions is described. Retention latches were designed to provide the capability for structural support of the MMS during launch and retrieval, and during servicing operations the mechanisms on the Positioning Platform provide the capability for positioning the MMS in virtually any orientation necessary for the work to be performed. In addition, there are mechanisms for matching and demating umbilical connectors and a mechanism for locking the Positioning Platform during maneuvers. Each Mechanism is driven by a Common Drive Unit. Manual overrides were provided for those mechanisms that would present a safety hazard for the crew, if they should fail.

Source record↗

The Wallops Flight Facility Model for an Integrated Federal/Commercial Launch Range

Historically, the federal government has been the predominant purchaser of space launches in the United States. The government met its needs through purchase of hardware and services. It also provided the infrastructure necessary to conduct launch operations through federal launch ranges, both military and NASA. Under this model, the government had the complete ownership, responsibility, liability, and expense for launch activities. As the commercial space sector grew, there emerged a corresponding growth in demand for launch range services. However, the expense and complexity of activities has thus far deterred a rapid rise in the establishment of purely commercial launch sites. In this context, purely commercial is defined as "without benefit of capabilities provided by the federal government." Consistent with the Commercial Space Launch Act, in recent years NASA and the Air Force have supported commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. In this mode the commercial launch service providers contract with the government to provide services including use of facilities, tracking and data services, and range safety. As the commercial market projections began to show significant opportunities for economic development, several states established spaceports to provide the services necessary to meet these projected commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC) at the Wallops Flight Facility. Under this arrangement, NASA agreed to allow Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide services in accordance with the Space Act of 1958 and the Commercial Space Launch Act of 1984 (as amended) to support VSFC launch customers. The relationship between NASA and VCSFA, however, has evolved beyond a customer supplier relationship. A partnership relationship has emerged which pairs the strengths of the established NASA test range and the state-sponsored, commercial launch facility provider, in an attempt to satisfy the needs for flexible, low-cost access to space. Furthermore, the future of the NASA/Wallops Test Range is closely linked with the success of VCSFA in promoting commercial launches from Wallops. This paper will describe the changing paradigm of the federal launch range and the unique aspects of the NASA/Wallops Facility relationship with VCSFA. Discussion will include institutional cost-sharing, business development and marketing, joint educational programs, and strategic planning.

Underwood, Bruce E.↗

Design and Development of the Space Shuttle Tail Service Masts

The successful launch of a space shuttle vehicle depends on the proper operation of two tail service masts (TSMs). Reliable TSM operation is assured through a comprehensive design, development, and testing program. The results of the concept verification test (CVT) and the resulting impact on prototype TSM design are presented. The design criteria are outlined, and the proposed prototype TSM tests are described.

Dandage, S. R.↗