Design of the VISITOR Tool: A Versatile ImpulSive Interplanetary Trajectory OptimizeR

The design of trajectories for interplanetary missions represents one of the most complex and important problems to solve during conceptual space mission design. To facilitate conceptual mission sizing activities, it is essential to obtain sufficiently accurate trajectories in a fast and repeatable manner. To this end, the VISITOR tool was developed. This tool modularly augments a patched conic MGA-1DSM model with a mass model, launch window analysis, and the ability to simulate more realistic arrival and departure operations. This was implemented in MATLAB, exploiting the built-in optimization tools and vector analysis routines. The chosen optimization strategy uses a grid search and pattern search, an iterative variable grid method. A genetic algorithm can be selectively used to improve search space pruning, at the cost of losing the repeatability of the results and increased computation time. The tool was validated against seven flown missions: the average total mission (Delta)V offset from the nominal trajectory was 9.1%, which was reduced to 7.3% when using the genetic algorithm at the cost of an increase in computation time by a factor 5.7. It was found that VISITOR was well-suited for the conceptual design of interplanetary trajectories, while also facilitating future improvements due to its modular structure.

Corpaccioli, Luca↗

Spacecraft Power Source Installation at Launch Complex

For certain space missions, an assembly must be integrated onto the spacecraft as late as possible in the launch vehicle processing flow. 12This late integration can be driven for a variety of reasons including thermal or hazardous materials constraints. This paper discusses the process of integrating an assembly onto a spacecraft as late as one week prior to the opening of the launch window. Consideration is given to achieving sufficient access for hardware integration, methods of remotely securing hardware to the spacecraft, maintaining spacecraft cleanliness throughout the integration process, and electrically integrating the component to the spacecraft. Specific examples are taken from the remote mechanical, electrical, and fluid cooling system integration of the power source onto the Mars Science Laboratory (MSL) Rover at the Atlas V Vertical Integration Facility (VIF) at Cape Canaveral Air Force Station, Florida.

Lytal, Paul↗

Evolution of Orion Mission Design for Exploration Mission 1 and 2

The evolving mission design and concepts of NASA's next steps have shaped Orion into the spacecraft that it is today. Since the initial inception of Orion, through the Constellation Program, and now in the Exploration Mission frame-work with the Space Launch System (SLS), each mission design concept and program goal have left Orion with a set of capabilities that can be utilized in many different mission types. Exploration Missions 1 and 2 (EM-1 and EM-2) have now been at the forefront of the mission design focus for the last several years. During that time, different Design Reference Missions (DRMs) were built, analyzed, and modified to solve or mitigate enterprise level design trades to ensure a viable mission from launch to landing. The resulting DRMs for EM-1 and EM-2 were then expanded into multi-year trajectory scans to characterize vehicle performance and Earth-Moon geometry trends. This provides Orion's subsystems with stressing reference trajectories to help design their system. Now that Orion has progressed through the Preliminary and Critical Design Re-views (PDR and CDR) there is a general shift in the focus of mission design from aiding the vehicle design to providing mission specific products needed for pre-flight and real time operations. Some of the mission specific products need-ed include analysis of steering law performance, inputs into navigational accura-cy assessments, abort options at any point in the mission for each valid trajecto-ry in the launch window, recontact avoidance between the upper stage and Orion post nominal separation, etc.

Gutkowski, Jeffrey P.↗

Evolution of Orion Mission Design for Exploration Mission 1 and 2

The evolving mission design and concepts of NASA’s next steps have shaped Orion into the spacecraft that it is today. Since the initial inception of Orion, through the Constellation Program, and now in the Exploration Mission frame-work with the Space Launch System (SLS), each mission design concept and pro-gram goal have left Orion with a set of capabilities that can be utilized in many different mission types. Exploration Missions 1 and 2 (EM-1 and EM-2) have now been at the forefront of the mission design focus for the last several years. During that time, different Design Reference Missions (DRMs) were built, analyzed, and modified to solve or mitigate enterprise level design trades to ensure a viable mission from launch to landing. The resulting DRMs for EM-1 and EM-2 were then expanded into multi-year trajectory scans to characterize vehicle performance as affected by variations in Earth-Moon geometry. This provides Orion’s subsystems with stressing reference trajectories to help design their system. Now that Orion has progressed through the Preliminary and Critical Design Reviews (PDR and CDR), there is a general shift in the focus of mission design from aiding the vehicle design to providing mission specific products needed for pre-flight and real time operations. Some of the mission specific products needed include, large quantities of nominal trajectories for multiple monthly launch periods and abort options at any point in the mission for each valid trajectory in the launch window.

Gutkowski, Jeffrey P.↗

Investigation on Improvements in Lightning Retest Criteria for Spacecraft

Spacecraft are generally protected from a direct strike by launch the vehicle and ground structures, but protocols to evaluate the impact of nearby strikes are not consistent. Often spacecraft rely on the launch vehicle constraints to trigger a retest, but launch vehicles can typically evaluate the impact of a strike within minutes while spacecraft evaluation times can be on the order of hours or even days. For launches at the Kennedy Space Center where lightning activity is among the highest in the United States, this evaluation related delay could be costly with the possibility of missing the launch window altogether. This paper evaluated available data from local lightning measurements systems and computer simulations to predict the coupled effect from various nearby strikes onto a typical payload umbilical. Recommendations are provided to reduce the typical trigger criteria and costly delays.

Models↗

SEP Mission Design Space for Mars Orbiters

The advancement of solar-electric propulsion (SEP) technologies and larger, light-weight solar arrays offer a tremendous advantage to Mars orbiters in terms of both mass and timeline flexibility. These advantages are multiplied for round-trip orbiters (e.g. potential Mars sample return) where a large total Delta V would be required. In this paper we investigate the mission design characteristics of mission concepts utilizing various combinations and types of SEP thrusters, solar arrays, launch vehicles, launch dates, arrival dates, etc. SEP allows for greater than 50% more mass delivered and launch windows of months to years. We also present the SEP analog to the ballistic Porkchop plot - the "Bacon" plot.

Woolley, Ryan C.↗

Solar Sail Propulsion for Interplanetary Small Spacecraft

NASA is developing solar sail propulsion for use by small robotic interplanetary spacecraft. Solar sails use sunlight to derive useful thrust by reflecting solar photons from a large, mirror-like sail made of a lightweight, highly reflective material. Using reflected sunlight to obtain thrust instead of relying on the use of reaction mass has many advantages for exploring the inner solar system, including extremely large total delta V (velocity difference) and significant launch window flexibility.

Asteroid↗

Libration Orbit Eclipse Avoidance Maneuver Study for the James Webb Space Telescope Mission

Mission analysis of libration orbit trajectories at Sun-Earth/Moon L2 typically includes predictions of lunar and Earth eclipses during the mission life-time. The NASA James Webb Space Telescope (JWST) trajectory, by design, avoids these eclipses by pruning its launch window. In an off-nominal scenario where an eclipse is predicted, a maneuver strategy is needed. In this paper, trade studies are examined for JWST that characterize the burn magnitude, location, and epochs of multiple maneuver plans to avoid an eclipse. The results enable analysts to explore the space of feasible maneuver strategies during routine operations.

Maneuver design↗

Operational Techniques for Dealing with Long Eclipses During the MMS Extended Mission

Launch window design for the Magnetospheric Multiscale (MMS) mission ensured that no excessive eclipses would be encountered during the prime mission. However, no orbit solutions exist that satisfy the eclipse constraints indefinitely: most extended mission years contain 1-3 eclipses long enough to potentially damage either the spacecraft or its scientific instruments. Two steps were taken to improve the situation. Firstly, raising apogee radius from 25 to 29.34 Earth radii altered the Sun-Earth-MMS phasing, so efficiently achieving reductions in the long eclipse durations. These maneuvers were performed early this year, in preparation for the first pair of long eclipses in August 2019. Secondly, a set of operational steps were taken around the time of the eclipses to help maintain spacecraft and instrument temperatures while preventing power load shedding. These operational steps included raising key onboard temperatures through adjusting the spacecraft attitude to tilt the instrument deck towards the Sun, and engaging select heaters prior to going into eclipses. In addition, all scientific instruments were turned off, as well as high-power, non-critical spacecraft systems, to conserve energy.These steps each came with trade-offs which will be discussed in the paper. Finally, the results that were obtained when the spacecraft experienced the first extremely long eclipses will be discussed, as will lessons learned for future long eclipses.

Williams, Trevor↗

Artemis I Trajectory Design and Optimization

This paper presents the overall trajectory design and optimization process for NASA’s Artemis I mission to send an uncrewed Orion vehicle to a lunar Distant Retrograde Orbit (DRO). The on-orbit trajectory begins at the Space Launch System (SLS) core separation and ends at the Orion service module Earth Entry Interface (EI) point. The details of the trajectory optimization process are presented, including design of nominal and extended mission options, launch windows, and abort options. Novel design techniques are also discussed to account for contingencies, such as using auxiliary thrusters to protect against main engine failure and applying trajectory shaping to mitigate or reduce eclipse durations.

Artemis I↗

Hybrid NEP-Chemical Vehicle and Propulsion Technology Study for Crewed Mars Missions

Nuclear Electric Propulsion (NEP) is a suite of technologies with the potential to enable crewed opposition-class missions to Mars. Each subsystem comprising an NEP system has multiple technology options that present tradeoffs in vehicle sizing and technology development risk. Multiple vehicle concepts have been studied in the past and are currently being studied at NASA. Three models have been developed to illustrate the impact of key technology parameters on overall sizing for a crewed Mars transportation vehicle. Vehicle mass required to close the mission as a function of NEP system alpha (kWe/kg) and specific impulse (Isp) is estimated with a detailed trajectory model. A power system mass model estimates alpha as a function of power and radiator mass assumption. A power conversion system thermodynamic model predicts the radiator area required to close a Brayton cycle power conversion system. Combined with the architecture mass required for mission closure, the radiator area and alpha model provide insight into how technology development may impact the mission. Our focus is on parametric sweeps of the whole design space rather than any particular point design. Results from the mission model comparing electric propulsion technology (Hall, Ion, Magnetoplasmadynamic) and both 2039 and 2042 opposition-class mission launch windows are included. The results of the study illustrate the technology parameters that can result in mission closure and illustrate where the architecture is sensitive to variations in technology performance or requirements.

Matthew Duchek↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover Final Submission

NASA's Mars 2020 Perseverance Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions to Mars. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality: seven new and/or upgraded scientific payloads, an upgraded arm and sampling system, and a Helicopter demonstration. These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagn

Gonzales, Edward C↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover

NASA's Mars 2020 Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality. The scientific payload includes a trio of chemical analysis tools (PIXL, SHERLOC, SuperCam), a ground penetrating radar (RIMFAX), an upgraded weather station (MEDA), upgraded high resolution camera (MastCam-Z), and an oxygen-producing experiment (MOXIE). These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft has successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagnetic interference in all mission phases.

Gonzales, Edward C↗

Artemis I Countdown 101

Before the Artemis I mission launches on its way around the Moon, the launch team at Kennedy Space Center and supporting teams across the country will begin the launch countdown about two days before liftoff. The launch countdown contains "L Minus” and "T Minus" times. "L minus" indicates how far away we are from liftoff in hours and minutes and does not include built-in holds. “T minus” time is a sequence of events that are built into the launch countdown where counting and holds are inserted. The 730,000 gallons of propellants that will be loaded into the rocket are liquid oxygen (LO2) and liquid hydrogen (LH2). Pauses in the countdown, or "holds," are built into the countdown to allow the launch team to target a precise launch window, and to provide a cushion of time for certain tasks and procedures without impacting the overall schedule. For the Artemis I countdown, planned built-in holds vary in length and occur at the following times: L-8 hours, 40 minutes, and L-40 minutes.

Madison Elizabeth Tuttle↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Space Operations↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Karen Richon↗

Artemis 1 Recovery and Post-Flight Evaluations

The Artemis I launch window opens Aug. 29, with a scheduled splashdown off the coast of San Diego in early October. Jeremy will describe the at-sea recovery method and the immediate inspections that will take place to evaluate the performance of Orion’s heat shield or thermal protection system.

Jeremy Vander Kam↗