Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission operations system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Microcontroller-based aerosol jet printer control software

This software is used with a microcontroller to control an aerosol jet printing system. It was written for a 32-bit ARM microcontroller, providing greater processing speed and complexity relative to more conventional low-cost printer controllers. The microcontroller software was written using a real-time operating system (FreeRTOS), which simplifies parallel operation of multiple functions and further customization. It supports simultaneous motion planning, pulse generation for stepper motors, reading encoder feedback, communicating with multiple mass flow controllers, controlling solid state relays, handling a software-based emergency stop, and sending data to the client PC. The program is written in C and communicates with the client PC via USB connection. Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-0436 O

Secor, EthanBenjamin↗

Weapon Material Program: FY24 Annual Report

The Weapon Material Program (WMP) framework was started in July of Fiscal Year (FY) 2022, along with other Mission Support organizations. The first year was about building the organization with the right people, identifying needs, and developing a vision for expectations. It was also a year to move forward with new equipment and technology for weapon material processes. With numerous improvements, WMP is building world-class systems for production, warehousing, and analytical testing. FY 2023 was a year of development. The WMP was a new organization defining its identity, its focus, and its mission. At the end of FY 2023, WMP evaluated its current position and its immediate needs along with its future goals. The entire organization set out on this FY 2024 journey to success. The lack of funding, staffing, and visibility dramatically impacted weapon material operations, testing, and qualifications. This neglect required numerous areas to be addressed and improvement plans to be developed and implemented. WMP processes, procedures, and overall business operations were dramatically in need of updating, revision, and formal documentation. This included all areas: technology, equipment, facility modifications/upgrades, and testing improvements. To ensure organizational improvement and forward momentum in FY 2024, WMP executed a multi-faceted strategic vision. Action items included the following: • Filling open positions with capable personnel who would contribute to a more robust organization • Establishing more formal operations and problem-solving techniques • Improving departmental procedures to align with expanding scope • Improving training • Establishing collaboration meetings with other departments/organizations • Focusing on the importance of identifying and mitigating concerns with At-Risk Materials (@RM) • Leading modernization eff orts for Blending and Packaging (B&P) We are on the verge of a transformational improvement in all of our processes in support of the mission. The following area achievements outlined in this report reflect the hard work toward achieving the goal of “being the material Subject Matter Experts in the nuclear enterprise”.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A Multi-Sensor Unoccupied Aerial System Improves Characterization of Vegetation Composition and Canopy Properties in the Arctic Tundra: Supporting Data

Remote sensing data collected from Brookhaven National Laboratory's (BNL) heavy-lift unoccupied aerial system (UAS) octocopter platform - the Osprey - operated by the Terrestrial Ecosystem Science and Technology (TEST) group. Data was collected from a single flight over the Kougarok hillslope site on 26 July, 2018. The Osprey is a multi-sensor UAS platform that simultaneously measures very high spatial resolution optical red/green/blue (RGB) and thermal infrared (TIR) surface "skin" temperature imagery, as well as surface reflectance at 1nm intervals in the visible to near-infrared spectral range from ~350-1000 nm measured at regular intervals along each flight path. Derived image products include ortho-mosaiced RGB and TIR images, an RGB-based digital surface model (DSM) using the structure from motion (SfM) technique, digital terrain model (DTM), and a canopy height model. Ancillary aircraft data, flight mission parameters, and general flight conditions are also included. This dataset includes *.pdf, *.txt, *.tif, *.dat, and *.csv with most zipped in *.tar.gz files. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UAS remote sensing (Osprey platform): Red-green-blue (RGB) imagery, thermal infrared (TIR) imagery, and canopy reflectance, Seward Peninsula, Alaska, 2019

Airborne remote sensing data collected using the Brookhaven National Laboratory's (BNL) heavy-lift unoccupied aerial system (UAS) octocopter platform - the Osprey - operated by the Terrestrial Ecosystem Science and Technology (TEST) group (https://www.bnl.gov/testgroup). This package includes data from 17 flights flown over the NGEE-Arctic Council Mile Maker 64 (MM64) and Teller MM27 sites in July, 2019. The Osprey is a multi-sensor UAS platform that simultaneously measures very high spatial resolution optical red/green/blue (RGB) and thermal infrared (TIR) surface "skin" temperature imagery, as well as surface reflectance at 1 nm intervals in the visible to near-infrared spectral range from ~350-1000 nm measured at regular intervals along each flight path. This package provide the Level 0 (raw, unprocessed) data collected by the Osprey platform. Ancillary aircraft data, flight mission parameters, and general flight conditions provided by the onboard flight and data collection computers are also included. Data and metadata are provided as text (*.txt, *.json), tabular (*.dat, *.csv, *.waypoint), and image (*.jpg) formats. This metadata document contains flight campaign, instrument and file metadata, along with a description of the L0 data, and file naming scheme. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

UAS remote sensing (Osprey platform): Red-green-blue (RGB) imagery, thermal infrared (TIR) imagery, and canopy reflectance, Seward Peninsula, Alaska, 2018

Airborne remote sensing data collected using the Brookhaven National Laboratory's (BNL) heavy-lift unoccupied aerial system (UAS) octocopter platform - the Osprey - operated by the Terrestrial Ecosystem Science and Technology (TEST) group. This package includes data from 34 flights flown over the NGEE-Arctic Council Mile Maker 72 (MM72), Kougarok MM64, Kougarok MM80, and Teller MM27 sites in July, 2018. The Osprey is a multi-sensor UAS platform that simultaneously measures very high spatial resolution optical red/green/blue (RGB) and thermal infrared (TIR) surface "skin" temperature imagery, as well as surface reflectance at 1 nm intervals in the visible to near-infrared spectral range from ~350-1000 nm measured at regular intervals along each flight path. This package provide the Level 0 (raw, unprocessed) data collected by the Osprey platform. Ancillary aircraft data, flight mission parameters, and general flight conditions provided by the onboard flight and data collection computers are also included. Data and metadata are provided as text (*.txt, *.json), tabular (*.dat, *.csv, *.waypoint), and image (*.jpg) formats. This metadata document contains flight campaign, instrument and file metadata, along with a description of the L0 data, and file naming scheme. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

L0 Data from the 2018 NGEE Arctic LiDAR and Imagery Unoccupied Aerial System Campaign at the Teller 27 Field Site, Seward Peninsula, Alaska

Airborne remote sensing data collected from Los Alamos National Laboratory's (LANL) heavy-lift unoccupied aerial system (UAS) hexacopter platform operated by NGEE Arctic scientists from the EES-14 group at Los Alamos National Laboratory. These data were collected in July 2018 at a field site near mile marker 27 along the Teller road between Nome, Alaska and Teller, Alaska. A DJI Matrice 600 Pro Airframe and Routescene UAV LiDARSystem was used to collect LiDAR data along 12 flight paths, and DJI Phantom 4 Advanced was used to collect optical red/green/blue (RGB) imagery at regular intervals along 5 flight paths. This data package contains unprocessed data products (processing level 0) including flight paths, raw photos, and raw lidar data files (*.kml, *.jpg, and *.lpd formats). Ancillary aircraft data, flight mission parameters, and general flight conditions are also included (see Supplemental Files, *.rinex, and *.rtcm3 files). NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research.- The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Pre- and post-launch operation of the Resolve soft X-ray spectrometer onboard the XRISM satellite

Resolve is a high-resolution X-ray spectrometer onboard the X-Ray Imaging and Spectroscopy Mission (XRISM), launched on September 6 (UT), 2023. The Resolve has performed better than its required spectral resolution (7 eV at full width at half maximum at 6 keV), both on the ground and in orbit, and has been confirmed to have comparable performance to the soft X-ray spectrometer onboard the ASTRO-H (Hitomi) satellite. The focal plane is composed of an array of microcalorimeter detectors operated at 50 mK to achieve the required energy resolution, and the cooling system is designed to satisfy the lifetime requirement of over 3 years. The focal plane and cooling system are contained in a vacuum-insulated dewar. The cooling system is equipped with a two-stage adiabatic demagnetization refrigerator (ADR) that uses superfluid liquid helium (LHe) as its heat sink. The system includes a third ADR stage that can be used to provide the heat sink when the helium is exhausted. A Joule–Thomson cooler and several two-stage Stirling coolers are used to reduce the heat load on the LHe. During pre-launch operations, we carried out a superfluid LHe top-off operation. The resultant amount of LHe onboard Resolve was over 35 L before launch, which is sufficient to meet the lifetime requirement. During post-launch operation, the LHe vent valve was opened 5 min after launch during rocket acceleration, and the cryocoolers were turned on after several orbits, as planned, which established stable cooling within the dewar. Pre- and post-launch operations for the Resolve instrument were planned around multiple constraints from launch vehicle operations; all were successfully completed, and the launch requirements were fully met.

X-Ray Imaging and Spectroscopy Mission↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Reactive Power on Photovoltaic Inverter Reliability and Lifetime

This paper performs research on predicting Photovoltaic (PV) inverters reliability and lifetime based on thermal cycling. Thermal cycling is considered the most important stressors in an inverter system. In order to achieve this, a detailed electro-thermal model of the PV inverter will be developed along with their controllers capable of providing voltage support through reactive power. An in-house inverter was built, and a PV inverter model was developed to match the physical inverter. The PV inverter electrothermal model was validated for different ambient temperatures to match the in-house inverter hardware. The in-house inverter was placed inside a thermal chamber to emulate different ambient temperatures and their losses and temperature rises within the system were measured. After the validation of the model, a reduced order model of the inverter will be implemented to translate the mission profile of ambient temperature and solar irradiance into load profile of junction temperatures of the switches. The junction temperature data will be used to identify the reliability indices and hence predict the useful lifetime of the inverter system. Along with the model to predict useful lifetime of the system, the impact of reactive power on the overall reliability of the system will be studied. The key observation in this paper shows that lifetime of the inverter decreases as the operating power factor moves away from unity.

14 SOLAR ENERGY↗

Position Papers for the ASCR Workshop on Cybersecurity and Privacy for Scientific Computing Ecosystems

At the request of the Department of Energy's (DOE) Office of Advanced Scientific Computing Research (ASCR), this program committee has been tasked with organizing a workshop to identify basic research needs in cybersecurity and privacy to better support DOE's science and energy mission. As part of the process, the program committee is soliciting community input in the form of position papers to help identify significant use cases, facility issues, and other barriers to enabling verifiably trustworthy computational science while preserving data confidentiality as appropriate for scientific workflows of interest to DOE. The program committee will review these position papers and based on the fit of their area of expertise and interest, selected contributors will have the opportunity to participate in the workshop currently planned as a virtual event November 3-5th, 2021. The thrust areas that will be explored by this workshop are the following: (1) Algorithms for secure, scalable, privacy-enhancing technologies and frameworks, including: Federated AI/ML, Differential privacy, Randomized algorithms, Adversarial modeling & simulation, Graph algorithms, and Formal methods; (2) Platforms to support the entire scientific-computing ecosystem, including edge computing for large-scale experiments, focusing on heterogeneous systems and distributed systems, including: Heterogeneous computing systems, Distributed computing systems, and Secure data architectures; and (3) Data workflows to allow agile use of data while preserving integrity and privacy, making the important properties verifiable either at runtime or post-computation, including: Integrity and provenance and Data management infrastructure. Topics that are out-of-scope for the workshop include discussing specific proposed solutions or areas that are clearly out of DOE's fundamental and applied-sciences mission scope, e.g., cryptography, enterprise security, and general-operations technology.

97 MATHEMATICS AND COMPUTING↗

UAS remote sensing (Osprey platform): Red-green-blue (RGB) imagery, thermal infrared (TIR) imagery, and canopy reflectance, Seward Peninsula, Alaska, 2017

Airborne remote sensing data collected using the Brookhaven National Laboratory's (BNL) heavy-lift unoccupied aerial system (UAS) octocopter platform - the Osprey - operated by the Terrestrial Ecosystem Science and Technology (TEST) group (https://www.bnl.gov/testgroup). This package includes raw (L0) data from 14 flights flown over the NGEE-Arctic Council Mile Marker 71 (MM71), Kougarok MM64, and Teller MM 27 sites in August, 2017. The Osprey is a multi-sensor UAS platform that simultaneously measures very high spatial resolution optical red/green/blue (RGB) and thermal infrared (TIR) surface "skin" temperature imagery, as well as near-surface surface reflectance at 1 nm intervals in the visible to near-infrared spectral range from ~350-1000 nm measured at regular intervals along each flight path. This package provides the Level 0 (raw, unprocessed) data collected by the Osprey platform. Ancillary aircraft data, flight mission parameters, and general flight conditions provided by the onboard flight and data collection computers are also included. Data and metadata are provided as text (*.txt, *.json), tabular (*.dat, *.csv, *.waypoint), and image (*.jpg) formats. This metadata documents contain flight campaign, platform, sensor, flight and file metadata, along with a description of the L0 data and the file naming scheme. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a 15-year research effort (2012-2027) to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Deployable Wind-Hybrid Power Systems for Defense and Disaster Response Applications

This report presents an analysis of the performance of deployable energy systems comprised of wind energy systems integrated with diesel generators, photovoltaic systems, and battery storage to meet the load requirements of a representative U.S. Army forward operating base. The analysis is conducted using HOMER, a microgrid analysis software that can search through a wide range of parameters to design and optimize microgrid power systems. The search parameters include the system architecture, the wind and solar resources, and the availability of diesel fuel. The results of the analysis measure the relative performance of the different systems and environments in terms of the overall transportation cost to deploy the system and the ability to provide resilience in terms of meeting mission critical loads.

02 PETROLEUM↗

Advances in prediction of tokamak experiments with theory-based models

The successful validation of theory-based models of transport, MHD stability, heating and current drive, with tokamak measurements over the last 20 years, has laid the foundation for a new era where these models can be routinely used in a "predict first" approach to design and predict the outcomes of experiments on tokamaks today. The capability to predict the plasma confinement and core profiles with a quantified uncertainty, based on a multi-machine, international, database of experience, will provide confidence that a proposed discharge will remain within the operational limits of the tokamak. Developing this predictive capability for the first generation of burning plasma devices, beginning with ITER, and progressing to tokamak demonstration reactors, is a critical mission of fusion energy research. Major advances have been made implementing this predict first methodology on today's tokamaks. In this work, an overview of several of these recent advances will be presented, providing the integrated modeling foundations of the experimental successes. The first steps to include boundary plasmas, and tokamak control systems, have been made. A commitment to predicting experiments as part of the planning process is needed in order to collect predictive accuracy data and evolve the models and software into a robust whole discharge pulse design simulator.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗