Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Lessons Learned in Systems Engineering Availability and Recommendations for Mission Technical Leaders

In spaceflight missions at Goddard Space Flight Center (GSFC), the Mission System Engineer (MSE) is the technical leader of the overall engineering team and also is the Independent Engineering Technical Authority. The responsibility of this role includes the definition of the mission design architecture, concept of operations, and mission requirements, management of risk throughout the development, and verification and validation of the final system performance and function amongst other duties. This responsibility inherently requires time management, enabling focus on a balanced development with appropriate risk. Time is the most valuable resource of the MSE. The system engineer’s availability to interact with the development team (often product or component design leads and technicians, often in different worksites) to discover and mitigate mission risks during development is key to mission success. This paper presents examples from Lunar Reconnaissance Orbiter, Landsat 9, and Neutron star Interior Composition ExploreR (NICER) which represent in-house and out-of-house hardware builds. These examples demonstrate how interactions between the Mission Systems Engineers and other project and partner engineers result in discovery of critical risks, leading to early mitigation with significant cost and performance savings. These three missions would have suffered test failures or on-orbit failures had their MSEs not set aside time to visit engineers and technicians that were working on key pieces of space flight hardware. Availability is more than just time; it is openness to listen to concerns and questions. It begins by building a level of trust in the team that it is safe to ask questions or share concerns without the fear of blame or additional workload. It also requires enabling informal conversations (over lunch, coffee, in the clean room, or at the team members desk, etc.) where key information can be exchanged, and team members may even provide an easy-to-implement mitigation idea for another subsystem. Availability is a highly valuable commodity and completely non-obvious to protect and optimize. The natural tendency of engineers is to keep themselves busy with solving problems that they know about. This paper is encouraging MSEs to resist this tendency to try and solve all the complex problems themselves and actively devote daily time to learning and solving problems that are found with informal communications with other team members.

Lessons Learned↗

TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 8: User's Mission and System Requirements Data (appendix A of Volume 3)

A computer printout is presented of the mission requirement for the TERSSE missions and their associated user tasks. The data included in the data base represents a broad-based attempt to define the amount, extent, and type of information needed for an earth resources management program in the era of the space shuttle. An effort was made to consider all aspects of remote sensing and resource management; because of its broad scope, it is not intended that the data be used without verification for in-depth studies of particular missions and/or users. The data base represents the quantitative structure necessary to define the TERSSE architecture and requirements, and to an overall integrated view of the earth resources technology requirements of the 1980's.

Source record↗

Alaska SAR Facility Mission planning software - An interactive mission planning system

The Alaska Synthetic Aperture Radar (SAR) Facility Mission Planning Subsystem is an interactive mission planning software system on the VAXStation 2000. This system has the capability to generate satellite ephemerides and mission parameters related to synthetic aperture radar missions. The mission data can be viewed as overlays on the world map in various projections and zooms. The system also provides schedule planning capabilities, using the INGRES DBMS to keep track of the various plans and schedules generated by the mission planner.

Lo, Martin W.↗

Concurrent engineering: Spacecraft and mission operations system design

Despite our awareness of the mission design process, spacecraft historically have been designed and developed by one team and then turned over as a system to the Mission Operations organization to operate on-orbit. By applying concurrent engineering techniques and envisioning operability as an essential characteristic of spacecraft design, tradeoffs can be made in the overall mission design to minimize mission lifetime cost. Lessons learned from previous spacecraft missions will be described, as well as the implementation of concurrent mission operations and spacecraft engineering for the Near Earth Asteroid Rendezvous (NEAR) program.

Landshof, J. A.↗

Solar Maximum Mission - A systems overview

The Solar Maximum Mission (SMM), or the central effort of the Solar Maximum Year research endeavor is discussed. The mission's attempt to exploit the synergistic advantages of correlated data to obtain a complete picture of solar phenomena is stressed, as is the coordination provided by a world-wide network of ground-based observations. The prominent features of the SMM observatory, including the payload module and the solar-array system, are shown diagramatically and the science instruments (coronagraph/polarimeter, ultraviolet spectrometer/polarimeter, soft X-ray polychromater) are discussed. Descriptions of the spacecraft's electrical power system, attitude determination and control systems and communications systems are also included. The Experiment Operations Facility, which provides quick response to rapidly changing solar conditions and permits coordination with a multitude of ground observatories and coordinated experiments, is described.

Guha, A. K.↗

National Space Transportation Systems Program mission report

The 515-41B National Space Transportation Systems Program Mission Report contains a summary of the major activities and accomplishments of the sixth operational Shuttle flight and fourth flight of the OV-099 vehicle, Challenger. Since this flight was the first to land at Kennedy Space Center, the vehicle was towed directly to the OPF (Orbiter Processing Facility) where preparations for flight STS-41C, scheduled for early April 1984, began immediately. The significant problems that occurred during STS-41B are summarized and a problem tracking list that is a complete list of all problems that occurred during the flight is given. None of the problems will affect the STS 41C flight. The major objectives of flight STS-41B were to successfully deploy the Westar satellite and the Indonesian Communications Satellite-B2 (PALAPA-B2); to evaluate the MMU (Manned Maneuvering Unit) support for EVA (Extravehicular Activities); to exercise the MFR (Manipulator Foot Restraint); to demonstrate a closed loop rendezvous; and to operate the M.R (Monodisperse Latex Reactor), the ACES (Acoustic Containerless Experiment System) and the IEF (Isoelectric Focusing) in cabin experiments; and to obtain photographs with the Cinema 360 Cameras.

Collins, M. A., Jr.↗

Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

Klus, W. J.↗

National Space Transportation Systems Program mission report

The STS 41-C National Space Transportation Systems Program Mission Report contains a summary of the major activities and accomplishments of the eleventh Shuttle flight and fifth flight of the OV-099 vehicle, Challenger. Also summarized are the significant problems that occurred during STS 41-C, and a problem tracking list that is a complete list of all problems that occurred during the flight. The major objectives of flight STS 41-C were to successfully deploy the LDEF (long duration exposure facility) and retrieve, repair and redeploy the SMM (Solar Maximum Mission) spacecraft, and perform functions of IMAX and Cinema 360 cameras.

Collins, M. A., Jr.↗

Scalable Integrated Multi-Mission Support System (SIMSS) Simulator Release 2.0 for GMSEC

Scalable Integrated Multi-Mission Support System (SIMSS) Simulator Release 2.0 software is designed to perform a variety of test activities related to spacecraft simulations and ground segment checks. This innovation uses the existing SIMSS framework, which interfaces with the GMSEC (Goddard Mission Services Evolution Center) Application Programming Interface (API) Version 3.0 message middleware, and allows SIMSS to accept GMSEC standard messages via the GMSEC message bus service. SIMSS is a distributed, component-based, plug-and-play client-server system that is useful for performing real-time monitoring and communications testing. SIMSS runs on one or more workstations, and is designed to be user-configurable, or to use predefined configurations for routine operations. SIMSS consists of more than 100 modules that can be configured to create, receive, process, and/or transmit data. The SIMSS/GMSEC innovation is intended to provide missions with a low-cost solution for implementing their ground systems, as well as to significantly reduce a mission s integration time and risk.

Kim, John↗

The Saturn System

Mission planning for orbiter and entry probes of the Saturn system emphasizes scientific studies of Saturn, its satellites, its rings, and its magnetosphere.

Hunten, D. M.↗

Mission data system and the future of autonomy at Jet Propulsion Laboratory

Planetary missions require significant levels of autonomy, due to the critical, one-time-only, nature of many mission objectives, and to the long delay times for human intervention. These missions also operate in highly uncertain environments, such as planetary atmospheres or surfaces. Mission Data Systems (MDS) is a project to construct a reusable software architecture for planetary missions, based on identifying the states of the mission.

MDS autonomy↗

Space Shuttle telemetry monitoring by expert systems in mission control

The development of two real-time expert systems for making flight-critical decisions during Space Shuttle missions is discussed. The expert systems, which monitor Space Shuttle communications and the Shuttle main engines, were first used in the STS-26 mission. The NASA Mission Control Center information systems are described. Consideration is given to the use of the C language inference production system expert system tool to develop the integrated communications officer (INCO) expert system, which monitors the Shuttle communications and data systems. The layered architecture of the INCO expert system is examined and results are presented from the use of the INCO expert system during Shuttle missions.

Muratore, John F.↗

Space Launch System (SLS) Mission Planner's Guide

The purpose of this Space Launch System (SLS) Mission Planner's Guide (MPG) is to provide future payload developers/users with sufficient insight to support preliminary SLS mission planning. Consequently, this SLS MPG is not intended to be a payload requirements document; rather, it organizes and details SLS interfaces/accommodations in a manner similar to that of current Expendable Launch Vehicle (ELV) user guides to support early feasibility assessment. Like ELV Programs, once approved to fly on SLS, specific payload requirements will be defined in unique documentation.

Smith, David Alan↗

Space Launch System (SLS) Mission Planner’s Guide

The purpose of this Space Launch System (SLS) Mission Planner’s Guide (MPG) is to provide future payload developers/users with sufficient insight to support preliminary SLS mission planning. Consequently, this SLS MPG is not intended to be a payload requirements document; rather, it organizes and details SLS interfaces/accommodations in a manner similar to that of current Expendable Launch Vehicle (ELV) user guides to support early feasibility assessments. Like ELV programs, specific payload requirements will be defined in unique documentation once manifested to fly on SLS. SLS users requiring additional mission planning information or more detailed technical interchange concerning specific SLS accommodations should contact the SLS Spacecraft/Payload Integration and Evolution (SPIE) office.

Smith, David Alan↗