Search NASA⌕ Search

SEARCH · Search NASA

Results for “mobile vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Investigation of problems related to control of a mobile planetary vehicle according to a systematic plan for the exploration of Mars has been undertaken. Problem areas receiving attention include: (1) overall systems analysis; (2) vehicle configuration and dynamics; (3) toroidal wheel design and evaluation; (4) on-board navigation systems; (5) satellite-vehicle navigation systems; (6) obstacle detection systems; (7) terrain sensing, interpretation and modeling; (8) computer simulation of terrain sensor-path selection systems; and (9) chromatographic systems design concept studies. The specific tasks which have been undertaken are defined and the progress which has been achieved during the period July 1, 1971 to December 31, 1971 is summarized.

Frederick, D. K.↗

Analysis Program 2021 Annual Progress Report

During fiscal year 2021 (FY 2021), the U.S. Department of Energy Vehicle Technologies Office (VTO) funded analysis projects supportive of VTO’s goals to pursue early-stage research in vehicle and mobility system technologies to reduce petroleum dependence, increase energy reliability and security, improve transportation affordability, and promote economic growth. VTO analysis projects result in a foundation of data, analytical models, and applied analyses that provide insights into critical transportation energy problems and assist in research investment prioritization and portfolio planning. This document presents a brief overview of VTO analysis efforts and progress for projects funded in FY 2021. Each of the progress reports includes project objectives, approach, and highlights of the technical results that were accomplished during the fiscal year (FY).

33 ADVANCED PROPULSION SYSTEMS↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Problems related to the design and control of a mobile planetary vehicle to implement a systematic plan for the exploration of Mars are reported. Problem areas include: vehicle configuration, control, dynamics, systems and propulsion; systems analysis, terrain modeling and path selection; and chemical analysis of specimens. These tasks are summarized: vehicle model design, mathematical model of vehicle dynamics, experimental vehicle dynamics, obstacle negotiation, electrochemical controls, remote control, collapsibility and deployment, construction of a wheel tester, wheel analysis, payload design, system design optimization, effect of design assumptions, accessory optimal design, on-board computer subsystem, laser range measurement, discrete obstacle detection, obstacle detection systems, terrain modeling, path selection system simulation and evaluation, gas chromatograph/mass spectrometer system concepts, and chromatograph model evaluation and improvement.

Frederick, D. K.↗

Moving Towards a Common Ground and Flight Data Systems Architecture for NASA's Exploration Missions

The National Aeronautics and Space Administration has embarked on an ambitious effort to return man to the moon and then on to Mars. The Exploration Vision requires development of major new space and ground assets and poses challenges well beyond those faced by many of NASA's recent programs. New crewed vehicles must be developed. Compatible supply vehicles, surface mobility modules and robotic exploration capabilities will supplement the manned exploration vehicle. New launch systems will be developed as well as a new ground communications and control infrastructure. The development must take place in a cost-constrained environment and must advance along an aggressive schedule. Common solutions and system interoperability and will be critical to the successful development of the Exploration data systems for this wide variety of flight and ground elements. To this end, NASA has assembled a team of engineers from across the agency to identify the key challenges for Exploration data systems and to establish the most beneficial strategic approach to be followed. Key challenges and the planned NASA approach for flight and ground systems will be discussed in the paper. The described approaches will capitalize on new technologies, and will result in cross-program interoperability between spacecraft and ground systems, from multiple suppliers and agencies.

Rader. Steve↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exporation

The problems related to the design and control of a mobile planetary vehicle to implement a systematic plan for the exploration of Mars were investigated. Problem areas receiving attention include: vehicle configuration, control, dynamics, systems and propulsion; systems analysis; navigation, terrain modeling and path selection; and chemical analysis of specimens. The following specific tasks were studied: vehicle model design, mathematical modeling of dynamic vehicle, experimental vehicle dynamics, obstacle negotiation, electromechanical controls, collapsibility and deployment, construction of a wheel tester, wheel analysis, payload design, system design optimization, effect of design assumptions, accessory optimal design, on-board computer subsystem, laser range measurement, discrete obstacle detection, obstacle detection systems, terrain modeling, path selection system simulation and evaluation, gas chromatograph/mass spectrometer system concepts, chromatograph model evaluation and improvement and transport parameter evaluation.

Frederick, D. K.↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Investigation of problems related to the design and control of a mobile planetary vehicle to implement a systematic plan for the exploration of Mars has been undertaken. Problem areas receiving attention include: vehicle configuration, control, dynamics, systems and propulsion; systems analysis; terrain modeling and path selection; and chemical analysis of specimens. The following specific tasks have been under study: vehicle model design, mathematical modeling of a dynamic vehicle, experimental vehicle dynamics, obstacle negotiation, electromechanical controls, collapsibility and deployment, construction of a wheel tester, wheel analysis, payload design, system design optimization, effect of design assumptions, accessory optimal design, on-board computer sybsystem, laser range measurement, discrete obstacle detection, obstacle detection systems, terrain modeling, path selection system simulation and evaluation, gas chromatograph/mass spectrometer system concepts, chromatograph model evaluation and improvement.

Frederick, D. K.↗

Energy and mobility impacts of connected autonomous vehicles with co-optimization of speed and powertrain on mixed vehicle platoons

Intersections are known to be traffic bottlenecks where a significant amount of energy consumption could be caused due to deceleration/acceleration in the presence of red signals. With an increased level of connectivity and automation of intelligent transportation systems, connected autonomous vehicles (CAVs) are expected to be able to proactively adjust their driving strategies subject to constraints imposed by the predicted future traffic. As a result, many potential benefits can be achieved, such as improved energy efficiency, enhanced traffic safety, among many others. Notably, the way CAVs are controlled affects the following legacy vehicles (LVs) due to complex traffic dynamics. Here, we are particularly interested in studying the energy and mobility impact of CAVs with an improved traffic prediction method on mixed vehicle platoons at various market penetration rates. Leveraging traffic prediction, CAVs are controlled with co-optimization of their speed and gear position. Specifically, a traffic prediction framework in a rolling horizon fashion is employed based upon a modified Payne–Whitham (PW) model capable of handling mixed traffic consisting of CAVs and LVs. The prediction error of the modified PW model is reduced by 53.62% compared to that of the standard PW model under test scenarios. According to the predicted traffic conditions, speed and gear position of CAVs are co-optimized with the primary goal of minimizing energy consumption when driving on a signalized arterial. The energy benefits achieved by CAVs and the impact of CAVs on LVs behind are studied comprehensively for mixed vehicle platoons. The lead LV follows a real-world speed profile collected on TH-55 in Minnesota. Numerical results show that energy benefits achieved by the vehicle platoon range from 2% to 16%, and a 1% to 5% reduction in travel time for LVs behind CAVs is also observed, at different penetration rates of CAVs in various traffic scenarios. Furthermore, it is observed that CAVs using the proposed eco-driving approach appear to have a positive impact on the LVs behind in terms of energy consumption, regardless of the driving styles of the LVs ahead.

33 ADVANCED PROPULSION SYSTEMS↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

The following tasks related to the design, construction, and evaluation of a mobile planetary vehicle for unmanned exploration of Mars are discussed: (1) design and construction of a 0.5 scale dynamic vehicle; (2) mathematical modeling of vehicle dynamics; (3) experimental 0.4 scale vehicle dynamics measurements and interpretation; (4) vehicle electro-mechanical control systems; (5) remote control systems; (6) collapsibility and deployment concepts and hardware; (7) design, construction and evaluation of a wheel with increased lateral stiffness, (8) system design optimization; (9) design of an on-board computer; (10) design and construction of a laser range finder; (11) measurement of reflectivity of terrain surfaces; (12) obstacle perception by edge detection; (13) terrain modeling based on gradients; (14) laser scan systems; (15) path selection system simulation and evaluation; (16) gas chromatograph system concepts; (17) experimental chromatograph separation measurements and chromatograph model improvement and evaluation.

Frederick, D. K.↗

Advanced Air Mobility(AAM) Ecosystems Working Group Briefing Urban Air Mobility Noise Working Group (UNWG) Subgroup 2: Ground & Flight Testing

Overview of Urban Air Mobility Noise Working Group (UNWG) activities of Subgroup 2, responsible for developing Urban Air Mobility (UAM) vehicle ground and flight testing recommendations for those tasked with evaluating the acoustic characteristics of UAM vehicles under development. This topic is being briefed to an audience at the Advanced Air Mobility (AAM) Ecosystems Working Group Meeting (AEWG).

acoustics↗

Acoustic Predictions of the Moog S-250 in Hover

Acoustic predictions were made on the Moog S-250 vehicle to assess one of NASA’s mid-fidelity prediction toolchains for Urban Air Mobility-type vehicles. Experimental data from a 60-foot hover test is used for comparison. The S-250 is an RPM-controlled vehicle in a quadcopter-type configuration with four sets of contra-rotating rotors and powered by eight independently controlled electric motors. The same type of rotor blade used on the S-250 was 3D laser scanned to enable the development of custom-made airfoil tables and more accurate blade loadings. Noise predictions at the first couple of blade-pass frequencies indicate a good comparison to experimental data.

Acoustic prediction↗

Urban Aerial Mobility Networks using Amphibious Vertical Takeoff and Landing Vehicles

This study considers novel urban aerial mobility (UAM) networks that address some of the key operator and community acceptance challenges inherent in proposed UAM operations. This paper seeks to examine three possible approaches to improve operator and community acceptance – specifically targeting cost, safety, and noise. First, the conceptual design space will be examined for VTOL amphibious vehicle technologies, including the implications of onwater versus in-flight time/speed. Second, the implications of minimizing community overflights by flying over-water will be examined. Third, the implications of the partial use of onwater, or near-shore/littoral, vertiports on UAM network performance will be examined. This study considers an alternate design trade space for urban aerial mobility systems. A large number of cities in the United States are located near or surround large bodies of water. Many of these same cities are considered to be candidates for metropolitan aerial transportation systems so as to moderate the impact of urban ground-transportation congestion. This paper will expand discussion and study of notional amphibious VTOL vehicles. There is nothing particularly new with regards to helicopters with amphibious takeoff and landing capability. For example, light rotorcraft have been outfitted with pontoons since the 1950s. Larger utility helicopters – used for carrying offshore oil-rig crew – have been designed, with varying degrees of success, to emergency land in rough waters in case of onboard mechanical system failures. The unique difference for the proposed amphibious UAM vehicles, as compared to these earlier amphibious rotorcraft, is that water operation is the norm rather than the exception and that, further, the water-born operation (and design) of such vehicles can be optimized to yield significant economic and operational benefits over solely UAM land-based stations and operations. Various different amphibious UAM networks will be discussed. A first-order set of analyses – employing novel mission metrics – is presented in this paper that will examine the operational performance of these amphibious networks. In particular, amphibious operations might address critical safety and community acceptance issues. An examination of the aerodynamic and hydrodynamic characteristics of amphibious VTOL UAM vehicles will be presented in this paper. One possible conceptual design for an amphibious UAM vehicle is a hybrid synchropter/hydroplane vehicle. As interest in urban aerial mobility grows, it is worthwhile to consider whether or not amphibious vertical takeoff and landing vehicles can play an important role in providing such mobility.

Urban Aerial Mobility↗

Control Concepts for Simplified Vehicle Operations of a Quadrotor eVTOL Vehicle

Urban Air Mobility (UAM) is a future mode of transportation that will require revolutionary new vehicle concepts and operations. One of the many challenges that these vehicles face is a complex flight control task in a challenging urban environment and in different flight regimes such as hover, forward flight as well as the transitions between both, with a focus on a low workload and minimum required pilot training. This paper discusses the development and evaluation of simplified vehicle operations concepts using representative aircraft models, controls, inceptors and displays. These four aspects are inseparably interconnected. This simplified vehicle operations concept will be evaluated by performing relevant operations within a realistic urban environment. Handling quality evaluations will be performed using modified Mission Task Elements, or Handling Quality Task Elements. This paper focuses on the initial development of controls, inceptors and displays.

Thomas Lombaerts↗

Acoustic Measurements for the Moog S-250 Vehicle in Hover

Acoustic measurements for hover conditions and electric motor noise tests were conducted for the Moog S-250 research aircraft, an RPM-controlled quadcopter-type Urban Air Mobility (UAM) vehicle with four sets of contra-rotating rotors. The objectives of the study included determining the minimum far-field distance, the noise characteristics, and the potential for electric motor noise to contribute to the overall acoustic radiation for the full-scale UAM vehicle. Acoustic data for full-scale aircraft are critical for determining the impact of these vehicles on the surrounding communities. The results showed the far-field was reached by 8.1 single rotor diameters or 2.7 vehicle diameters as defined by the longest tip-to-tip rotor dimension for the vehicle. In hover, the peak acoustic radiation occurred at a declination angle of roughly 29° below the midplane between the upper and lower rotors. The lowest acoustic levels occurred below the aircraft. The electric motor noise studies, conducted with the rotors removed, showed motor noise radiated at shaft orders 17 – 20, whereas rotor noise covered the range of 2 – 24 shaft orders. There was some evidence that electric motor noise was present in previous ground run-up measurements.

Urban Air Mobility Noise↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗