Search NASA⌕ Search

SEARCH · Search NASA

Results for “office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

NASA Funding Opportunities for Optical Fabrication and Testing Technology Development

Technologies to fabricate and test optical components are required for NASA to accomplish its highest priority science missions. For example, the NRC ASTRO2010 Decadal Survey states that an advanced large-aperture UVOIR telescope is required to enable the next generation of compelling astrophysics and exo-planet science; and that present technology is not mature enough to affordably build and launch any potential UVOIR mission concept. The NRC 2012 NASA Space Technology Roadmaps and Priorities report states that the highest priority technology in which NASA should invest to 'Expand our understanding of Earth and the universe' is a new generation of astronomical telescopes. And, each of the Astrophysics division Program Office Annual Technology Reports (PATR), identifies specific technology needs. NASA has a variety of programs to fund enabling technology development: SBIR (Small Business Innovative Research); the ROSES APRA and SAT programs (Research Opportunities in Space and Earth Science; Astrophysics Research and Analysis program; Strategic Astrophysics Technology program); and several Office of the Chief Technologist (OCT) technology development programs.

Stahl, H. Philip↗

The Lunar Regolith Terrain (LRT) Field: A New Lunar Surface Planetary Analog Facility at NASA Marshall Space Flight Center (MSFC)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

Marshall Space Flight Center: Lunar Regolith Terrain (LRT)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

Marshall Space Flight Center: Lunar Regolith Terrain (LRT)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

2022 Power Global Community (Gloco) Summit Summary Report

The Prediction Of Worldwide Energy Resources (POWER) Project 25th year of providing global solar and meteorology data products to the world. The goals of this event were to inform users of new, enhanced features, gather feedback on services, identify new requests and requirements, and capture more thorough user stories while identifying new user communities and partnership opportunities. The event was “virtual” and had over 580 registrants. Over the two-day event, the Summit was attended by 162 unique attendees representing 24 countries.

NASA↗

NASA Funding Opportunities for Optical Fabrication and Testing Technology Development

NASA requires technologies to fabricate and test optical components to accomplish its highest priority science missions. The NRC ASTRO2010 Decadal Survey states that an advanced large-aperture UVOIR telescope is required to enable the next generation of compelling astrophysics and exo-planet science; and, that present technology is not mature enough to affordably build and launch any potential UVOIR mission concept. The NRC 2012 NASA Space Technology Roadmaps and Priorities Report states that the highest priority technology in which NASA should invest to 'Expand our understanding of Earth and the universe' is next generation X-ray and UVOIR telescopes. Each of the Astrophysics division Program Office Annual Technology Reports (PATR) identifies specific technology needs. NASA has a variety of programs to fund enabling technology development: SBIR (Small Business Innovative Research); the ROSES APRA and SAT programs (Research Opportunities in Space and Earth Science; Astrophysics Research and Analysis program; Strategic Astrophysics Technology program); and several Office of the Chief Technologist (OCT) programs

Stahl, H. Philip↗

Earth Science Technology Office (ESTO) New Observing Strategies (NOS) and NOS-Testbed (NOS-T)

With the advancement of space hardware technologies such as smaller spacecraft, component and instrument miniaturization and high performance space processors, and with the advancement of software technologies in artificial intelligence, big data analysis and autonomous decision making, Earth Science is looking at novel ways to observe phenomena that previously could not have been studied or would have been too expensive to study with traditional missions. In particular, the New Observing Strategies (NOS) component of the NASA Earth Science Technology Office (ESTO) Advanced Information Systems Technology (AIST) Program aims at leveraging these novel technologies as well as low cost and easy access to space to acquire multi-temporal or simultaneous multi-angular, multi-locations, multi-resolution and multi-spectral observations that will provide better multi-source measurements and will build a more dynamic and comprehensive picture of Earth Science phenomena that need to be studied and analyzed. For applications such as water resources management, air quality monitoring, biodiversity studies or disaster management, NOS will integrate the use of small instruments, small spacecraft, constellations of spacecraft and networks of sensors to design new missions that will provide the necessary measurements to improve future forecast and science modeling systems.Measurement acquisition will therefore be approached as a system of systems rather than on a mission basis, and a system of this complexity should not be expected to work without full integration and experimental characterization. Although most of the individual technologies enabling to link and coordinate multi-source observations are more or less mature, a few technologies need to be developed and all of them need to be integrated and tested as a system. In order for this validation to occur, the AIST Program is developing the NOS Testbed that includes 3 main goals:1.Validate novel NOS technologies, independently and as a system2.Demonstrate novel distributed operations concepts3.Socialize new Distributed Spacecraft Mission (DSM) and SensorWeb (SW) technologies and concepts to the science community by significantly retiring the risk of integrating these new technologies.The NOS Testbed will consist of multiple sensing nodes, simulated or actual, representing space, air and/or ground measurements, that are interconnected by a communications fabric (infrastructure that permits nodes to transmit and receive data between one another and interact with each other). Each node will be supported by hardware capabilities required to perform nodes monitoring and command & control, as well as intelligent "onboard" computing. The nodes will work together in a collaborative manner to demonstrate optimal science capabilities. The testbed will enable to validate technologies such as inter-node communication models, techniques and protocols; inter-node coordination; real-time data fusion and understanding; planning; sensor re-targeting; etc. Additionally, the testbed will have the capability to interact with various mission design tools, OSSEs and one or several forecast models. More details about the NOS Testbed will be presented at the confererence.

Earth Science missions; Advanced information Syste↗

Space flight manipulator technologies and requirements for the NASA Flight Telerobotic Servicer (FTS)

NASA Headquarters' Office of Advanced Concepts and Technology (OACT) joined efforts with Johnson Space Center's (JSC) Automation and Robotics Division and Langley Research Center's (LaRC) Information Systems Division to capture the technologies developed during the cancelled NASA Flight Telerobotic Servicer (FTS) program planned for use on Space Station Freedom. The recent FTS technology capture effort completed the build and testing of one flight qualifiable FTS manipulator, deliverable to JSC's Automation & Robotics Division for environmental testing. The many robotic technologies developed to meet the 30 year space environment design requirements are discussed in this paper. The manipulator properties were to allow positioning control to one thousandths of an inch, with zero actuator backlash over a temperature range of -50 to +95 C, and were to include impedance control and inertial decoupling. Safety and reliability requirements are discussed that were developed to allow a thirty year life in space with minimum maintenance. The system had to meet the safety requirements for hazardous payloads for operation in the shuttle payload bay during demonstration test flights prior to station use. A brief description is contained on an orbiter based robotic experiment and operational application using the dexterous FTS manipulator operating on the end of the shuttle remote manipulator systems (SRMS) from ground control.

Chladek, John T.↗

STS-121: Discovery L-2 Countdown Status Briefing

Bruce Buckingham from NASA Public Affairs introduces Pete Nicolenko, NASA Test Director, and Kathy Winters, Shuttle Weather Officer. During this STS-121 two days before launch countdown briefing, Pete Nicolenko says that there are no issues of concern and that they are on schedule for launch. He then presents and discusses an Orbiter Processing Facility (OPF) video. The OPF topics of discussion include: 1) Wheel and tire installation; 2) Gap filler installation; 3) Booster build-up; 4) Transport of External Tank (ET) 119; 5) ET to Shuttle Rocket Booster (SRB) Mate operation; 6) Roll-over of Discovery out of OPF to the Vehicle Assembly Building (VAB); and 7) Roll-out to the pad. Kathy Winters gives her weather forecast for the STS-121 launch. The video ends with a question and answer period from the media.

Source record↗

The NASA Computational Fluid Dynamics (CFD) program - Building technology to solve future challenges

This paper presents the NASA Computational Fluid Dynamics program in terms of a strategic vision and goals as well as NASA's financial commitment and personnel levels. The paper also identifies the CFD program customers and the support to those customers. In addition, the paper discusses technical emphasis and direction of the program and some recent achievements. NASA's Ames, Langley, and Lewis Research Centers are the research hubs of the CFD program while the NASA Headquarters Office of Aeronautics represents and advocates the program.

Richardson, Pamela F.↗

STS-72 Post Flight Presentation

In this post flight presentation video for the STS-72 mission, the flight crew, Cmdr. Brian Duffy, Pilot Brent Jett, and Mission Specialists Daniel T. Barry, Winston E. Scott, Leroy Chiao, and Koichi Wakata (NASDA), discuss their mission using flight footage and slides. The pre-launch and launching activities are shown. Using the robot arm inside the space shuttle's cargo bay, the Japanese Space Flyer Unit (SFU) is retrieved and berthed and the Office of Aeronautics and Space Technology (OAST) Flyer satellite is deployed, retrieved, and reberthed. Chiao and Barry performed the first of the two 6 1/2 hour EVAs and Chiao and Scott performed the second. In both EVAs, the thermal properties of the new space suits were tested, along with new tools and equipment that will eventually be used to build the International Space Station. Space shuttle landing activities are also shown. Earth views include cloud shadows, Africa, Brazil, Australia, and Mt. Kilimanjaro.

Peterson, Glen↗

NASA Crew Launch Vehicle Approach Builds on Lessons from Past and Present Missions

The United States Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with a new human-rated system suitable for missions to the Moon and Mars. The Crew Exploration Vehicle (CEV) that the new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. NASA is using its extensive experience gained from past and ongoing launch vehicle programs to maximize the CLV system design approach, with the objective of reducing total lifecycle costs through operational efficiencies. To provide in-depth data for selecting this follow-on launch vehicle, the Exploration Systems Architecture Study was conducted during the summer of 2005, following the confirmation of the new NASA Administrator. A team of aerospace subject matter experts used technical, budget, and schedule objectives to analyze a number of potential launch systems, with a focus on human rating for exploration missions. The results showed that a variant of the Space Shuttle, utilizing the reusable Solid Rocket Booster as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit, was the best choice to reduce the risks associated with fielding a new system in a timely manner. The CLV Project, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operation of this new human-rated system. The CLV Project works closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch system . leveraging a wealth of lessons learned from Shuttle operations. The CL V is being designed to reduce costs through a number of methods, ranging from validating requirements to conducting trades studies against the concept design. Innovations such as automated processing will build on lessons learned from the Shuttle, other launch systems, Department of Defense operations experience, and subscale flight tests such as the Delta Clipper-Experimental Advanced (DCXA) vehicle operations that utilized minimal touch labor, automated cryogen ic propellant loading , and an 8-hour turnaround for a cryogenic propulsion system. For the CLV, the results of hazard analyses are contributing to an integrated vehicle health monitoring system that will troubleshoot anomalies and determine which ones can be solved without human intervention. Such advances will help streamline the mission operations process for pilots and ground controllers alike. In fiscal year 2005, NASA invested approximately $4.5 billion of its $16 bill ion budget on the Space Shuttle. The ultimate goal of the CLV Project is to deliver a safe, reliable system designed to minimize lifecycle costs so that NASA's budget can be invested in missions of scientific discovery. Lessons learned from developing the CLV will be applied to the growth path for future systems, including a heavy lift launch vehicle.

Dumbacher, Daniel L.↗

Solar energy system performance evaluation: Seasonal report for IBM system 1A, Huntsville, Alabama

The operational and thermal performance of the solar energy system, Sims Prototype System 1A, is described. The system was designed by IBM to provide 50 to 60 percent of the space heating and domestic hot water preheating load to a 2,000 square foot floor space single family residence in the Huntsville area. The load design temperature inside the building was to be maintained at 70 degrees fahrenheit with auxiliary energy for heating supplied by an electric heat pump assisted by an electric resistance strip heater. In general the disappointing operation of this system is attributed to the manner in which it was used. The system was designed for residential application and used to satisfy the demands of an office environment. The differences were: (1) inside temperature was not maintained at 70 F as expected; and (2) hot water usage was much lower than expected. The conclusion is that the solar energy system must be designed for the type of application in which it is used. Misapplication usually will have an adverse affect on system performance.

Source record↗

Modular, Reconfigurable, and Rapid Response Space Systems: The Remote Sensing Advanced Technology Microsatellite

Modular, Reconfigurable, and Rapid-response (MR(sup 2)) space systems represent a paradigm shift in the way space assets of all sizes are designed, manufactured, integrated, tested, and flown. This paper will describe the MR(sup 2) paradigm in detail, and will include guidelines for its implementation. The Remote Sensing Advanced Technology microsatellite (RSAT) is a proposed flight system test-bed used for developing and implementing principles and best practices for MR(sup 2) spacecraft, and their supporting infrastructure. The initial goal of this test-bed application is to produce a lightweight (approx. 100 kg), production-minded, cost-effective, and scalable remote sensing micro-satellite capable of high performance and broad applicability. Such applications range from future distributed space systems, to sensor-webs, and rapid-response satellite systems. Architectures will be explored that strike a balance between modularity and integration while preserving the MR(sup 2) paradigm. Modularity versus integration has always been a point of contention when approaching a design: whereas one-of-a-kind missions may require close integration resulting in performance optimization, multiple and flexible application spacecraft benefit &om modularity, resulting in maximum flexibility. The process of building spacecraft rapidly (< 7 days), requires a concerted and methodical look at system integration and test processes and pitfalls. Although the concept of modularity is not new and was first developed in the 1970s by NASA's Goddard Space Flight Center (Multi-Mission Modular Spacecraft), it was never modernized and was eventually abandoned. Such concepts as the Rapid Spacecraft Development Office (RSDO) became the preferred method for acquiring satellites. Notwithstanding, over the past 30 years technology has advanced considerably, and the time is ripe to reconsider modularity in its own right, as enabler of R(sup 2), and as a key element of transformational systems. The MR2 architecture provides a competitive advantage over the old modular approach in its rapid response to market needs that are difficult to predict both from the perspectives of evolving technology, as well as mission and application requirements.

Esper, Jaime↗

Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30, 60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

Barta, Daniel J.↗

Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30,60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

Barta, Daniel J.↗