Search NASA⌕ Search

SEARCH · Search NASA

Results for “process and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Implementation of a Relay Coordination System for the Mars Network

Mars network relay operations involve the coordination of lander and orbiter teams through long-term and short-term planning, tactical changes and post-pass analysis. Much of this coordination is managed through email traffic and point-to-point file data exchanges. It is often difficult to construct a complete and accurate picture of the relay situation at any given moment, as there is no centralized store of correlated relay data. The Mars Relay Operations Service (MaROS) is being implemented to address the problem of relay coordination for current and next-generation relay missions. The service is provided for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These "relay" sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This paper will discuss the relay coordination problem space, overview the architecture and design selected to meet system requirements, and describe the first phase of system implementation

Allard, Daniel A.↗

Reinventing The Design Process: Teams and Models

The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues. Now and in the future, costs are capped and schedules fixed-these two variables must be treated as independent in the design process. Accordingly, JPL has redesigned its design process. At the conceptual level, design times have been reduced by properly defining the required design depth, improving the linkages between tools, and managing team dynamics. In implementation-phase design, system requirements will be held in crosscutting models, linked to subsystem design tools through a central database that captures the design and supplies needed configuration management and control. Mission goals will then be captured in timelining software that drives the models, testing their capability to execute the goals. Metrics are used to measure and control both processes and to ensure that design parameters converge through the design process within schedule constraints. This methodology manages margins controlled by acceptable risk levels. Thus, teams can evolve risk tolerance (and cost) as they would any engineering parameter. This new approach allows more design freedom for a longer time, which tends to encourage revolutionary and unexpected improvements in design.

Wall, Stephen D.↗

Inputs requested from earth resources remote sensing data users regarding LANDSAT-C mission requirements and data needs

Inputs from prospective LANDSAT-C data users are requested to aid NASA in defining LANDSAT-C mission and data requirements and in making decisions regarding the scheduling of satellite operations and ground data processing operations. Design specifications, multispectral band scanner performance characteristics, satellite schedule operations, and types of available data products are briefly described.

Source record↗

Development of wire drawing processes for refractory metal fibers

Fabrication schedules were developed for producing wire, 0.25 mm to 0.51 mm diameter, from the refractory metal alloys ASTAR-811C, B-88 and W-Hf-C. Tensile properties were evaluated at room temperature and up to 1204 C. Also, the stress rupture properties of the alloys at 1093 C were determined. W-Hf-C and B-88 were found to have the best mechanical properties on a strength to density basis. The fabrication schedules for producing wire from these two alloys were further improved with regards to the wire quality and material yield under the optimization of fabrication schedule.

King, G. W.↗

Materials processing in space

A brief overview of the current Materials Processing in Space Program is given, including a tentative schedule of flight experiments. Some recent results of processing materials (e.g., polymers and eutectic materials) in a microgravity environment are given, along with a discussion on additional proposed flight experiments. Ground-based results and the rationale for flight experimentation will be presented for other materials processes, including crystal growth.

W. A. Oran↗

FASTER - A tool for DSN forecasting and scheduling

FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling JPL's Deep Space Network (DSN). The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER consists of MS-Windows based programs that replace two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to 'look ahead' at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.

Werntz, David↗

FASTER -- A Tool for DSN Forecasting and Scheduling

FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling of JPL's DSN. The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER is a MS-Windows based program that replaces two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to "look ahead" at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.

forecasting↗

The path to an experiment in space (from concept to flight)

The following are discussed in this viewgraph presentation on developing flight experiments for NASA's Microgravity Science and Applications Program: time from flight PI selection to launch; key flight experiment phases and schedule drivers; microgravity experiment definition/development process; definition and engineering development phase; ground-based reduced gravity research facilities; project organization; responsibilities and duties of principle investigator/co-investigators, project scientist, and project manager; the science requirements document; flight development phase; experiment cost and schedule; and keys to experiment success.

Salzman, Jack A.↗

Autonomous Navigation with Ground-to-Space Doppler Measurements Referenced to a Temperature-Compensated Crystal Oscillator

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has spent several years developing operational Onboard Navigation Systems (ONS's) to provide real-time autonomous, high-accuracy navigation products for spacecraft using NASA's space and ground communication systems. The highly successful Tracking and Data Relay Satellite System (TDRSS) ONS (TONS) experiment on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, flight-demonstrated the ONS for high-accuracy navigation using TDRSS forward- link communications services, In late 1994, the ground station ONS (GONS) experiment, using the same EP/EUVE flight hardware, flight-demonstrated the feasibility of high-accuracy autonomous navigation using ground station forward-link communication services, with an ultrastable oscillator (USO) as the frequency reference (1 part in 10(exp 10) over 24 hours). This paper provides a follow-on analysis of GONS performance to assess the navigation accuracy achievable if GONS uses the significantly less stable (5 parts in 10(exp 8) over 24 hours, compared with a specification of 1 part in 10(exp 6)) Temperature-Compensated Crystal Oscillator (TCXO), which is integral to the transponder, as a frequency reference rather than an external USO. The GONS TCXO experiment results from a 20-day period are used to project the expected performance of an operational system. The GONS processes Doppler data derived from nominally scheduled ground station forward-link communication services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination. To evaluate the navigation accuracies achievable if a TCXO were used, actual experiment data (which used the USO as the frequency reference) were corrupted with errors from real TDRSS one-way return tracking measurements taken from EP/EUVE's TCXO. Analysis of the GONS TCXO experiment performance indicates that real-time onboard position accuracies of better than 300 meters (1 sigma) are achievable with as few as two tracking contacts per day for the EP/EUVE 525-kilometer altitude, 28.5-degree inclination orbit, provided the TCXO is as stable as that in EP/EUVE's TDRSS transponder. GONS using a TCXO frequency reference provides a viable option for many upcoming spacecraft missions with moderate position accuracy requirements and an interest in reducing their operational costs with autonomous navigation.

Radomski, M. S.↗

Performance bounds on parallel self-initiating discrete-event

The use is considered of massively parallel architectures to execute discrete-event simulations of what is termed self-initiating models. A logical process in a self-initiating model schedules its own state re-evaluation times, independently of any other logical process, and sends its new state to other logical processes following the re-evaluation. The interest is in the effects of that communication on synchronization. The performance is considered of various synchronization protocols by deriving upper and lower bounds on optimal performance, upper bounds on Time Warp's performance, and lower bounds on the performance of a new conservative protocol. The analysis of Time Warp includes the overhead costs of state-saving and rollback. The analysis points out sufficient conditions for the conservative protocol to outperform Time Warp. The analysis also quantifies the sensitivity of performance to message fan-out, lookahead ability, and the probability distributions underlying the simulation.

Nicol, David M.↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗

Parallel plan execution with self-processing networks

A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.

Dautrechy, C. Lynne↗

Parallel plan execution with self-processing networks

A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.

D'Autrechy, C. Lynne↗

Automated control of hierarchical systems using value-driven methods

An introduction is given to the Value-driven methodology, which has been successfully applied to solve a variety of difficult decision, control, and optimization problems. Many real-world decision processes (e.g., those encountered in scheduling, allocation, and command and control) involve a hierarchy of complex planning considerations. For such problems it is virtually impossible to define a fixed set of rules that will operate satisfactorily over the full range of probable contingencies. Decision Science Applications' value-driven methodology offers a systematic way of automating the intuitive, common-sense approach used by human planners. The inherent responsiveness of value-driven systems to user-controlled priorities makes them particularly suitable for semi-automated applications in which the user must remain in command of the systems operation. Three examples of the practical application of the approach in the automation of hierarchical decision processes are discussed: the TAC Brawler air-to-air combat simulation is a four-level computerized hierarchy; the autonomous underwater vehicle mission planning system is a three-level control system; and the Space Station Freedom electrical power control and scheduling system is designed as a two-level hierarchy. The methodology is compared with rule-based systems and with other more widely-known optimization techniques.

Pugh, George E.↗

Case Study: Managing Undergraduate Interns in the Context of Multidisciplinary Projects

Internship opportunities can be immensely beneficial to both the students who pursue them and the labs that employ them. However, optimal results for all stakeholders can be uncertain. Several factors compound this issue. In this case study, the highly multidisciplinary nature of the BioEngineering Instrumentation Group at NASA Ames Research Center has made productively integrating short-term summer interns challenging. In general, taking on more undergraduate interns during a given time period can lead to diminishing returns, particularly if those interns are primarily short-time interns with few long-term senior students present.Introducing a level of industry-style project management processes can help. On the one hand, extreme formality can reduce the enthusiasm that students can bring; also, time constraints on internships make extensive training in formal process an investment with comparatively little return. On the other hand, lack of process can result in many forms of wastage. A moderate, lightweight level of process i.e., simple processes with high payoff to time invested ratios, including processes to effectively handle multidisciplinary issues can yield both a far more efficient lab, and a richer educational experience for the interns. In this case study, we implemented simple processes such as brief weekly stand-up meetings, a standard action item bug tracking process, and deadline-based scheduling with prudent reserves and critical path tracking.To evaluate these steps, several parameters were considered: the number of projects the lab could successfully pursue, the number of interns that could be successfully integrated onto each project, diversity of student intern educational backgrounds, student satisfaction, student understanding of expectations, and student preparation for industry-standard work. Generally, outcomes were enhanced across the board, even with imperfectly implemented processes. Lightweight process implementation is shown to be tremendously effective in a multidisciplinary internship context.

Case Study↗

Concept of Operations Visualization in Support of Ares I Production

Boeing was selected in 2007 to manufacture Ares I Upper Stage and Instrument Unit according to NASA's design which would require the use of the latest manufacturing and integration processes to meet NASA budget and schedule targets. Past production experience has established that the majority of the life cycle cost is established during the initial design process. Concept of Operations (CONOPs) visualizations/simulations help to reduce life cycle cost during the early design stage. Production and operation visualizations can reduce tooling, factory capacity, safety, and build process risks while spreading program support across government, academic, media and public constituencies. The NASA/Boeing production visualization (DELMIA; Digital Enterprise Lean Manufacturing Interactive Application) promotes timely, concurrent and collaborative producibility analysis (Boeing)while supporting Upper Stage Design Cycles (NASA). The DELMIA CONOPs visualization reduced overall Upper Stage production flow time at the manufacturing facility by over 100 man-days to 312.5 man-days and helped to identify technical access issues. The NASA/Boeing Interactive Concept of Operations (ICON) provides interactive access to Ares using real mission parameters, allows users to configure the mission which encourages ownership and identifies areas for improvement, allows mission operations or spacecraft detail to be added as needed, and provides an effective, low coast advocacy, outreach and education tool.

Chilton, James H.↗

Options for Parallelizing a Planning and Scheduling Algorithm

Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

parallel algorithms↗

Management of optics

American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

Kirchner, T. E.↗