Search NASA⌕ Search

SEARCH · Search NASA

Results for “process and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Evaluating Spatial Accelerator Architectures with Tiled Matrix-Matrix Multiplication.

There is a growing interest in custom spatial accelerators for machine learning applications. These accelerators employ a spatial array of processing elements (PEs) interacting via custom buffer hierarchies and networks-on-chip. The efficiency of these accelerators comes from employing optimized dataflow (i.e., spatial/temporal partitioning of data across the PEs and fine-grained scheduling) strategies to optimize data reuse. The focus of this work is to evaluate these accelerator architectures using a tiled general matrix-matrix multiplication (GEMM) kernel. To do so, we develop a framework that finds optimized mappings (dataflow and tile sizes) for a tiled GEMM for a given spatial accelerator and workload combination, leveraging an analytical cost model for runtime and energy. Finally, our evaluations over five spatial accelerators demonstrate that the tiled GEMM mappings systematically generated by our framework achieve high performance on various GEMM workloads and accelerators.

42 ENGINEERING↗

Evaluating Spatial Accelerator Architectures with Tiled Matrix-Matrix Multiplication

There is a growing interest in custom spatial accelerators for machine learning applications. These accelerators employ a spatial array of processing elements (PEs) interacting via custom buffer hierarchies and networks-on-chip. The efficiency of these accelerators comes from employing optimized dataflow (i.e., spatial/temporal partitioning of data across the PEs and fine-grained scheduling) strategies to optimize data reuse. The focus of this work is to evaluate these accelerator architectures using a tiled general matrix-matrix multiplication (GEMM) kernel. To do so, we develop a framework that finds optimized mappings (dataflow and tile sizes) for a tiled GEMM for a given spatial accelerator and workload combination, leveraging an analytical cost model for runtime and energy. Our evaluations over five spatial accelerators demonstrate that the tiled GEMM mappings systematically generated by our framework achieve high performance on various GEMM workloads and accelerators.

43 PARTICLE ACCELERATORS↗

Celeritas R&D Report: Accelerating Geant4

Celeritas is a new Monte Carlo (MC) detector simulation code designed for computationally intensive applications on high-performance heterogeneous architectures. In the past two years Celeritas has advanced from prototyping a Graphics Processing Unit (GPU)-based single physics model in infinite medium to implementing a full set of electromagnetic (EM) physics processes in complex geometries. The current release of Celeritas, version 0.4, has incorporated full device-based navigation, an event loop in the presence of magnetic fields, and detector hit scoring. New functionality incorporates a scheduler to offload electromagnetic physics to the GPU within a Geant4-driven simulation, enabling straightforward integration of Celeritas into the high energy physics (HEP) experimental frameworks CMSSW and ATLAS FullSimLight. On the Perlmutter supercomputer, Celeritas performs EM physics between 3× and 18× faster using the machine’s Nvidia GPUs compared to using only CPUs, corresponding to an electrical power efficiency up to a factor of 5. When running a multithreaded Geant4 ATLAS test beam application with full hadronic physics, using Celeritas to accelerate the EM physics results in an overall simulation speedup of 1.7–2.2× on GPU and 1.2× on CPU. In a CMS test application using tt¯ events and the prototype Run 4 configuration, compared to Geant4 CPU, Celeritas with a Nvidia A100 improves overall throughput up to a factor of 2.7× but cannot be efficiently shared with more than 8 cores.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The Influence of Shielding Gas on the Wire-Arc Additive Manufacturing (WAAM) of Ni-Based Superalloy Haynes 282

Wire-arc additive manufacturing (WAAM) enables building large near-net-shaped parts using fast deposition rates and is attractive due to the potential cost and schedule savings. Haynes® 282® is a Ni-based superalloy with wide application in advanced power generation systems for its superior high temperature mechanical properties. High-quality WAAM H282 parts are achieved through careful process optimization, hence, we have focused on systematically characterizing the processing-structure-properties relationships over a wide range of wire-feed and travel speeds using a standard Ar30He shielding gas. Here the influence of adding 0.25-3% of H2 and CO2 to Ar-30He standard on our findings is examined. Multi-bead tracks were used to screen 20+ gas combinations to examine impact on wettability, porosity, oxidation, and grain structures. Improved multi-tracks are observed for gases with up to 1% H2 and 0.25% CO2. WAAM H282 builds within this range are examined to reveal differences in microstructure as evaluated with CT, SEM-EDS, and EBSD.

36 MATERIALS SCIENCE↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SULI Research Report Paper

The Intelligence and Space Research Group 4 (ISR-4) at the Los Alamos National Laboratory focuses on signal processing and developing space electronics for various national security missions. The Space and Atmospheric Burst Reporting System (SABRS) is a sensing payload designed for nuclear detonation detection. As the sensors from previous payloads become obsolete, the requirement for a novel payload design increases. SABRS Prime is the successor to the previous SABRS payloads and is scheduled for delivery in 2028. As part of the SABRS Prompt Gamma Instrument Interface Board, high frequency signals from silicon photomultiplier tubes need to be split and subsequently transmitted to the Analog to Digital Converter. Prior to developing the Space Grade Instrument Interface Board, evaluation modules with Commercial off-the-shelf (COTS) components are evaluated and tested under rigorous conditions. Verification of power levels and gain specifications are some of the important steps taken during the evaluation stage. Working on the Signal Splitting Board has enabled me to work with various schematic software applications and learn more about the processes behind designing space grade electronic components. In addition, I conducted research on efficiency improvements for space-based power systems. Changes in design approaches were found to be the most significant sources of improvement. Being able to interact with researchers and peers across various scientific disciplines has given me a better insight into my future pursuits. Working in a R&D environment has cemented my decision to work on space applications for Quantum Sensing and pursue a PhD in Electrical Engineering. The SULI internship program at the Los Alamos National Laboratory has helped me develop the skillset of a researcher, understand the rigorous processes behind developing space grade hardware, and improve my critical thinking abilities to support the development of reliable instrumentation for deep space missions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

LAMP Manufacturing Survey (Final Report)

This report presents the results of a market manufacturing survey performed for fabricating radiofrequency quadrupoles (RFQ) and Drift Tube Linear Accelerator (DTL) components needed for the Los Alamos Neutron Science Center (LANSCE) Modernization Project (LAMP). A review on existing RFQs and DTLs with their parameters, a summary of specific capabilities needed to manufacture them, the common issues during the fabrication process, their consequences, and resolutions to these problems is presented in this report. The goal of this study is to identify potential collaborators and companies capable of manufacturing the necessary accelerator equipment, while minimizing cost and schedule risks that could impact the future modernization of the LANSCE facility.

43 PARTICLE ACCELERATORS↗

Real-time In-process Monitoring for Additive Manufacturing (Final CRADA Report)

Phase 3D has invented a real-time in-process monitoring system which can retrofit any industrial 3D printer to provide actionable part quality data. Designed to provide value to builders through dimensional measurements of several in-situ part features, the system reduces lost schedule time and wasted energy via allowing for earlier part scrap.

36 MATERIALS SCIENCE↗

Methodology for Exploring Water and Hydropower Operating Criteria That Simultaneously Improve Economic and Environmental Considerations

Despite the reliability and flexibility of hydropower, the operation of hydroelectric power plants may have significant impacts on the downstream river system, including its water stage, sediment transport, and water temperature, ultimately affecting the ecology. To address these challenges, there is a need to identify water scheduling patterns that improve both hydropower economics and the environment relative to current operations. This paper presents a new methodology to explore promising operational criteria/rules that can achieve such improvements. Typical environmental impact statements and relicensing processes generally perform detailed site-specific analyses of a few alternatives that focus on reservoir water release operating rules and their associated environmental impacts. In contrast, the methodology presented in this article uses a widely applicable approach that explores a much larger solution space. This large set of potential alternatives can be represented in a multidimensional space for which one axis represents the economic value and the other axis quantify individual environmental impacts (e.g., sediment transport and fish growth), and they are explored via two approaches: a Monte Carlo simulation that identifies “win–win” alternatives and a multi-objective optimization problem that identifies Pareto-optimal alternatives.

13 HYDRO ENERGY↗

MICCO: An Enhanced Multi-GPU Scheduling Framework for Many-Body Correlation Functions

Calculation of many-body correlation functions is one of the critical kernels utilized in many scientific computing areas, especially in Lattice Quantum Chromodynamics (Lattice QCD). It is formalized as a sum of a large number of contraction terms each of which can be represented by a graph consisting of vertices describing quarks inside a hadron node and edges designating quark propagations at specific time intervals. Due to its computation- and memory-intensive nature, real-world physics systems (e.g., multi-meson or multi-baryon systems) explored by Lattice QCD prefer to leverage multi-GPUs. Different from general graph processing, many-body correlation function calculations show two specific features: a large number of computation-/data-intensive kernels and frequently repeated appearances of original and intermediate data. The former results in expensive memory operations such as tensor movements and evictions. The latter offers data reuse opportunities to mitigate the data-intensive nature of many-body correlation function calculations. However, existing graph-based multi-GPU schedulers cannot capture these data-centric features, thus resulting in a sub-optimal performance for many-body correlation function calculations. To address this issue, this paper presents a multi-GPU scheduling framework, MICCO, to accelerate contractions for correlation functions particularly by taking the data dimension (e.g., data reuse and data eviction) into account. This work first performs a comprehensive study on the interplay of data reuse and load balance, and designs two new concepts: local reuse pattern and reuse bound to study the opportunity of achieving the optimal trade-off between them. Based on this study, MICCO proposes a heuristic scheduling algorithm and a machine-learning-based regression model to generate the optimal setting of reuse bounds. Specifically, MICCO is integrated into a real-world Lattice QCD system, Redstar, for the first time running on multiple GPUs. The evaluation demonstrates MICCO outperforms other state-of-art works, achieving up to 2.25× speedup in synthesized datasets, and 1.49× speedup in real-world correlation functions.

Wang, Qihan↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Winning Asset Management Improvement Team: Maintenance Planning and Scheduling in a Highly Regulated Environment

The Y-12 National Complex (Y-12) site has numerous aging facilities that are crucial to the Department of Energy and the national security strategy for the nation. Y-12’s commitment to safety and regulatory compliance is of the highest importance. The commitment to meet the national security mission also creates additional rigor and complexity to the everyday maintenance and planning process. Y-12 is a collection of many facilities, both old and new, nestled between two ridges in Oak Ridge, TN. Y-12 was made with the short-term focus of ending “The Great War” through the creation of the worlds’ first atomic bomb. Almost eighty (80) years have passed since the groundbreaking, with the mission of the site changing from decade to decade. While the mission has changed, the way Y-12 employees continuously meet the challenge has not. The site was created to react and overcome; Y-12 still takes pride in the ability to react and overcome. The difference is the site is no longer ignorant to the need for a better way to manage the aging facilities and infrastructure. Shear willpower and determination was once the way to reach the objectives, but as a wise man once said, “Work smarter, not harder.” The business case for change started within the senior leadership at Y-12. A team of managers sat down and dictated objectives to provide a clear scope for the maintenance planning and scheduling optimization team, to include our Eruditio integrated blended learning coaches. In addition to providing the direction, they also made themselves available for escalation of issues in the event the team ran in to road blocks.

99 GENERAL AND MISCELLANEOUS↗

Update on Parallel Process Execution in the Next Generation System Analysis Model

As of the end of 2021, 88,880 metric tons of heavy metal (MTHM) (44,741 MTHM in dry storage; 44,139 MTHM in wet storage) of spent nuclear fuel (SNF) were stored at various reactor sites across the United States [1]. The Office of Storage and Transportation in the Department of Energy is planning for the transportation, storage, and eventual disposal of SNF and high-level radioactive waste (HLW). To aid in this effort and inform decision-makers about the backend of the spent fuel cycle, systems analysis tools capable of analyzing the various options with respect to SNF and HLW management are being used as well as continuously improved to meet the evolving needs of the program. System analysts typically use these tools to vary underlying assumptions (shipping rates, allocation priority, available facilities, start dates, etc.) and study the implications of these changes on site clearance schedules, campaign costs, transportation infrastructure acquisition, etc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NLR HPC Eagle Jobs Data and Additional Energy Metrics

Overview: Anonymized job-level records from the Eagle high-performance computing (HPC) system at the National Laboratory of the Rockies (NLR). Each record represents a Slurm batch job with scheduling metadata, resource requests, resource utilization, CPU/GPU energy consumption, and efficiency metrics. Sensitive fields (user, account, job name) are replaced with cryptographic hashes. System & Timeframe: Eagle was a 2,000-node, 8-petaflop system operated at NLR from 2019–2024. Data covers the full operational lifetime of the system. Slurm data was processed nightly; timestamps are in Mountain Time. Funding provided by the U.S. Department of Energy, EERE. Files: esif.hpc.eagle.job-anon.zip — Core anonymized job records (Hive-partitioned Parquet) esif.hpc.eagle.job-anon-energy-metrics.zip — Same records with additional iLO and Ganglia energy metrics datacard.md — Full dataset documentation ~13.8 million rows, 62 variables. Readable with PyArrow, pandas, DuckDB, Apache Spark, or any Parquet-compatible tool. Data Collection: Jobs collected via sacct through a pipeline: Eagle Jobs API → Redpanda → StreamSets → HPCMON API → PostgreSQL. Node-level power from iLO (HP Integrated Lights-Out); GPU power from Ganglia monitoring, joined to jobs via node lists and time ranges. Preprocessing: Anonymization of name, user, and account fields via cryptographic hashing Derived columns: queue_wait, cpu_eff, max_mem_eff Simplified job state mapping (e.g., "CANCELLED BY 12345" → "CANCELLED") QoS accounting rules (buy-in, standby, or Slurm QoS value) CPU energy estimated from TDP (200W, Intel Xeon Gold 6154, 18 cores) Timezone-aware columns (_tz) sourced from LEX accounting database to correctly handle DST transitions Key Variables: Scheduling: job_id, partition, state_simple, submit_time_tz, start_time_tz, end_time_tz, queue_waitResources: nodes_req/used, processors_req/used, memory_req, wallclock_req/used, gpus_requested Efficiency: cpu_eff, max_mem_eff Energy: cpu_energy_tdp_estimated_max/used_watt_hours, node_energy_total_watt_hours (iLO), gpu0/1_energy_total_watt_hours (Ganglia) Partitions: bigmem, bigmem-8600, bigscratch, csc, dav, ddn, debug, gpu, haswell, long, mono, short, standard Job States: CANCELLED, COMPLETED, FAILED, NODE_FAIL, OUT_OF_MEMORY, PENDING, RUNNING, TIMEOUT QoS Levels: Unknown, normal, buy-in, debug, penalty, high, standby Important Notes: Non-_tz timestamp columns may be off by one hour across DST boundaries; use _tz columns for time difference calculations Energy fields are null for jobs without monitoring coverage Job step records and raw Slurm JSONB fields are excluded from this extract Do not attempt to re-identify individuals from hashed fields

97 MATHEMATICS AND COMPUTING↗

A Custom Machine to Convey Radiologically Impacted Cohesive Soils to the Orion ScanSortSM System - 20382

An established method to reduce the volume of material required to be disposed of as radioactive waste is conveyor-based sorting of potentially radiologically impacted soils. With the Orion ScanSortSM system, potentially impacted soils are conveyed beneath radiation detectors and sorted into above and below criteria bins based on the detectors' response. Confident measurements can only be efficiently achieved when the soil column being conveyed has a reasonably consistent geometry. Highly cohesive soils present a very significant challenge as they tend to clump and adhere to the conveyor hopper, strike-off bar, and belt skirting. This causes voids and valleys in the soil column that affect the measurement geometry and reduce the confidence in the measurement. The reduction in confidence necessitates a longer residence time (i.e. reduction in conveyor belt speed and processing rates) or that the soils in highly unfavorable geometries be dispositioned as impacted or segregated for resurvey (should site logistics support that option). These outcomes may increase the volume of material required to be dispositioned as radiological waste and have a negative impact on project cost and schedule. To minimize impact to sorting operations, Wood designed and built a customized Extruder, to optimize the soil column prior to assay. The design was developed and refined to minimize the volume of highly cohesive soils presented in highly unfavorable geometries in the soil column in order to confidently assess and disposition such soils in a high-production environment. The Extruder is a customized 90 cm wide flat conveyor that has an oversized hopper with a pair of motor-driven rollers that force the soils in the hopper through an opening of adjustable height. The soils are extruded through the opening to produce a soil column that is ∼75 cm wide and ∼8-18 cm deep with a design rate of 225 metric tons/hr. The Extruder was recently deployed with the Orion ScanSort{sup SM} System to a site in northeast Ohio. The site has highly cohesive soils that result from the weathering of glacial sediments and consist of clay and clay loam, resulting in poor drainage and high moisture content. The project infrastructure only supported two bins of material (above and below criteria), which necessitated that soils with unfavorable geometries be discharged into the above criteria bin, along with material determined to have been contaminated. The Extruder was extremely successful in producing a stable soil column with favorable geometries for radiological assay. During production, less than 0.5% (by mass) of the soils processed were presented in unsatisfactory geometries requiring disposition as radioactive waste. The Extruder did not get clogged due to the cohesive soils (as is typical with conventional conveyors) and required very little maintenance, again minimizing impacts to sorting operations. The conveyor belt speed was operated at 14 cm/s with a typical belt loading of ∼109 kg/m resulting in a mean process rate of ∼49 metric tons/hr. The process rate was constrained by other project logistics, rather than by the capabilities of the Extruder, which was operated at less than 20% of the maximum design speed (75 cm/s). It is concluded that the Extruder is highly likely to produce a stable highly cohesive soil column suitable for efficient and confident radiological assay in production environments of 250 short tons/hr or more. The Extruder has the capability to drastically reduce the duration and costs of projects with radiologically impacted highly cohesive soils. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Restoration Strategy for Active Distribution Systems Considering Endogenous Uncertainty in Cold Load Pickup

Cold load pickup (CLPU) phenomenon is identified as the persistent power inrush upon a sudden load pickup after an outage. Under the active distribution system (ADS) paradigm, where distributed energy resources (DERs) are extensively installed, the decreased outage duration can induce a strong interdependence between CLPU pattern and load pickup decisions. In this paper, we propose a novel modelling technique to tractably capture the decision-dependent uncertainty (DDU) inherent in the CLPU process. Subsequently, a two-stage stochastic decision-dependent service restoration (SDDSR) model is constructed, where first stage searches for the optimal switching sequences to decide step-wise network topology, and the second stage optimizes the detailed generation schedule of DERs as well as the energization of switchable loads. Further, to tackle the computational burdens introduced by mixed-integer recourse, the progressive hedging algorithm (PHA) is utilized to decompose the original model into scenario-wise subproblems that can be solved in parallel. The numerical test on modified IEEE 123-node test feeders has verified the efficiency of our proposed SDDSR model and provided fresh insights into the monetary and secure values of DDU quantification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operating Dynamic Reserve Dimensioning Using Probabilistic Forecasts

The rapid integration of variable energy sources (VRES) into power grids increases variability and uncertainty of the net demand, making the power system operation challenging. Operating reserve is used by system operators to manage and hedge against such variability and uncertainty. Traditionally, reserve requirements are determined by rules-of-thumb (static reserve requirements, e.g., NERC Reliability Standards), and more recently, dynamic reserve requirements from tools and methods which are in the adoption process (e.g., DynADOR, DRD, and RESERVE, among others). While these methods/tools significantly improve the static rule-of-thumb approaches, they rely exclusively on deterministic data (i.e., best guess only). Consequently, these methods disregard the probabilistic uncertainty thresholds associated with specific days and their weather conditions (i.e., best guess plus probabilistic uncertainty). This work presents practical approaches to determine the operating reserve requirements leveraging the wealth information from probabilistic forecasts. Proposed approaches are validated and tested using actual data from the CAISO system. Furthermore, results show the benefits in terms of risk reduction of considering the probabilistic forecast information into the dimensioning process of operating reserve requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Adaptable and Comprehensive Project Assessment Tool

Most companies, agencies, and other real property owners require capital asset projects to pass some type of scrutiny before budgets and authority to expend funds for the design, construction and eventual operations are approved. This process typically involves management approval of key/critical decision(s) or a project’s passage through gates (or critical decisions). Cost, functionality, safety, and risk are just some of the factors typically considered during project assessment processes. This paper describes a tool that was developed and is used by the Department of Energy to facilitate this project assessment process. There are three versions of this tool for construction, decontamination and decommissioning (D&D), and environmental restoration/cleanup project types. The tool’s elements and associated criteria are tailored for each project type; although some elements, such as cost estimating and scheduling, are used in common. The tool is easy to use, requiring little or no training. It provides a common assessment tool for project self-appraisals and independent project reviews. It promotes efficiency and reduces disagreements and unnecessary effort. A comprehensive array of elements covers the gamut of cost, schedule, scope/technical, and safety/security ensuring that no important project attributes are overlooked. The tool is adaptable for use by any organization.

97 MATHEMATICS AND COMPUTING↗