Long-term Benthic Macroinvertebrate Community Monitoring to Assess Pollution Abatement Effectiveness
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R and D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.
An in depth understanding of the collective modes that can be excited in a wide range of high-energy plasmas is necessary to advance nuclear fusion research in parallel with other fields that include space and astrophysics in particular. Important achievements are shown to have resulted from implementing programs based on this reality, maintaining a tight connection with different areas of investigations. This involves the undertaking of a plurality of experimental approaches aimed at understanding the physics of fusion burning plasmas. At present, the most advanced among these is the Ignitor experiment involving international cooperation, that is designed to investigate burning plasma regimes near ignition for the first time.
While demand response programs implement energy efficiency and power quality objectives, they bring potential security threats to the Smart Grid. The ability to influence load in a system enables attackers to cause system failures and impacts the quality and integrity of power delivered to customers. This paper presents a security mechanism to monitor and control load according to a set of security policies during normal system operation. The mechanism monitors, detects, and responds to load altering attacks. We examined the security requirements of Smart Grid stakeholders and constructed a set of load control policies enforced by the mechanism. We implemented a proof of concept prototype and tested it using the simulation environment. By enforcing the proposed policies in this prototype, the system is maintained in a safe state in the presence of load drop attacks.
This program implements a novel algorithm to obtain the density of state of a physical system, expanded in a chosen basis set. Unlike existing algorithms that return the density of states as a numerical array, this algorithm avoids binning of a continuous variable and is able to express the density of states in an analytical form. It is thus suitable for the study of the statistical mechanics and thermodynamic properties of physical systems where the density of a continuous state variable is of interest. The new algorithm presented here is a special reweighting method in classical Monte Carlo approaches. In particular, it can be regarded as a descendant and a hybrid method closely related to the multicanonical method and Wang--Landau sampling.
This program implements tetrahedral meshing for implicitly-defined geometries, focusing on meshing unions of geometric primitives like spheres and cylinders. This enables users to quickly generate quality meshes of truss lattice and filament structures.
Paper presented at 16th International Conference on Greenhouse Gas Control Technologies (GHGT-16), October 23–27, 2022, Lyon, France. Overcoming data acquisition challenges associated with a lake in the study area, electrical infrastructure around the plant, noise from mine activities, complex near-surface conditions associated with reclaimed mine land, high wind speed, and extremely cold temperatures, data processing, modeling, and inversion of the baseline geophysical data demonstrated the importance of high-quality data for a CO 2 geophysical monitoring program. Implementing more advanced data acquisition and processing techniques in future monitoring surveys can further improve confidence in interpretations of geophysical survey data.
This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.
In September of 2012 the Plutonium Sustainment program at LANL completed or addressed the following high-level activities: 1) Completed assembly, inspection, packing, and approvals for Pollux. Completed shipment to DAF in early October in accordance with the Gemini Core Team’s schedule. 2) Delivered the draft Program Implementation Plan and revised repeatedly. 3) Met with Kansas City Plant staff to “kick-off” the non-nuclear pit-component production mission. All MRT L2 Milestones 4195-4198 or the relevant PBIs associated with Plutonium Sustainment have been met and evidence packages submitted. The year-end budget/performance indices were 0.96 (S.P.I.) and 1.00 (C.P.I.). Table 1 identifies all Baseline Change Requests (BCRs) that were initiated, in process, or completed during the month. The earned value metrics overall for LANL are within acceptable thresholds, so no high-level recovery plan is required. Note that the planned (budget) and earned value for September includes planned carryover holdbacks (no allocation) with no associated FY12 costs. This has a minor (positive) impact on S.P.I. and a significant (positive) impact on the C.P.I. For Pu Sustainment overall, the C.P.I. in September neglecting the $10.75M holdback is 0.90. Likewise, the C.P.I. for FY12 is 1.004. With the facility infrastructure element removed, the C.P.I. in September becomes 0.92. Likewise, the C.P.I. for FY12 is 0.992. Again neglecting the holdback, the S.P.I. numbers for Pu Sustainment overall are 0.94 (Sept) and 0.96 (FY12) and with the facility infrastructure element removed 0.95 (Sept) and 0.95 (FY12).
This study seeks to provide policymakers and other stakeholders with actionable information towards a road map for reducing energy consumption cost-effectively. We focus on individual end use equipment types (hereafter referred to as appliance groups) that might be the subject of policies - such as labels, energy performance standards, and incentives - to affect market transformation in the short term, and on high-efficiency technology options that are available today. the high efficiency or Business Case scenario is constructed around a model of cost-effective efficiency improvement. Our analysis demonstrates that a significant reduction in energy consumption and emissions is achievable at net negative cost, that is, as a profitable investment for consumers. Net savings are calculated assuming no additional costs to energy consumption such as carbon taxes. Savings relative to the base case as calculated in this way is often referred to as “economic savings potential”. So far, the Indian market has responded favorably to government efficiency initiatives, with Indian manufacturers producing a higher fraction of high-efficiency equipment than before program implementation. This study highlights both the financial benefit and the scope of potential impact for adopting this equipment, all of which is already readily available on the market. The approach of the study is to assess the impact of short-term actions on long-term impacts. “Short-term” market transformation is assumed to occur by 2015, while “long-term” energy demand reduction impacts are assessed in 2030. In the intervening years, most but not all of the equipment studied will turn over completely. The Business Case concentrates on technologies for which cost-effectiveness can be clearly demonstrated.
In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOE’s program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.
The U.S. Department of Energy’s (DOE) Building America program implemented a new Codes and Standards Innovation (CSI) Team in 2013. The Team’s mission is to assist Building America (BA) research teams and partners in identifying and resolving conflicts between Building America innovations and the various codes and standards that govern the construction of residences. A CSI Roadmap was completed in September, 2013. This guidance document was prepared using the information in the CSI Roadmap to provide BA research teams and partners with specific information and approaches to identifying and overcoming potential barriers to Building America (BA) innovations arising in and/or stemming from codes, standards, and rating methods. For more information on the BA CSI team, please email: CSITeam@pnnl.gov
The Southern Energy Efficiency Center (SEEC) builds collaborative partnerships with: state and local governments and their program support offices, the building delivery industry (designers, contractors, realtors and commissioning agents), product manufacturers and their supply chains, utilities and their program implementers, consumers and other stakeholders in order to forge a strong regional network of building energy efficiency allies. Through a project Steering Committee composed of the state energy offices and building industry stakeholders, the SEEC works to establish consensus-based goals, priorities and strategies at the regional, state and local levels that will materially advance the deployment of high-performance “beyond code” buildings. In its first Phase, SEEC will provide limited technical and policy support assistance, training, certification and education to a wide spectrum of the building construction, codes and standards, and the consumer marketplace.
This document describes an action plan for advancing the state of the art of commercial building energy benchmarking in the Indian context. The document is primarily intended for two audiences: (a) Research and development (R&D) sponsors and researchers can use the action plan to frame, plan, prioritize and scope new energy benchmarking R&D in order to ensure that their research is market relevant; (b) Policy makers and program implementers engaged in the deployment of benchmarking and building efficiency rating programmes can use the action plan for policy formulation and enforcement .
Almost half of the world’s population still cooks on biomass cookstoves of poor efficiency and primitive design, such as three stone fires (TSF). Emissions from biomass cookstoves contribute to adverse health effects and climate change. A number of “improved cookstoves” with higher energy efficiency and lower emissions have been designed and promoted across the world. During the design development, and for selection of a stove for dissemination, the stove performance and emissions are commonly evaluated, communicated and compared using the arithmetic average of replicate tests made using a standardized laboratory-based test, commonly the water boiling test (WBT). However, published literature shows different WBT results reported from different laboratories for the same stove technology. Also, there is no agreement in the literature on how many replicate tests should be performed to ensure “significance” in the reported average performance. This matter has not received attention in the rapidly growing literature on stoves, and yet is crucial for estimating and communicating the performance of a stove, and for comparing the performance between stoves. We present results of statistical analyses using data from a number of replicate tests of performance and emission of the Berkeley-Darfur Stove (BDS) and the TSF under well-controlled laboratory conditions. We observed moderate variability in the test results for the TSF and BDS when measuring several characteristics. Here we focus on two as illustrative: time-to-boil and PM2.5 (particulate matter less than or equal to 2.5 micrometers in diameter) emissions. We demonstrate that interpretation of the results comparing these stoves could be misleading if only a small number of replicates had been conducted. We then describe a practical approach, useful to both stove testers and designers, to assess the number of replicates needed to obtain useful data. Caution should be exercised in attaching high credibility to results based on only a few replicates of cookstove performance and emissions. Stove designers, testers, program implementers and decision makers should all benefit from improved awareness of the importance of adequate number of replicates required to produce practically useful test data.
The purpose of this charter is to establish, maintain, and implement programs for the protection, preservation, and enhancement of the land and water resources of Los Alamos National Laboratory in a changing climate.
Cree, Inc. conducted a narrow-band downconverter (NBD) materials development and implementation program which will lead to warm-white LED light engines with enhanced efficacy via improved spectral efficiency with respect to the human eye response. New red (600-630nm) NBD materials could result in as much as a 20% improvement in warm-white efficacy at high color quality relative to conventional phosphor-based light sources. Key program innovations included: high quantum yield; narrow peak width; minimized component-level losses due to “cross-talk” and light scattering among red and yellow-green downconverters; and improved reliability to reach parity with conventional phosphors. NBD-enabled downconversion efficiency gains relative to conventional phosphors yielded an end-of-project LED light engine efficacy of >160 lm/W at room temperature and 35 A/cm2, with a correlated color temperature (CCT) of ~3500K and >90 CRI (Color Rending Index). NBD-LED light engines exhibited equivalent luminous flux and color point maintenance at >1,000 hrs. of highly accelerated reliability testing as conventional phosphor LEDs. A demonstration luminaire utilizing an NBD-based LED light engine had a steady-state system efficacy of >150 lm/W at ~3500K and >90 CRI, which exceeded the 2014 DOE R&D Plan luminaire milestone for FY17 of >150 lm/W at just 80 CRI.
Integrated demand-side management (IDSM) is a strategic approach to designing and delivering a portfolio of demand side management (DSM) programs to customers. IDSM typically delivers customer centric strategies with the goal of increasing the amount of DSM in the field, but doing so in a way that integrates various measures and technologies to improve their collective performance and/or penetration. Specifically, IDSM can be defined as the integrated or coordinated delivery of three or more of: (1) energy efficiency (EE), (2) demand response (DR), (3) distributed generation (DG), (4) storage, (5) electric vehicle (EV) technologies, and (6) time-based rate programs to residential and commercial electric utility customers. The electric industry’s limited experience deploying IDSM to date suggests that significant barriers may exist. This report explores recent electric utility experience with IDSM to provide an assessment of the barriers and potential benefits perceived or experienced by program administrators in their attempts to implement integrated programs. The research draws on surveys and interviews with eleven staff from a sample of eight DSM program administrators and program implementers who were currently implementing or had previously attempted to implement an IDSM program or initiative. Respondents provided their perspectives on drivers for IDSM and barriers to broader deployment. They also reported on actions they had undertaken to promote expanded delivery of IDSM and provided their assessments of the most important under-tapped opportunities for expanding IDSM efforts, both for program administrator and regulatory organizations.