Search NASA⌕ Search

SEARCH · Search NASA

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Risk Acceptance Personality Paradigm: How We View What We Don't Know We Don't Know

The purpose of integrated hazard analyses, probabilistic risk assessments, failure modes and effects analyses, fault trees and many other similar tools is to give managers of a program some idea of the risks associated with their program. All risk tools establish a set of undesired events and then try to evaluate the risk to the program by assessing the severity of the undesired event and the likelihood of that event occurring. Some tools provide qualitative results, some provide quantitative results and some do both. However, in the end the program manager and his/her team must decide which risks are acceptable and which are not. Even with a wide array of analysis tools available, risk acceptance is often a controversial and difficult decision making process. And yet, today's space exploration programs are moving toward more risk based design approaches. Thus, risk identification and good risk assessment is becoming even more vital to the engineering development process. This paper explores how known and unknown information influences risk-based decisions by looking at how the various parts of our personalities are affected by what they know and what they don't know. This paper then offers some criteria for consideration when making risk-based decisions.

Massie, Michael J.↗

Graphic visualization of program performance aids management review

Chart technique /PERTREE/ which displays the essential status elements of a PERT system in a vertical flow array, of high graphic quality, enables visual review by management of program performance. Since the display is versatile, it can accommodate any aspect of the program which the presenter wishes to accent.

Eisenhart, G. N.↗

Technical facilities catalog, volume II

This Technical Facilities Catalog has been developed in response to an increasing demand for general and specific information on NASA technical facilities. The Catalog is intended to: a)provide NASA management, facilities managers, program and project managers, individual research engineers and scientists, and other agencies of the Government with knowledge of existing NASA research, development, test and evaluation facilities and b)provide the reader with a basic concept of the capabilities and functions of the wide variety of NASA technical facilities and the technological areas they support.

Wind tunnel↗

Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)

I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.

risk managment↗

How Management and Leadership Training Can Impact a Health System: Evaluation Findings From a Public Health Management Training Program in Cambodia

In 2017, the National Institute of Public Health in Cambodia collaborated with the U.S. Centers for Disease Control and Prevention to provide management and leadership training for 20 managers and senior staff from 10 health centers. We conducted a mixed methods evaluation of the program's outcomes and impact on the graduates and health centers. From June 2018 (baseline) to January 2019 (endpoint), we collected data from a competency assessment, observational visits, and interviews. From baseline to endpoint, all 20 participants reported increased competence in seven management areas. Comparing baseline and endpoint observational visits, we found improvements in leadership and governance, health workforce, water, sanitation, and hygiene, and health centers' use of medical products and technologies. When evaluating the improvements made by participants against the World Health Organization's key components of a well-functioning health system, the program positively contributed toward building four of the six components—leadership and governance, health information systems, human resources for health, and service delivery. While these findings are specific to the context of Cambodian health centers, we hope this evaluation adds to the growing body of research around the impact of skilled public health management on health systems.

60 APPLIED LIFE SCIENCES↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A

A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

Edward J. Hoffman↗

Guidelines for development of NASA (National Aeronautics and Space Administration) computer security training programs

The report presents guidance for the NASA Computer Security Program Manager and the NASA Center Computer Security Officials as they develop training requirements and implement computer security training programs. NASA audiences are categorized based on the computer security knowledge required to accomplish identified job functions. Training requirements, in terms of training subject areas, are presented for both computer security program management personnel and computer resource providers and users. Sources of computer security training are identified.

Tompkins, F. G.↗

Advanced program development management software system. Software description and user's manual

The objectives of this project were to apply emerging techniques and tools from the computer science discipline of paperless management to the activities of the Space Transportation and Exploration Office (PT01) in Marshall Space Flight Center (MSFC) Program Development, thereby enhancing the productivity of the workforce, the quality of the data products, and the collection, dissemination, and storage of information. The approach used to accomplish the objectives emphasized the utilization of finished form (off-the-shelf) software products to the greatest extent possible without impacting the performance of the end product, to pursue developments when necessary in the rapid prototyping environment to provide a mechanism for frequent feedback from the users, and to provide a full range of user support functions during the development process to promote testing of the software.

Source record↗

Global Temperature and Salinity Pilot Project

Data exchange and data management programs have been evolving over many years. Within the international community there are two main programs to support the exchange, management and processing of real time and delayed mode data. The Intergovernmental Oceanographic Commission (IOC) operate the International Oceanographic Data and Information Exchange (IODE) program which coordinates the exchange of delayed mode data between national oceanographic data centers, World Data Centers and the user community. The Integrated Global Ocean Services System is a joint IOC/World Meteorological Organization (WMO) program for the exchange and management of real-time data. These two programs are complemented by mechanisms that have been established within scientific programs to exchange and manage project data sets. In particular TOGA and WOCE have identified a data management requirement and established the appropriate infrastructure to achieve this. Where GTSPP fits into this existing framework is discussed.

Searle, Ben↗

LeRC reduced gravity fluid management technology program

The program reviewed in the present paper has provided information of the reduced-gravity behavior of fluids, thermal control of cryogenic tankage, and fluid management system design. The studies are currently shifting from the utilization of in-house experimental facilities to the development of Spacelab experiments. The cryogenic fluid management experiment, currently undergoing detailed design, is expected to provide an orbital evaluation of a subcritical liquid hydrogen storage and supply system, as part of the Shuttle/Spacelab program. Efforts are continuing to develop computer techniques for simulating reduced-gravity fluid dynamic processes.

Aydelott, J. C.↗

Human Systems Integration (HSI) Framework and Training - Shifting the View of HSI for Better Implementation

The Implementation of Human Systems Integration (HSI) presents challenges within the acquisition community for two reasons. The first is that misconceptions of HSI still exist, with many Program Managers (PMs) and leadership uncertain of the value or where to begin. The second is due to an unbalanced approach to HSI in its own framework. These implementation challenges lead to barriers in the early prevention of mishaps. Understanding HSI practices and how they should be implemented in the Acquisition Product Life Cycle (PLC) has been a challenge across the government, leaving the value of HSI unknown and misunderstood with Program Managers. In the case for many acquisition programs, HSI is not implemented in early design, losing the perspective on human capabilities and limitations, creating impacts on human-centered design. Expectations in human performance are not clearly set and operations are baselined with no margin for changes in technology and processes that will affect system performance. The HSI framework addresses total system performance holistically using collaboration as the primary tool. The goal is to create a system with efficiencies while minimizing risk to the operators, maintainers, and support personnel, as well as any collateral personnel and systems. To accomplish this, HSI should be implemented as part of preemptive measures to minimize potential human error and mishaps during the operation phase. Investigative and assessment tools exist that consider events, issues, and other outside influences of a system that may not fall under the current construct of the HSI domains, leaving gaps in early HSI implementation and affecting the prevention of human errors and mishaps. This presentation will outline what NASA HSI is doing to support Early HSI implementation and Operational Performance shifts that affect human performance.

Anthony T Thomas↗

The NASA cryogenic fluid management technology program plan

During the past three decades, NASA has been designing and using large quantities of cryogenic fluids for propulsion system propellants, coolants for experiments, and for environmental control systems. As a consequence, an erroneous conclusion has been drawn that the technology exists for using large quantities of cryogens in space for long periods of time. The attempt here is to dispel that myth and to present the technology needs that require development in order to support the NASA programs of the future. A NASA program, developed through the impetus of the Marshall Space Flight Center and the Lewis Research Center and supported by all NASA centers is outlined. The current state of the art is discussed along with specific needs for near future missions. Then, using the Space Exploration Initiative mission set, cost/benefit projections are made for the development of advanced cryogenic fluid management techniques. Earth based and space based test programs are discussed relative to the technology requirements for liquid storage, supply, and transfer for fluid transfer and advanced instrumentation.

Faddoul, James R.↗

Results of the automated power systems management /APSM/ program and future technology implementation

The APSM program was initiated in 1975. The purpose of this program was to develop and demonstrate the technology and benefits of autonomous operation of planetary spacecraft power systems to meet the projected requirements of future missions. Development of the APSM program was based on implementing a selected set of autonomous functions in a state-of-the-art breadboard power system. A distributed microcomputer system was developed to implement the functions. Several critical programmatic elements were identified as necessary to implement autonomous functions. These elements, including proper skill combination, well defined autonomous functions, and management of the software design and development task, were found to be more significant than hardware management. The incorporation of APSM technology in future space programs is also discussed.

Bridgeforth, A. O.↗

Documenting the Development of Software

Some routine supervisory functions performed automatically. Program Management Facility (PMF) computer program integrated software-development and control system. Applicable to large software systems involving as many as several hundred programmers and one million lines of codes, it ensures timely and orderly planning, development, implementation, and documentation of software. Designed as support tool. Has many features providing efficient processing and utilization of space for development programmer. Incorporates security system to prevent improper maintenance. Provides full set of cross-referenced reports and supervisory functions for detailed management information. Written in assembler. IBM program TSO required.

Source record↗

FEMP Facility Evaluation (Audit) Decision Tree

This document is a resource to be used in concert with FEMP Audit Definitions, FEMP Consolidated Facility Management Guidance, and agency best practices and expert judgment—for agencies to use to determine the best approaches to evaluate their facilities. It features a decision tree that provides a framework for agencies to interpret gathered facility data to understand the existing conditions; benchmark the facility against others in the portfolio to determine whether an on-site or remote audit is appropriate for a facility; determine the best remote or on-site audit level of detail to meet agency facility auditing goals, such as meeting Energy Independence and Security Act of 2007 requirements and developing projects; and improve their energy and water management programs.

auditing↗