Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Miserable Risk Estimation: “Managing” Low-Probability, High-Consequence Risks

As with all bold endeavors, NASA missions must identify and manage their risks. While estimating the consequences of these risks is typically straightforward, it can be challenging to estimate their likelihood. This is especially true for low-probability risks, due both to the lack of operational data and the cognitive biases humans bring to risk estimation. In this talk, I will present both a tongue-in-cheek and “Management Science” approach to estimating low-probability, high-consequence risks. I then summon my Human Factors colleagues to provide NASA mission managers with the gentle guidance needed to avoid common errors in risk assessment

Mary K Kaiser↗

Risk-Informed Decision Making: Application to Technology Development Alternative Selection

NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.

Dezfuli, Homayoon↗

Risky Business

During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.

Yarbrough, Katherine↗

Cross-Cutting Risk Framework: Mining Data for Common Risks Across the Portfolio

The National Aeronautics and Space Administration (NASA) defines risk management as an integrated framework, combining risk-informed decision making and continuous risk management to foster forward-thinking and decision making from an integrated risk perspective. Therefore, decision makers must have access to risks outside of their own project to gain the knowledge that provides the integrated risk perspective. Through the Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) Business Change Initiative (BCI), risks were integrated into one repository to facilitate access to risk data between projects. With the centralized repository, communications between the FPD, project managers, and risk managers improved and GSFC created the cross-cutting risk framework (CCRF) team. The creation of the consolidated risk repository, in parallel with the initiation of monthly FPD risk managers and risk governance board meetings, are now providing a complete risk management picture spanning the entire directorate. This paper will describe the challenges, methodologies, tools, and techniques used to develop the CCRF, and the lessons learned as the team collectively worked to identify risks that FPD programs projects had in common, both past and present.

risk-informed decision making↗

The Role of Space Medicine in Management of Risk in Spaceflight

The purpose of Space Medicine is to ensure mission success by providing quality and comprehensive health care throughout all mission phases to optimize crew health and performance and to prevent negative long-term health consequences. Space flight presents additional hazards and associated risks to crew health, performance, and safety. With an extended human presence in space it is expected that illness and injury will occur on orbit, which may present a significant threat to crew health and performance and to mission success. Maintaining crew health, safety and performance and preventing illness and injury are high priorities necessary for mission success and agency goals. Space flight health care should meet the standards of practice of evidence based clinical medicine. The function of Space Medicine is expected to meet the agency goals as stated in the 1998 NASA Strategic Plan and the priorities established by the Critical Path Roadmap Project. The Critical Path Roadmap Project is an integrated NASA cross-disciplinary strategy to assess, understand, mitigate, and manage the risks associated with long-term exposure to the space flight environment. The evidence based approach to space medicine should be standardized, objective process yielding expected results and establishing clinical practice standards while balancing individual risk with mission (programmatic) risk. The ability to methodically apply available knowledge and expertise to individual and mission health issues will ensure appropriate priorities are assigned and resources are allocated. NASA Space Medicine risk management process is a combined clinical and engineering approach. Competition for weight, power, volume, cost, and crew time must be balanced in making decisions about the care of individual crew with competing agency resources.

Clark, Jonathan B.↗

Lay and Expert Perceptions of Planetary Protection

As space scientists and engineers plan new missions to Mars and other planets in our solar system, they will face critical questions about the potential for biological contamination of planetary surfaces. In a society that places ever-increasing importance on the role of public involvement in science and technology policy, questions about risks of biological contamination will be examined and debated in the media, and will lead to the formation of public perceptions of planetary-contamination risks. These perceptions will, over time, form an important input to the development of space policy. Previous research in public and expert perceptions of technological risks and hazards has shown that many of the problems faced by risk-management organizations are the result of differing perceptions of risk (and risk management) between the general public and scientific and technical experts. These differences manifest themselves both as disagreements about the definition (and level) of risk associated with a scientific, technological or industrial enterprise, and as distrust about the ability of risk-management organizations (both public and private) to adequately protect people's health and safety. This report presents the results of a set of survey studies designed to reveal perceptions of planetary exploration and protection from a wide range of respondents, including both members of the general public and experts in the life sciences. The potential value of this research lies in what it reveals about perceptions of risk and benefit that could improve risk-management policies and practices. For example, efforts to communicate with the public about Mars sample return missions could benefit from an understanding of the specific concerns that nonscientists have about such a mission by suggesting areas of potential improvement in public education and information. Assessment of both public and expert perceptions of risk can also be used to provide an advanced signal of aspects of planetary exploration and protection that may be particularly sensitive or controversial and that could prove problematic from a risk-management standpoint, perhaps warranting a more stringent risk-management approach than would otherwise be the case based on technical considerations alone. The design of the study compares perceptions and attitudes about space exploration relevant to a Mars sample return mission between three respondent groups: (1) members of The Planetary Society, a group representing individuals with a strong interest in space-related issues, (2) a group of university-aged students, representing a population relatively sensitive to environmental hazards, and (3) a group of life scientists outside of the space research community. Members of The Planetary Society received the survey as part of a special issue of The Planetary Report on planetary protection, which contained a number of background articles on planetary protection and related topics. A synopsis of the issue was prepared as an introduction to the survey for the other two groups.

Race, Margaret S.↗

Program Risk Planning with Risk as a Resource

The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

Ray, Paul S.↗

Assurance of Fault Management: Risk-Significant Adverse Condition Awareness

Fault Management (FM) systems are ranked high in risk-based assessment of criticality within flight software, emphasizing the importance of establishing highly competent domain expertise to provide assurance for NASA projects, especially as spaceflight systems continue to increase in complexity. Insight into specific characteristics of FM architectures seen embedded within safety- and mission-critical software systems analyzed by the NASA Independent Verification Validation (IVV) Program has been enhanced with an FM Technical Reference (TR) suite. Benefits are aimed beyond the IVV community to those that seek ways to efficiently and effectively provide software assurance to reduce the FM risk posture of NASA and other space missions. The identification of particular FM architectures, visibility, and associated IVV techniques provides a TR suite that enables greater assurance that critical software systems will adequately protect against faults and respond to adverse conditions. The role FM has with regard to overall asset protection of flight software systems is being addressed with the development of an adverse condition (AC) database encompassing flight software vulnerabilities.Identification of potential off-nominal conditions and analysis to determine how a system responds to these conditions are important aspects of hazard analysis and fault management. Understanding what ACs the mission may face, and ensuring they are prevented or addressed is the responsibility of the assurance team, which necessarily should have insight into ACs beyond those defined by the project itself. Research efforts sponsored by NASAs Office of Safety and Mission Assurance defined terminology, categorized data fields, and designed a baseline repository that centralizes and compiles a comprehensive listing of ACs and correlated data relevant across many NASA missions. This prototype tool helps projects improve analysis by tracking ACs, and allowing queries based on project, mission type, domain component, causal fault, and other key characteristics. The repository has a firm structure, initial collection of data, and an interface established for informational queries, with plans for integration within the Enterprise Architecture at NASA IVV, enabling support and accessibility across the Agency. The development of an improved workflow process for adaptive, risk-informed FM assurance is currently underway.

Software Verification & Validation↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the moon and eventually enable a human Mars mission. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the crew health and performance (CHP) research and technology development (R&D) necessary to enable these future missions. These organizations include flight programs as well as other organizations such as the Health and Medical Technical Authority (HMTA), Human Research Program, Space Technology Mission Directorate, and System Capability Leadership Teams, each of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for the management of risks and strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA for identifying and prioritizing R&D needs. Alignment and evolution of these strategic planning constructs is ongoing and will allow for alignment and traceability between M2M objectives and R&D investments at a detailed level. While this reorganization is ongoing, and even after it is established, there is a recognized need among stakeholder organizations to identify and communicate the highest CHP R&D priorities in a unified and digestible way that synthesizes the considerations and perspectives of the CHP community across NASA. To achieve this, the HMTA facilitated a series of group discussions with representatives of NASA’s CHP community, which culminated in a product identifying the eight highest priority mission-enabling CHP capabilities for human missions to Mars, referred to as the “Top Human System Capability Needs for Mars”. The list includes Earth-Independent Human Operations; Mars Duration Food System; Mars Duration Effects on Human Physiology; Risks Mitigations for Vehicle Atmospheres; Computational Injury & Anthropometric Models; Exploration Exercise Countermeasures; Individual Variability in Responses to Spaceflight; and Sensorimotor Countermeasures. Existing strategic planning and risk management tools and processes were considered, as well as practicalities of technical, cost, and schedule feasibility associated with potential R&D risk mitigations and technology solutions. The product is not owned by any one organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. It is anticipated that this list will be re-evaluated periodically based on R&D progress and the evolving M2M architecture.

Life Support↗

Dynamic systems-engineering process - The application of concurrent engineering

A system engineering methodology is described which enables users, particulary NASA and DOD, to accommodate changing needs; incorporate emerging technologies; identify, quantify, and manage system risks; manage evolving functional requirements; track the changing environment; and reduce system life-cycle costs. The approach is a concurrent, dynamic one which starts by constructing a performance model defining the required system functions and the interrelationships. A detailed probabilistic risk assessment of the system elements and their interrelationships is performed, and quantitative analysis of the reliability and maintainability of an engineering system allows its different technical and process failure modes to be identified and their probabilities to be computed. Decision makers can choose technical solutions that maximize an objective function and minimize the probability of failure under resource constraints.

Wiskerchen, Michael J.↗

STGT program: Ada coding and architecture lessons learned

STGT (Second TDRSS Ground Terminal) is currently halfway through the System Integration Test phase (Level 4 Testing). To date, many software architecture and Ada language issues have been encountered and solved. This paper, which is the transcript of a presentation at the 3 Dec. meeting, attempts to define these lessons plus others learned regarding software project management and risk management issues, training, performance, reuse, and reliability. Observations are included regarding the use of particular Ada coding constructs, software architecture trade-offs during the prototyping, development and testing stages of the project, and dangers inherent in parallel or concurrent systems, software, hardware, and operations engineering.

Usavage, Paul↗

The Acquisition Process as a Vehicle for Enabling Knowledge Management in the Lifecycle of Complex Federal Systems

This white paper explores how to increase the success and operation of critical, complex, national systems by effectively capturing knowledge management requirements within the federal acquisition process. Although we focus on aerospace flight systems, the principles outlined within may have a general applicability to other critical federal systems as well. Fundamental design deficiencies in federal, mission-critical systems have contributed to recent, highly visible system failures, such as the V-22 Osprey and the Delta rocket family. These failures indicate that the current mechanisms for knowledge management and risk management are inadequate to meet the challenges imposed by the rising complexity of critical systems. Failures of aerospace system operations and vehicles may have been prevented or lessened through utilization of better knowledge management and information management techniques.

Stewart, Helen↗

Determining the Relative Criticality of Diverse Exploration Risks in NASA's Human Research Program

The mission of NASA s Human Research Program (HRP) is to understand and reduce the risk to crew health and performance in exploration missions. The HRP addresses 27 specific risks, primarily in the context of Continuous Risk Management. Each risk is evaluated in terms of two missions (a six month stay on the Moon and a thirty month round trip to Mars) and three types of consequences (in-mission crew health, post-mission crew health, and in-mission performance). The lack of a common metric between the three consequence scales, such as financial costs or quality adjusted life years lost, makes it difficult to compare the relative criticality of the risks. We are, therefore, exploring the use of a ternary scale of criticality based on the common metric of influencing an operational decision. The three levels correspond to the level of concern the risk generates for a "go/no-go" decision to launch a mission: 1) no-go; 2) go with significant reservations; 3) go. The criticality of each of the 27 risks is scored for the three types of consequence in both types of mission. The scores are combined to produce an overall criticality rating for each risk. The overall criticality rating can then be used to guide the prioritization of resources to affect the greatest amount of risk reduction.

Kundrot, Craig E.↗

Web Application Software for Ground Operations Planning Database (GOPDb) Management

A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

Lanham, Clifton↗

An Ontological Approach to Integrate Commercial Space Operations with an In-time Aviation Safety Management System (IASMS)

The emergence of commercial space operations (CSO) is one of many Advanced Air Mobility domains that pose major challenges to in-time safety assurance because of the different architectures used by the operators and other agents. The National Academies recognized the need to improve integration of disparate architectures and recommended that an In-time Aviation Safety Management System(IASMS) be developed to provide seamless connectivity across interacting architectures and enable in-time safety assurance. An ontological approach to integrating CSO with IASMS involves in-time Services, Functions, and Capabilities design to manage operational risks and inform changes to design. The resulting integrated architecture provides a common basis for risk management and in-time safety assurance.

K Ellis↗

Directed Acyclic Graph Guidance Documentation

For over a decade, the National Aeronautics and Space Administration (NASA) has tracked and configuration-managed approximately 30 risks to astronaut health and performance that occur before, during and after spaceflight. The Human System Risk Board (HSRB), a Health and Medical Technical Authority (HMTA) Board at NASA Johnson Space Center, is the entity responsible for identifying, assessing, analyzing, and monitoring the official understanding of the risk or risk posture for each of the Human System Risks and determining – based on evaluation of the available evidence – when that risk posture changes. The ultimate purpose of tracking and researching these risks is to find ways to reduce the risk that astronaut crews face during spaceflight. Historically, research, development and operations relevant to one risk have been conducted in isolation from other risks; these individual risk ‘silos’ enabled initial characterization of each specific risk. In spaceflight however, the impact of exposure to risk for astronaut crews is cumulative, and not independent of exposures or other risks, as all the adverse effects of the spaceflight environment begin at launch, continue throughout the duration of the mission and in some cases across the lifetime of the crews. In January of 2020, the HSRB at NASA embarked on a pilot project designed to assess the potential value of causal diagramming as a tool to facilitate understanding these cumulative and interdependent effects as applied within Human System Risk management. This process uses directed acyclic graphs as a means of formalizing a shared mental model of the causal flow of risk among Risk Board stakeholders. Initially this model was to improve communication among those stakeholders, but the potential value exceeds communication alone. Formalization of the process for creating these causal diagrams will enable the creation of a composite risk network that is vetted by members of the NASA community and configuration managed. The causal diagrams are formulated as directed acyclic graphs (DAGs) to function as a type of knowledge graph for reference for the board and its stakeholders. This document outlines the pilot process, the standardized approaches, and guidance for risk custodian teams when creating and updating DAGs as a part of the NASA Human System Risk Management process.

Risk↗

System Risk Balancing Profiles: Software Component

The Software QA / V&V guide will be reviewed and updated based on feedback from NASA organizations and others with a vested interest in this area. Hardware, EEE Parts, Reliability, and Systems Safety are a sample of the future guides that will be developed. Cost Estimates, Lessons Learned, Probability of Failure and PACTS (Prevention, Avoidance, Control or Test) are needed to provide a more complete risk management strategy. This approach to risk management is designed to help balance the resources and program content for risk reduction for NASA's changing environment.

Kelly, John C.↗

Managing the Risk for Early Onset Osteoporosis in Long-Duration Astronauts Due to Spaceflight

Early Onset Osteoporosis is probably the most recognized but poorly understood long-term health risk due to spaceflight. Osteoporosis management is primarily prophylactic and clinical interventions rely upon the ability to predict fractures which is currently determined by surrogate measures of bone strength. The RMAT for Early Onset Osteoporosis identified some open issues related to the fact that long-duration astronauts compose a unique group of subjects for which clinical approaches for osteoporosis management do not apply. Long-duration astronauts are healthy, young (25 to 55 years of age), predominantly male, and physical fit relative to the typical osteoporosis patient. Moreover, during prolonged space missions (typically 6-month missions) the skeleton not only adapts to weightlessness, but is influenced by numerous risk factors induced by operational constraints, e.g., inability to maintain preflight weight-bearing and aerobic activities, sub-optimal dietary intake (e.g., high sodium content for food stability, lack of fresh fruit and vegetables), suppression of vitamin D metabolism by uv shielding, and remote medicine care. Moreover, adaptation results in novel changes to astronauts bones that cannot be detected by current medically-useful measures. Consequently, a panel of clinicians (recognized leaders and policy-makers in osteoporosis) was convened to review the dataset of bone measures and bone loss risk factors in long-duration astronauts. Driven by the queries in the RMAT, the panel was charged to determine 1) if an intervention is required to prevent this risk, 2) what type and at what time would intervention be optimal, 3) what is the clinical trigger that would require a medical response from flight surgeons and 4) how should research data be used in the clinical care of astronauts. Hence, the RMAT determined that a bone health policy need to be formulated specific for this unique cohort subjected to a novel skeletal condition

Sibonga, Jean D.↗