Search NASA⌕ Search

SEARCH · Search NASA

Results for “roads and infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

202 records · Page 12

NEXT Generation Energy Technologies for Connected and Automated On-Road Vehicles (NEXTCAR Phase I & II)

The Ohio State University’s ARPA-E NEXTCAR project was a multi-phase, multi-year research, development, and demonstration program focused on improving the energy efficiency of connected and automated vehicles (CAVs). The team developed and validated advanced vehicle motion and powertrain control algorithms that coordinate propulsion and automation systems to optimize energy use. Key technologies included Dynamic Skip Fire engine control, predictive eco-driving functions such as Eco-Approach and Departure (Eco-AND) and Eco-Adaptive Cruise Control (Eco-ACC), and powertrain-agnostic optimization frameworks for hybrid, plug-in hybrid, and battery electric vehicles. The project successfully demonstrated up to 30% energy-efficiency improvement during real-world testing at the Transportation Research Center and the American Center for Mobility. The outcomes provide a foundation for scalable, cost-effective deployment of energy-optimized CAV technologies across the automotive industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

Sustainable Aviation Fuels from 30,000 feet – Scoping Report

A literature review, first principles analysis, and mapping of the airline-fuel infrastructure were performed to reassess the potential for various means of realizing a sustainable aviation sector. The literature review found a plethora of technical methods to make the airline industry net-zero CO 2 but limited work on the emergent barriers to sustainable aviation implementation such as land use, repurposing of fuel refining assets, and airline cost structures. First principles analyses of the energy, land, and costs of three broad net-zero strategies were performed to determine if sustainable aviation is feasible even in the most optimistic scenarios. Those methods were biomass-derived sustainable aviation fuel (SAF), fuel produced from CO 2 captured from the air and H 2 produced from water electrolysis (air-to-fuel: ATF), and offsetting fossil-derived Jet Fuel with carbon dioxide removal from the atmosphere (direct air capture and storage: DACS). Offsetting CO 2 emissions from using fossil Jet Fuel with DACS was found to consume the least energy, require the smallest quantity of land, and be the cheapest option. Replacing Jet Fuel with SAF was found to be only slightly more expensive than DACS but require substantially more land. ATF was found to be the most expensive and energy intensive option, though it did spare land relative to SAF. We found that calls to utilize waste biomass are well-founded, but wastes alone cannot cover the needs of the global airline industry. This means additional land will need to be allocated for biomass cultivation if SAF becomes the primary pathway to sustainable aviation. While differences were found in the performance of different types of biomass, those differences were small relative to differences with ATF and DACS. An analysis of the pricing structure of the airline industry suggests that some of the cost advantage of DACS may be erased by consumer sentiment which could explain why, to-date, the airline industry is focused primarily on SAF and to a lesser extent ATF. Further work is required to estimate the transportation, capital cost, and financing cost implications of greenfield and brownfield sites for SAF, DACS, and ATF. In the final report, we will analyze the potential to retrofit corn ethanol facilities to operate the ethanol-to-jet fuel process in response to decreasing gasoline demand as the electrification of road transport progresses. We will also construct a prioritization of land use to determine whether each net-zero CO 2 aviation pathway can make claim to the land required by their technology.

09 BIOMASS FUELS↗

Data Fusion for the Development of a Multimodal Freight Transload Facilities Dataset in the U.S.

To withstand the growing demand of commodity volume and its strain on the transportation infrastructure, it is necessary to identify the flow of commodities by route and mode. However, a national multimodal freight routing model does not exist for the U.S. The development of such model requires multiple building blocks, such as virtual representations of roadway, railway, and waterway networks, transload facilities (TFs), and access/egress links. Most of these blocks have a robust database in the U.S., except for the TFs. Here, this paper presents the fusion of dispersed and heterogeneous representations of multimodal TFs into a single, comprehensive, geospatial freight TF dataset. The TF dataset is derived from several sources, including the U.S. Army Corps of Engineers Master Docks Plus, the National Transportation Atlas Database, the Intermodal Association of North America, industry publications, and other public information. First, individual datasets were queried and reconciled. A geocoding/reverse geocoding process was applied to get the best street address and latitude/longitude location for each terminal. Then, duplicate terminals were identified by a fuzzy match algorithm based on terminal name and location, and removed. Validation was performed by visual inspection of random facilities. The main contributions of this work are: a publicly available version of the TF dataset, including facility location and multimodal transfer capability of 9,003 facilities, and an enterprise-version with the same facilities but including commodity handling capabilities. The main purpose of developing the TF dataset is to inform multimodal routing algorithms. The proposed TF dataset allows for credibly modeling the multimodal transfer of commodities within shipment routes.

Commodity Routing↗