Cost and Schedule Analytical Techniques Development: Option 1

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

Source record↗

Low Cost Large Core Vehicle Structures Assessment

Boeing Information, Space, and Defense Systems executed a Low Cost Large Core Vehicle Structures Assessment (LCLCVSA) under contract to NASA Marshall Space Flight Center (MSFC) between November 1997 and March 1998. NASA is interested in a low-cost launch vehicle, code named Magnum, to place heavy payloads into low earth orbit for missions such as a manned mission to Mars, a Next Generation Space Telescope, a lunar-based telescope, the Air Force's proposed space based laser, and large commercial satellites. In this study, structural concepts with the potential to reduce fabrication costs were evaluated in application to the Magnum Launch Vehicle (MLV) and the Liquid Fly Back Booster (LFBB) shuttle upgrade program. Seventeen concepts were qualitatively evaluated to select four concepts for more in-depth study. The four structural concepts selected were: an aluminum-lithium monocoque structure, an aluminum-lithium machined isogrid structure, a unitized composite sandwich structure, and a unitized composite grid structure. These were compared against a baseline concept based on the Space Shuttle External Tank (ET) construction. It was found that unitized composite structures offer significant cost and weight benefits to MLV structures. The limited study of application to LFBB structures indicated lower, but still significant benefits. Technology and facilities development roadmaps to prepare the approaches studied for application to MLV and LFBB were constructed. It was found that the cost and schedule to develop these approaches were in line with both MLV and LFBB development schedules. Current Government and Boeing programs which address elements of the development of the technologies identified are underway. It is recommended that NASA devote resources in a timely fashion to address the specific elements related to MLV and LFBB structures.

Hahn, Steven E.↗

One for All: Maintaining a Single Schedule Database for Large Development Projects

Efficiently maintaining and controlling a single schedule database in an Integrated Product Team environment is a significant challenge. It's accomplished effectively with the right combination of tools, skills, strategy, creativity, and teamwork. We'll share our lessons learned maintaining a 20,000 plus task network on a 36 month project.

Hilscher, R.↗

Scheduling System Assessment, and Development and Enhancement of Re-engineered Version of GPSS

The objective of this project is two-fold. First to provide an evaluation of a commercially developed version of the ground processing scheduling system (GPSS) for its applicability to the Kennedy Space Center (KSC) ground processing problem. Second, to work with the KSC GPSS development team and provide enhancement to the existing software. Systems reengineering is required to provide a sustainable system for the users and the software maintenance group. Using the LISP profile prototype code developed by the GPSS reverse reengineering groups as a building block, we have implemented the resource deconfliction portion of GPSS in common LISP using its object oriented features. The prototype corrects and extends some of the deficiencies of the current production version, plus it uses and builds on the classes from the development team's profile prototype.

Loganantharaj, Rasiah↗

Typical occupancy profiles and behaviors in residential buildings in the United States

The energy performance of a residential building is highly dependent on occupant's presence or non-presence in a building and their interactions with energy-consuming appliances. Typical occupancy schedules for residential buildings must be defined for applications such as building energy modeling as well as for assessing energy savings associated with the use of occupancy sensing technologies and occupancy-dependent controls. Currently, commonly used simulation programs assume a typical occupancy schedule, however, there is significant opportunity for improvement to these schedules as this is generally based on engineering judgement. This research uses 12 years of the American Time Use Survey (ATUS) data to develop typical occupancy schedules for a range of household types and occupant age ranges. This is compared to currently utilized residential occupancy schedules. In many cases the developed schedules exhibit similar patterns, however, differences are also found to be as high as 41% for certain periods of time. For occupancy sensing applications, the spatial-temporal distribution of occupants in residential buildings is also evaluated. These locations vary based on temporal factors as well as demographic factors such as age and number of occupants. Finally, the results of this research work towards improved occupancy schedule development can benefit both industry professionals and researchers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A knowledge-based decision support system for payload scheduling

This paper presents the development of a prototype Knowledge-based Decision Support System, currently under development, for scheduling payloads/experiments on space station missions. The DSS is being built on Symbolics, a Lisp machine, using KEE, a commercial knowledge engineering tool.

Tyagi, Rajesh↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

Scheduling language and algorithm development study. Volume 1: Study summary and overview

A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

Source record↗

Estimating the cost of major ongoing cost plus hardware development programs

Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.

Bush, J. C.↗

The development and validation of command schedules for SeaWiFS

An automated method for developing and assessing spacecraft and instrument command schedules is presented for the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) project. SeaWiFS is to be carried on the polar-orbiting SeaStar satellite in 1995. The primary goal of the SeaWiFS mission is to provide global ocean chlorophyll concentrations every four days by employing onboard recorders and a twice-a-day data downlink schedule. Global Area Coverage (GAC) data with about 4.5 km resolution will be used to produce the global coverage. Higher resolution (1.1 km resolution) Local Area Coverage (LAC) data will also be recorded to calibrate the sensor. In addition, LAC will be continuously transmitted from the satellite and received by High Resolution Picture Transmission (HRPT) stations. The methods used to generate commands for SeaWiFS employ numerous hierarchical checks as a means of maximizing coverage of the Earth's surface and fulfilling the LAC data requirements. The software code is modularized and written in Fortran with constructs to mirror the pre-defined mission rules. The overall method is specifically developed for low orbit Earth-observing satellites with finite onboard recording capabilities and regularly scheduled data downlinks. Two software packages using the Interactive Data Language (IDL) for graphically displaying and verifying the resultant command decisions are presented. Displays can be generated which show portions of the Earth viewed by the sensor and spacecraft sub-orbital locations during onboard calibration activities. An IDL-based interactive method of selecting and testing LAC targets and calibration activities for command generation is also discussed.

Woodward, Robert H.↗

Scheduling language and algorithm development study. Volume 2: Use of the basic language and module library

The capabilities of the specified scheduling language and the program module library are outlined. The summary is written with the potential user in mind and, therefore, provides maximum insight on how the capabilities will be helpful in writing scheduling programs. Simple examples and illustrations are provided to assist the potential user in applying the capabilities of his problem.

Chamberlain, R. A.↗

V/STOL tilt rotor aircraft study. Volume 6: Preliminary design of a composite wing for tilt rotor research aircraft

The results of a study of the use of composite materials in the wing of a tilt rotor aircraft are presented. An all-metal tilt rotor aircraft was first defined to provide a basis for comparing composite with metal structure. A configuration study was then done in which the wing of the metal aircraft was replaced with composite wings of varying chord and thickness ratio. The results of this study defined the design and performance benefits obtainable with composite materials. Based on these results the aircraft was resized with a composite wing to extend the weight savings to other parts of the aircraft. A wing design was then selected for detailed structural analysis. A development plan including costs and schedules to develop this wing and incorporate it into a proposed flight research tilt rotor vehicle has been devised.

Soule, V. A.↗

LIBRA: An inexpensive geodetic network densification system

A description is given of the Libra (Locations Interposed by Ranging Aircraft) system, by which geodesy and earth strain measurements can be performed rapidly and inexpensively to several hundred auxiliary points with respect to a few fundamental control points established by any other technique, such as radio interferometry or satellite ranging. This low-cost means of extending the accuracy of space age geodesy to local surveys provides speed and spatial resolution useful, for example, for earthquake hazards estimation. Libra may be combined with an existing system, Aries (Astronomical Radio Interferometric Earth Surveying) to provide a balanced system adequate to meet the geophysical needs, and applicable to conventional surveying. The basic hardware design was outlined and specifications were defined. Then need for network densification was described. The following activities required to implement the proposed Libra system are also described: hardware development, data reduction, tropospheric calibrations, schedule of development and estimated costs.

Fliegel, H. F.↗

Cryogenic Fluid Film Bearing Tester Development Study

Conceptual designs were developed for the determination of rotordynamic coefficients of cryogenic fluid film bearings. The designs encompassed the use of magnetic and conventional excitation sources as well as the use of magnetic bearings as support bearings. Test article configurations reviewed included overhung, floating housing, and fixed housing. Uncertainty and forced response analyses were performed to assess quality of data and suitability of each for testing a variety of fluid film bearing designs. Development cost and schedule estimates were developed for each design. Facility requirements were reviewed and compared with existing MSFC capability. The recommended configuration consisted of a fixed test article housing centrally located between two magnetic bearings. The magnetic bearings would also serve as the excitation source.

Scharrer, Joseph K.↗

Addendum report to atmospheric science facility pallet-only mode space transportation system payload feasibility study, volume 3, revision A

The feasibility of accomplishing selected atmospheric science mission using a pallet-only mode was studied. Certain unresolved issues were identified. The first issue was that of assuring that the on-board computer facility was adequate to process scientific data, control subsystems such as instrument pointing, provide mission operational program capability, and accomplish display and control. The second issue evolved from an investigation of the availability of existing substitute instruments that could be used instead of the prime instrumentation where the development tests and schedules are incompatible with the realistic budgets and shuttle vehicle schedules. Some effort was expended on identifying candidate substitute instruments, and the performance, cost, and development schedule trade-offs found during that effort were significant enough to warrant a follow-on investigation. This addendum documents the results of that follow-on effort, as it applies to the Atmospheric Sciences Facility.

Source record↗

Development of wire drawing processes for refractory metal fibers

Fabrication schedules were developed for producing wire, 0.25 mm to 0.51 mm diameter, from the refractory metal alloys ASTAR-811C, B-88 and W-Hf-C. Tensile properties were evaluated at room temperature and up to 1204 C. Also, the stress rupture properties of the alloys at 1093 C were determined. W-Hf-C and B-88 were found to have the best mechanical properties on a strength to density basis. The fabrication schedules for producing wire from these two alloys were further improved with regards to the wire quality and material yield under the optimization of fabrication schedule.

King, G. W.↗