Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Estimating the cost of major ongoing cost plus hardware development programs

Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.

Bush, J. C.↗

The development and validation of command schedules for SeaWiFS

An automated method for developing and assessing spacecraft and instrument command schedules is presented for the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) project. SeaWiFS is to be carried on the polar-orbiting SeaStar satellite in 1995. The primary goal of the SeaWiFS mission is to provide global ocean chlorophyll concentrations every four days by employing onboard recorders and a twice-a-day data downlink schedule. Global Area Coverage (GAC) data with about 4.5 km resolution will be used to produce the global coverage. Higher resolution (1.1 km resolution) Local Area Coverage (LAC) data will also be recorded to calibrate the sensor. In addition, LAC will be continuously transmitted from the satellite and received by High Resolution Picture Transmission (HRPT) stations. The methods used to generate commands for SeaWiFS employ numerous hierarchical checks as a means of maximizing coverage of the Earth's surface and fulfilling the LAC data requirements. The software code is modularized and written in Fortran with constructs to mirror the pre-defined mission rules. The overall method is specifically developed for low orbit Earth-observing satellites with finite onboard recording capabilities and regularly scheduled data downlinks. Two software packages using the Interactive Data Language (IDL) for graphically displaying and verifying the resultant command decisions are presented. Displays can be generated which show portions of the Earth viewed by the sensor and spacecraft sub-orbital locations during onboard calibration activities. An IDL-based interactive method of selecting and testing LAC targets and calibration activities for command generation is also discussed.

Woodward, Robert H.↗

Scheduling language and algorithm development study. Volume 2: Use of the basic language and module library

The capabilities of the specified scheduling language and the program module library are outlined. The summary is written with the potential user in mind and, therefore, provides maximum insight on how the capabilities will be helpful in writing scheduling programs. Simple examples and illustrations are provided to assist the potential user in applying the capabilities of his problem.

Chamberlain, R. A.↗

V/STOL tilt rotor aircraft study. Volume 6: Preliminary design of a composite wing for tilt rotor research aircraft

The results of a study of the use of composite materials in the wing of a tilt rotor aircraft are presented. An all-metal tilt rotor aircraft was first defined to provide a basis for comparing composite with metal structure. A configuration study was then done in which the wing of the metal aircraft was replaced with composite wings of varying chord and thickness ratio. The results of this study defined the design and performance benefits obtainable with composite materials. Based on these results the aircraft was resized with a composite wing to extend the weight savings to other parts of the aircraft. A wing design was then selected for detailed structural analysis. A development plan including costs and schedules to develop this wing and incorporate it into a proposed flight research tilt rotor vehicle has been devised.

Soule, V. A.↗

LIBRA: An inexpensive geodetic network densification system

A description is given of the Libra (Locations Interposed by Ranging Aircraft) system, by which geodesy and earth strain measurements can be performed rapidly and inexpensively to several hundred auxiliary points with respect to a few fundamental control points established by any other technique, such as radio interferometry or satellite ranging. This low-cost means of extending the accuracy of space age geodesy to local surveys provides speed and spatial resolution useful, for example, for earthquake hazards estimation. Libra may be combined with an existing system, Aries (Astronomical Radio Interferometric Earth Surveying) to provide a balanced system adequate to meet the geophysical needs, and applicable to conventional surveying. The basic hardware design was outlined and specifications were defined. Then need for network densification was described. The following activities required to implement the proposed Libra system are also described: hardware development, data reduction, tropospheric calibrations, schedule of development and estimated costs.

Fliegel, H. F.↗

Cryogenic Fluid Film Bearing Tester Development Study

Conceptual designs were developed for the determination of rotordynamic coefficients of cryogenic fluid film bearings. The designs encompassed the use of magnetic and conventional excitation sources as well as the use of magnetic bearings as support bearings. Test article configurations reviewed included overhung, floating housing, and fixed housing. Uncertainty and forced response analyses were performed to assess quality of data and suitability of each for testing a variety of fluid film bearing designs. Development cost and schedule estimates were developed for each design. Facility requirements were reviewed and compared with existing MSFC capability. The recommended configuration consisted of a fixed test article housing centrally located between two magnetic bearings. The magnetic bearings would also serve as the excitation source.

Scharrer, Joseph K.↗

Addendum report to atmospheric science facility pallet-only mode space transportation system payload feasibility study, volume 3, revision A

The feasibility of accomplishing selected atmospheric science mission using a pallet-only mode was studied. Certain unresolved issues were identified. The first issue was that of assuring that the on-board computer facility was adequate to process scientific data, control subsystems such as instrument pointing, provide mission operational program capability, and accomplish display and control. The second issue evolved from an investigation of the availability of existing substitute instruments that could be used instead of the prime instrumentation where the development tests and schedules are incompatible with the realistic budgets and shuttle vehicle schedules. Some effort was expended on identifying candidate substitute instruments, and the performance, cost, and development schedule trade-offs found during that effort were significant enough to warrant a follow-on investigation. This addendum documents the results of that follow-on effort, as it applies to the Atmospheric Sciences Facility.

Source record↗

Development of wire drawing processes for refractory metal fibers

Fabrication schedules were developed for producing wire, 0.25 mm to 0.51 mm diameter, from the refractory metal alloys ASTAR-811C, B-88 and W-Hf-C. Tensile properties were evaluated at room temperature and up to 1204 C. Also, the stress rupture properties of the alloys at 1093 C were determined. W-Hf-C and B-88 were found to have the best mechanical properties on a strength to density basis. The fabrication schedules for producing wire from these two alloys were further improved with regards to the wire quality and material yield under the optimization of fabrication schedule.

King, G. W.↗

Scheduling language and algorithm development study. Appendix: Study approach and activity summary

The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.

Source record↗

V/STOL propulsion control analysis: Phase 2, task 5-9

Typical V/STOL propulsion control requirements were derived for transition between vertical and horizontal flight using the General Electric RALS (Remote Augmented Lift System) concept. Steady-state operating requirements were defined for a typical Vertical-to-Horizontal transition and for a typical Horizontal-to-Vertical transition. Control mode requirements were established and multi-variable regulators developed for individual operating conditions. Proportional/Integral gain schedules were developed and were incorporated into a transition controller with capabilities for mode switching and manipulated variable reassignment. A non-linear component-level transient model of the engine was developed and utilized to provide a preliminary check-out of the controller logic. An inlet and nozzle effects model was developed for subsequent incorporation into the engine model and an aircraft model was developed for preliminary flight transition simulations. A condition monitoring development plan was developed and preliminary design requirements established. The Phase 1 long-range technology plan was refined and restructured toward the development of a real-time high fidelity transient model of a supersonic V/STOL propulsion system and controller for use in a piloted simulation program at NASA-Ames.

Source record↗

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

Distributed Schemes for Integrated Arrival Departure Surface (IADS) Scheduling

The objective of the NRA is to investigate and develop integrated scheduling solutions for arrival, departure and surface operations. The option year briefing summarizes simulation-based analyses of the departure metering process to investigate strategic queue management strategies and their robustness to uncertainty, assess the impact of delaying departures at their gates on blocking the arrivals destined for the same gates, and evaluate the effects and benefits of relaxing current-day MIT constraints when ATD-2 is in operation.

ATD-2↗

Enhanced Software for Scheduling Space-Shuttle Processing

The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

Barretta, Joseph A.↗