Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

SSR COST – COmposite Structural Technologies for advanced reactor deployment (Final Scientific/Technical Report)

Moltex is designing a Generation 4 or Advanced nuclear reactor, the molten salt fast spectrum SSR-W. The design intent is to reduce the cost and complexity of the nuclear systems by relying on inherent safety characteristics, instead of engineered systems. One such characteristic as a natural tendency for power to decrease as temperature increases. Another characteristic that improves natural safety is the fact that the working fluids (molten salts) are at atmospheric pressure at operating temperatures. This significantly reduces the need for pressure boundary components and systems. Moltex is highly motivated to develop simple and economic reactors to reduce the carbon intensity and improve energy security of global electricity production. The COST project investigated the opportunities for reducing construction cost of advanced reactors with the adoption of Rigid Elastic Composite Civil works (RECC). The construction design and methods used in currently operational light water power plants would generally be suboptimal for the SSR-W since there is no requirement for civil structures to withstand high pressure accidents such as hydrogen combustion or steam explosion. In parallel to downselecting the most promising RECC-type technology, accident scenarios representing the largest credible challenge to the SSR-W civil and construction design were modelled. The capability of an SSR-W reactor constructed with and without the selected construction technology was evaluated and the consequential licensing challenges identified. A construction schedule and cost estimate of the SSR-W with and without the selected RECC construction technology was developed. Once the above data was collected, then Moltex was able to review the safety performance, license-ability and cost/schedule benefit of applying the preferred construction technology. The CAPEX/NPV benefit was quantified, and the licensing risks and opportunities were documented. Finally, the CAPEX/NPV benefit of the advanced construction technology was modest due to the suitability of traditional stick-built construction for the SSR-W design. However, previously unidentified benefits of the advanced construction technology were revealed during the studies that could credibly de-risk certain aspects of the design to be licensed. Since licensing (duration and delays) are very significant in new build project costs, the cost benefits may be significant. Further studies on the risk reduction of the construction technology are foreseen.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Distributed optimization and control for autonomous distributed energy resource power dispatch and frequency regulation considering communication failures

Distributed energy resources (DERs) can significantly enhance grid flexibility by supplying power and secondary frequency regulation (SFR) services. Yet, their large number and dispersed nature limit the effectiveness of traditional centralized power dispatch and frequency control schemes, and expose the system to single-point communication failures. This paper presents a unified distributed optimization and control framework for DER power dispatch and SFR provision. A transmission-loss-aware distributed direct current optimal power flow is first formulated to optimize DER power dispatch and reserve scheduling. On top of this, a fully distributed control scheme for DER autonomous SFR provision is developed to allocate automatic generation control signals cost-effectively while ensuring robustness to communication link disruptions. The framework is validated on IEEE 14-bus and 39-bus transmission systems with large-scale distribution feeders using transmission-distribution dynamic co-simulation, demonstrating reliable and autonomous DER power dispatch and SFR provision under diverse operating conditions and communication contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems

Major technological advancements and recent policy support are improving the outlook for heavy-duty truck electrification in the United States. In particular, short-haul operations (=200 miles (=322 km)) are prevalent and early candidates for plug-in electric vehicles (EVs) given their short, predictable routes and return-to-base applications, which allows vehicles to recharge when off shift at their depots. Although previous studies investigated the impacts of added electrical loads on distribution systems, which included light-duty EVs, the implications for heavy-duty EV charging are underexplored. Here we summarize the causes, costs and lead times of distribution system upgrades anticipated for depot charging. We also developed synthetic depot charging load profiles for heavy-duty trucks from real-world operating schedules, and found that charging requirements are met at common light-duty EV charging rates (=100 kW per vehicle). Finally, we applied depot charging load profiles to 36 distribution real-world substations, which showed that most can accommodate high levels of heavy-duty EV charging without upgrades.

47 OTHER INSTRUMENTATION↗

Observation, Analysis, and Recommendations for ND Management Reviews (W88-0/Mk5 ALT 370 Program Report)

Progress and status reviews allow teams to provide updates and targeted information designed to inform the customer of progress and to help the customer understand current risks and challenges. Both presenters and the customer should have well-calibrated expectations for the level of content and information. However, what needs to be covered in systems-level management reviews can too often be poorly defined. These unclear expectations can lead teams to overpreparing or attempting to guess what information the customer considers as most critical. This aspect of the review process is stressful, disruptive, and bad for morale – and time spent overpreparing reports is time spent not focusing on the technical work necessary to stay on schedule. To define and address these issues, this report was designed to observe various aspects of development program coordination and review activities for NNSA and Navy customers, and then to conduct unbiased, independent Human Factors observation and analysis from an outside perspective. The report concludes with suggestions and recommendations for improving the efficiency of information flow related to reviews, with the goals of increasing productivity and benefitting both Sandia and the customer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Volume 6: Experiment Facility Spectrum Tailoring (HFIR Futures – Enhanced Capabilities Series)

In-core irradiation experiment research, such as materials and fuels irradiation research and radioisotope production, is one of the primary missions of Oak Ridge National Laboratory’s (ORNL) versatile High Flux Isotope Reactor (HFIR). In support of the HFIR-Sustaining and Enhancing Neutron Science (SENSe) Initiative, a technically diverse group of ORNL irradiation research subject matter experts formed the Spectrum Tailoring Working Group, with the goal of developing a compendium of experiment facility concepts to enhance irradiation experiment conditions via neutron spectrum tailoring capabilities. The purpose of this report is to document the concepts developed in FY22 and the associated scientific justifications, identify potential facility sponsors, and estimate costs and schedules for each concept. This report documents the efforts performed in FY22, which may continue in FY23 or later pending the direction of the HFIR-SENSe Initiative and the interested sponsors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Comparison of Deterministic and Statistical Models for Water Quality Compliance Forecasting in the San Joaquin River Basin, California

Model selection for water quality forecasting depends on many factors including analyst expertise and cost, stakeholder involvement and expected performance. Water quality forecasting in arid river basins is especially challenging given the importance of protecting beneficial uses in these environments and the livelihood of agricultural communities. In the agriculture-dominated San Joaquin River Basin of California, real-time salinity management (RTSM) is a state-sanctioned program that helps to maximize allowable salt export while protecting existing basin beneficial uses of water supply. The RTSM strategy supplants the federal total maximum daily load (TMDL) approach that could impose fines associated with exceedances of monthly and annual salt load allocations of up to $1 million per year based on average year hydrology and salt load export limits. The essential components of the current program include the establishment of telemetered sensor networks, a web-based information system for sharing data, a basin-scale salt load assimilative capacity forecasting model and institutional entities tasked with performing weekly forecasts of river salt assimilative capacity and scheduling west-side drainage export of salt loads. Web-based information portals have been developed to share model input data and salt assimilative capacity forecasts together with increasing stakeholder awareness and involvement in water quality resource management activities in the river basin. Two modeling approaches have been developed simultaneously. The first relies on a statistical analysis of the relationship between flow and salt concentration at three compliance monitoring sites and the use of these regression relationships for forecasting. The second salt load forecasting approach is a customized application of the Watershed Analysis Risk Management Framework (WARMF), a watershed water quality simulation model that has been configured to estimate daily river salt assimilative capacity and to provide decision support for real-time salinity management at the watershed level. Analysis of the results from both model-based forecasting approaches over a period of five years shows that the regression-based forecasting model, run daily Monday to Friday each week, provided marginally better performance. However, the regression-based forecasting model assumes the same general relationship between flow and salinity which breaks down during extreme weather events such as droughts when water allocation cutbacks among stakeholders are not evenly distributed across the basin. A recent test case shows the utility of both models in dealing with an exceedance event at one compliance monitoring site recently introduced in 2020.

54 ENVIRONMENTAL SCIENCES↗

A Survey of Multizone Airflow Simulation Software

H-Canyon simulates the building and process ventilation to ensure positive contamination control for any modifications as well as evaluating off-normal conditions. Simulations can also be used to identify air quality of personnel occupied areas. The models can be classified into two groups, single and multi-zone models. As the name states, a single zone model assumes that the building can be described by a single, well-mixed zone. Whereas large buildings have structures that must be described as multizone. Multizone airflow models deal with the difficulty of flows in a building by distinguishing the effects of internal flow restrictions. Several models have been developed that take internal partitions into account. CONTAM (currently used) is a multizone airflow program created by NIST to determine airflows including infiltration, exfiltration, wind pressures acting outside the building, buoyancy effects caused by the indoor and outdoor air temperature difference. COMIS is a multizone air infiltration, ventilation, and contaminant transport model that was developed at Lawrence Berkeley National Laboratory. COMIS deals with applied pressure distribution, airflow components, HVAC systems, schedules, and contaminant transport. EnergyPlus is designed by DOE. It supports flexible component level configuration of HVAC models and simulates sub-hourly time steps to control fast dynamic systems. The program features include providing accurate environmental performance data including energy consumption and carbon emissions, and reporting solar gains on surfaces. Heavent is used to model industrial ventilation systems to control airborne contaminants. It's designed based on the American Conference of Governmental Industrial Hygienists (ACGIH) Ventilation manual. DesignBuilder is the most recognized and advanced user interface to EnergyPlus. It gives access to all of the most frequently required simulation capabilities covering building fabric, thermal mass, glazing, shading renewables, and HVAC analysis. The objective of this study is to identify all relevant software available including commercially licensed, freely licensed, and open source, that can be used to simulate large, complex process facility ventilation systems. All discovered software tools are evaluated for salient features and compared to the software tool currently used to simulate the H-Canyon ventilation system. The design criteria of a ventilation system has two basic requirements: Supplying fresh air for the occupants and changing the air in the room sufficiently; therefore, the smells, fumes, and contaminants will be removed. In this study, first, whether the software simulates airflow (infiltration, natural ventilation, and interzonal) or considers them to be inputs is discussed. Second, if indoor contaminant levels are considered; and finally suggestions on how airflow analysis can be more appropriately accounted for when performing airflow simulation of a building. All of the airflow software reviewed for this study can account for constant infiltration and natural ventilation rates that are not affected by changes in indoor and outdoor conditions. Modelling infiltration in EnergyPlus or DesignBuilder are applicable for small buildings and not appropriate for larger buildings like the H-Canyon. The effect of wind on external pressures, infiltration, and natural and mechanical ventilation, can also be calculated using all of these software. These programs have control options to switch between natural to mechanical ventilation modes or both (hybrid). Interzonal airflow can be applied which means one zone can be specified to receive a fixed amount of air from another zone. The following ventilation modeling software is recommended for further testing: CONTAM, COMIS, Heavent. The next step in evaluating the software will consist of creating test facility simulations using evaluation copies of the software.

42 ENGINEERING↗

Fuel Salt Synthesis for the Molten Chloride Reactor Experiment: Scale-up, Operations, and Production Update

Over the previous 5 years, Idaho National Laboratory (INL) has been working with Southern Co. and TerraPower on the Advanced Reactor Demonstration Program (ARDP) funded Molten Chloride Reactor Experiment (MCRE) project. As part of this effort, INL has developed a fuel synthesis process to produce the NaCl-UCl3 fuel salt that MCRE will need for operation. Dr. Phillips will present on process development and scale-up testing and results, as well as provide an update on the current status of fuel production for MCRE. To date, the fuel synthesis process has been demonstrated at full scale using depleted uranium, and the equipment necessary for production of the fuel for MCRE has been installed in the Fuel Manufacturing Facility (FMF) at the INL’s Materials and Fuels Complex (MFC). The NaCl-UCl3 produced to-date has been shown to be of 99.99% purity or greater, and be within tolerance for all relevant parameters. Overall process efficiency in terms of uranium utilization has been demonstrated to be above 90%. The synthesis operation has also been shortened to allow for completion of the reaction within a single 10 hour working shift. Consequently, the process developed is expected to be capable of meeting all project objectives for efficiency, purity, scale, and scheduling. Production of NaCl-UCl3 fuel salt for MCRE is projected to begin during the Summer of 2025.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Regulatory Development for Advanced Manufacturing

Advanced Methods of Manufacturing (AMM) are new, novel manufacturing processes that have the potential to bring significant cost and schedule reductions to many industries, including the nuclear industry. These methods produce components faster and cheaper than many traditional methods. This includes replacing obsolete components at currently operating plants as well as manufacturing components of all sizes for advanced reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Small Hydropower Interconnections: Small Hydropower in the United States

Small hydropower projects, which we define as generators below 20 MW in capacity have been the predominant source of hydropower growth over the past decade and create the most cost-effective and environmentally permissible avenues for new hydropower installation in the United States (DOE 2016; Johnson et al. 2018). Small hydropower developers across the United States have found that interconnecting these projects with the grid can be challenging due to unexpected costs and schedule overruns. Understanding the interconnection challenges and improving the process may allow more small hydropower projects to be successful. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. To begin to analyze the existing interconnection processes and challenges facing small hydropower, the state of small hydropower development in the U.S. must first be described to understand the characteristics of the industry. The first in a series, this paper presents the state of small hydropower projects in the U.S. to describe their type, location, and size based on data extracted from the HydroSource database (ORNL 2020). The following papers in the series will detail the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”), and present best practices in interconnection processes (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

2010-2012 California Household Travel Survey

The 2010-2012 California Household Travel Survey (CHTS) was administered by the California Department of Transportation, which collected demographic and travel behavior characteristics for residents across the entire state. At the time, it was the largest such regional or statewide survey ever conducted in the United States. Detailed travel behavior information was obtained from more than 42,500 households via multiple data-collection methods, including computer-assisted telephone interviewing, online and mail surveys, wearable (7,574 participants) and in-vehicle (2,910 vehicles) global positioning system devices, and on-board diagnostic sensors that gathered data directly from a vehicle's engine. Details of personal travel behavior were gathered within the region of residence, inter-regionally within the state, and in adjoining states and Mexico. The survey sampling plan was designed to ensure an accurate representation of the entire population of the state. The CHTS included additional features, such as vehicle-acquisition decisions, parking choices, work schedules and flexibility, use of toll lanes/priced facilities, and walk and bicycle trips, to support advanced model development.

1Hz data↗

Potential of Offshore Wind Energy Off the Coast of California

Two buoys equipped with lidars owned by US Department of Energy were deployed off the coast of California in fall of 2020 by Pacific Northwest National Laboratory. The buoys are scheduled to collect data for an entire annual cycle at two offshore locations proposed for offshore wind development by Bureau of Ocean Energy Management. One of the buoys was deployed approximately 50 km off the coast near Morro Bay in central California in 1100 m of water. The second buoy was deployed approximately 40 km off Humboldt County in northern California in 625 m of water. The buoys provided the first-ever measurements of hub-height winds off the coast of California. The atmospheric and oceanographic characteristics of the area and estimates of annual energy production at both Morro Bay and Humboldt lease areas show that both locations have a high wind energy yield and are prime locations for future floating offshore wind turbines.

Krishnamurthy, Raghavendra↗

Real-time Ridesharing for Transportation Hubs with Demand and Supply Uncertainty

Transportation hubs in major cities generate a significant amount of trips by taxis and for-hail vehicles (FHV), with many of the trips sharing similar destinations. This suggests promising opportunities to leverage the collective travel needs with dedicated ridesharing solutions to reduce the externalities of excessive traffic at transportation hubs. In this study, we develop a novel dynamic ridesharing approach to serve trips from the transportation hub by considering (1) demand (new passengers) and supply (newly available vehicles) in the near future and (2) the uncertainty of future predictions. Our approach consists of two stages. In the first stage, we develop a data structure called hub mobility tree to generate potential combinations of shareable trips as candidate schedules efficiently. Then the generated schedules are used in the second stage to formulate the stochastic hub-based ridesharing problem (SHRP), which is a stochastic integer programming problem with the objective to maximize the total expected ridesharing profit over time. Due to the prohibitive number of shareable trips, we then approximately solve SHRP by the sample average approximate method (SAA), and a dual Lagrangian technique is implemented to further improve the scalability of the solution approach. We demonstrate the performances of the proposed method by simulating the ridesharing service at JFK airport using NYC taxi and FHV data. The results indicate that the proposed method outperforms the myopic ridesharing (maximize profit for a single time step) and the rolling horizon method with point estimation of future demand and supply.

dynamic ridesharing↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Verification and validation of developed short-term forecasting models

Recent advancements in machine learning (ML) and artificial intelligence (AI) technologies provide an opportunity for leveraging data-driven algorithms to predict future nuclear power plant (NPP) operating conditions by using recorded plant process data. Successfully implementing these models can lead to cost-reducing, conditioned-based predictive maintenance through optimized maintenance schedules and a reduction of unnecessary maintenance activities. This report discusses the verification and validation of short-term forecasting processes (i.e., data cleaning, feature selection, model optimization, and forecasting) developed in previous reports. The verification and validation (V&V) process demonstrates the expected precision and accuracy when the ML model encounters new datasets from different systems. Shapley additive explanations were used as the primary means of feature selection across these different data set. Individual models were trained for each data set, then validated through a cross-validation procedure. In this report, two different ML models were tasked to predict variables from three different plant process data sets with varying prediction horizons. The results indicate that support vector regression (SVR) outperformed long short-term memory (LSTM) neural networks in regard to each data set and each prediction horizon in this study, but further tuning and optimization could improve long short-term memory results. However, each forecasting model showed reduced performance as the prediction horizon was extended from 1 hour to 1 day ahead. Research is ongoing to evaluate the optimal input variable space, which is based on a given set of process parameters, to further improve forecasting accuracy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Stability-based optimization of ACRT for the growth of CZT by the traveling heater method

Numerical modeling is employed to study the effects of several accelerated crucible rotation technique (ACRT) rotation schedules on the growth of cadmium zinc telluride (CZT) by the traveling heater method (THM). In conjunction with these analyses, a measure is developed to estimate the amplitude of disturbances associated with cellular interface growth morphologies that develop over time and across the melt-solid interface. Furthermore, this disturbance amplitude measure is used to assess the ability of ACRT to stabilize the growth interface and thereby minimize inclusion formation processes. Notably, our analyses reveal that interfacial instability is not well correlated with melt undercooling, explaining why classical ACRT approaches to reduce undercooling by mixing may not stabilize growth. Computations show that interface stability is best achieved via rotation schedules that accentuate outward Ekman flows during spin-up and, during spin-down, eliminate Taylor-Görtler flows and minimize inward Ekman flows.

36 MATERIALS SCIENCE↗

A Digital Twin of Scalable Quantum Clouds

Quantum computing has emerged as a transformative technology capable of solving complex problems beyond the limit of classical systems. The rapid development of quantum processors has led to the proliferation of cloud-based quantum computing services offered by platforms such as IBM, Google, and Amazon. These platforms introduce unique challenges in resource allocation, job scheduling, and multi-device orchestration as quantum workloads become increasingly complex. In this work, we present a digital twin of quantum cloud infrastructures: a framework designed to model and simulate the behavior of real quantum cloud systems. Developed in Python using the SimPy discrete-event simulation library, the framework replicates key aspects of quantum cloud environments, including detailed quantum device modeling, job lifecycle management, and job fidelity. It incorporates noise-aware fidelity estimation, making it the first of its kind to simulate superconducting gate-based quantum cloud systems at an administrative level with job fidelity. We present use cases as proof of concept, demonstrating that our quantum cloud simulation framework can act as a digital twin of a quantum cloud and support the modeling and implementation of practical systems.

Luo, Waylon [Kent State University]↗