Search NASA⌕ Search

SEARCH · Search NASA

Results for “siting considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Risk Considerations of Transitioning CO2-EOR Field to CO2 storage Field: Case Study

In the United States (U.S.), carbon dioxide (CO2) injection wells at EOR sites are currently regulated as Class II wells under the U.S. Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) program while dedicated geological CO2 storage (GCS) wells are considered Class VI wells. A CO2-EOR facility considering a transitioning from tertiary oil recovery to injecting CO2 for the primary purpose of long-term storage is required to obtain a Class VI permit where this transition poses an increased risk to underground sources of drinking water. This study considers how transitioning operations from CO2-EOR to storage can impact reservoir plume and pressure transient in the storage envelope, and how these changes could impact area of review and potential unwanted fluid migration. We developed a case study to assess subsurface response and leakage risks associated with a representative, hypothetical operation in a carbonate reservoir. This reservoir transitions from tertiary hydrocarbon recovery to dedicated GCS. Reservoir simulations were run for a set of credible CO2-EOR scenarios to estimate distributions of fluids phases and pressures throughout the model domain after CO2 flooding as well as forecasting the behavior of the reservoir after the transition to a dedicated storage phase. The evolutions from all simulated scenarios were used as the basis for leakage risk quantification using the National Risk Assessment Partnership’s Open-Source Integrated Assessment Model (NRAP-Open-IAM) with a novel reduced-order model to estimate time-dependent leakage of CO2, brine, and hydrocarbon fluids through potentially leaky wells. Results include a description of reservoir response, an estimate of the areal extent that could potentially be impacted by leakage to underground sources of drinking water, and estimates of the magnitude of potential leakage. Considerations for dedicated storage injection well selection, injectivity, and injection scheme performance and potential leakage risk are presented, with implications for risk assessment of well transition discussed. This study presents a risk-based workflow for the Class II to Class VI well transition. Integrating credible numerical simulation of viable CO2-EOR to dedicated CO2 storage with quantitative risk assessment tools, such as the NRAP-Open-IAM, will provide a valuable means to devise operational scenarios and inform decision-making related to storage benefit, leakage risk, and liability. Presented at the SPE/AAPG/SEG Carbon Capture Utilization and Storage Conference in Houston, TX, March 11-13, 2024.

Liu, Guoxiang↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Operation and Security Considerations for Heat Pipe Cooled Microreactors

Microreactors and small modular reactors (SMRs) are anticipated to be key elements in the United States' carbon-free energy portfolio, serving as reliable power sources for remote communities, disaster relief zones, extraterrestrial deployments, and backup power needs. Microreactors employ technologies that are substantially more advanced and recent compared to conventional reactors. Furthermore, they are of a drastically smaller scale and are designed to be operated in a diverse set of locations, offering operational flexibility and mobility. In addition, the autonomous or semi-autonomous operation of microreactors with minimal or no on-site staff is anticipated. These factors give rise to specific challenges with regards to their safety and security. The present work investigates considerations related to heat pipe operation, reactor transport, and cyber/cyberphysical security to ensure the indirect and direct consequences of nefarious actors’ actions are understood and can be mitigated by design or through physical security measures. In addition, future directions are proposed for consideration by both HPMR designers and for regulators.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Atmospheric CO 2 estimates for the Miocene to Pleistocene based on foraminiferal $δ^{11}$B at Ocean Drilling Program Sites 806 and 807 in the Western Equatorial Pacific

Constraints on the evolution of atmospheric CO 2 levels throughout Earth's history are foundational to our understanding of past variations in climate. Despite considerable effort, records vary in their temporal and spatial coverage and estimates of past CO 2 levels do not always converge, and therefore new records and proxies are valuable. Here we reconstruct atmospheric CO 2 values across major climate transitions over the past 16 million years using the boron isotopic composition (δ 11 B) of planktic foraminifera from 89 samples obtained from two sites in the West Pacific Warm Pool, Ocean Drilling Program (ODP) Sites 806 and 807, measured using high-precision multi-collector inductively coupled plasma mass spectrometry. We compare our results to published data from ODP Site 872, also in the Western Equatorial Pacific, that goes back to 22 million years ago. These sites are in a region that today is near equilibrium with the atmosphere and are thought to have been in equilibrium with the atmosphere for the interval studied. We show that δ 11 B data from this region are consistent with other boron-based studies. The data show evidence for elevated pCO 2 during the Middle Miocene and Early to Middle Pliocene, and reductions in pCO 2 of ~200 ppm during the Middle Miocene Climate Transition, ~250 ppm during Pliocene Glacial Intensification and ~50 ppm during the Mid-Pleistocene Climate Transition. During the Mid-Pleistocene Transition there is a minimum pCO 2 at marine isotopic stage (MIS) 30. Our results are consistent with a coupling between pCO 2 , temperature and ice sheet expansion from the Miocene to the late Quaternary.

54 ENVIRONMENTAL SCIENCES↗

Managed aquifer recharge as a strategy to redistribute excess surface flow to baseflow in snowmelt hydrologic regimes

Water management in snowmelt hydrologic regimes, characterized by large annual fluctuations in stream flow driven by seasonal snow melt, faces the challenge of highly variable supply that often does not align with timing of demand. Climate change may exacerbate management challenges by significantly reducing snowpack or shifting snow melt earlier. Here, managed aquifer recharge (MAR) is evaluated as a potential strategy to reallocate excess early-season stream flow to time periods when less surface water is available. This strategy differs from traditional MAR, where the goal is to minimize loss to surface water. We assess how to site MAR operations such that groundwater recharge flows back to the surface water system in a lagged manor to benefit water management objectives, which we term “enhanced baseflow.” We use a regional groundwater model for the Treasure Valley aquifer located in southwestern Idaho, United States to demonstrate a generalizable approach using regional groundwater models as tools to identify favorable baseflow enhancement locations. Hypothetical MAR is simulated at 197 candidate locations, which are then evaluated for how effectively they meet potential management objectives. In addition to demonstrating the modeling and evaluation approach, we discuss lessons learned from applying a pre-existing regional groundwater model to MAR for enhanced baseflow and also describe important considerations, such as the physical and institutional availability of surface flows and specific management objectives, when assessing regional and site-specific suitability of MAR for enhanced baseflow as a potential management strategy.

54 ENVIRONMENTAL SCIENCES↗

Engineering Li/Na selectivity in 12-Crown-4–functionalized polymer membranes

Significance Lithium is a key ingredient in batteries, which are integral components of next-generation automobiles, airplanes, grid energy storage, and electronic devices. Unfortunately, lithium extraction from natural sources is laborious, slow, and costly, motivating the search for more efficient isolation techniques. While polymeric membranes could reduce the cost of lithium recovery, current membrane materials lack sufficient lithium-ion selectivity. To address this challenge, we introduce a class of polymeric membranes that incorporate ion binding sites, which significantly increases the transport selectivity of LiCl over NaCl. These studies provide guidelines and practical considerations for incorporating specific interactants into polymers that mediate selective ion transport.

36 MATERIALS SCIENCE↗

Surface impacts and associated mechanisms of a moisture intrusion into the Arctic observed in mid-April 2020 during MOSAiC

Distinct events of warm and moist air intrusions (WAIs) from mid-latitudes have pronounced impacts on the Arctic climate system. We present a detailed analysis of a record-breaking WAI observed during the MOSAiC expedition in mid-April 2020. By combining Eulerian with Lagrangian frameworks and using simulations across different scales, we investigate aspects of air mass transformations via cloud processes and quantify related surface impacts. The WAI is characterized by two distinct pathways, Siberian and Atlantic. A moist static energy transport across the Arctic Circle above the climatological 90th percentile is found. Observations at research vessel Polarstern show a transition from radiatively clear to cloudy state with significant precipitation and a positive surface energy balance (SEB), i.e., surface warming. WAI air parcels reach Polarstern first near the tropopause, and only 1–2 days later at lower altitudes. In the 5 days prior to the event, latent heat release during cloud formation triggers maximum diabatic heating rates in excess of 20 K d -1 . For some poleward drifting air parcels, this facilitates strong ascent by up to 9 km. Based on model experiments, we explore the role of two key cloud-determining factors. First, we test the role moisture availability by reducing lateral moisture inflow during the WAI by 30%. This does not significantly affect the liquid water path, and therefore the SEB, in the central Arctic. The cause are counteracting mechanisms of cloud formation and precipitation along the trajectory. Second, we test the impact of increasing Cloud Condensation Nuclei concentrations from 10 to 1,000 cm -3 (pristine Arctic to highly polluted), which enhances cloud water content. Resulting stronger longwave cooling at cloud top makes entrainment more efficient and deepens the atmospheric boundary layer. Finally, we show the strongly positive effect of the WAI on the SEB. This is mainly driven by turbulent heat fluxes over the ocean, but radiation over sea ice. The WAI also contributes a large fraction to precipitation in the Arctic, reaching 30% of total precipitation in a 9-day period at the MOSAiC site. However, measured precipitation varies substantially between different platforms. Therefore, estimates of total precipitation are subject to considerable observational uncertainty.

54 ENVIRONMENTAL SCIENCES↗

129 I, 99 Tc, and U Distribution Coefficients of Subsurface Sediments Collected from the Proposed Site of the Environmental Management Disposal Facility

Performance Assessment calculations were completed in 2020 to evaluate the Environmental Management Disposal Facility (EMDF), a proposed new low-level radioactive waste (LLW) disposal facility on the U.S. Department of Energy’s Oak Ridge Reservation (ORR). Among the large number of input parameters needed for such calculations, are distribution coefficients (K d values; radionuclide concentration solid: liquid ratio) that provide a measure of the tendency of radionuclides to bind to sediments. The objective of this study was to measure K d values of three radionuclides that may pose a disproportionately large amount of risk, U, iodine-129 ( 129 I) and technetium-99 ( 99 Tc). The average 129 I K d value for the 14 geological materials recovered from the proposed EMDF site was 37.8 mL/g and ranged from 0.45 to 140.9 mL/g. These values were consistent, but somewhat larger than previous measurements made with ORR sediments and were about an order of magnitude greater than those used in previous EMDF PA calculations. The median 99 Tc K d value was 365.7 mL/g, much greater than previously reported using ORR geological materials. Five of the 14 tested geological materials sorbed large quantities of 99 Tc, suggesting that the weakly sorbing 99 Tc(VII) species had been reduced to the sparingly soluble 99 Tc(IV) species. The five strongly sorbing sediments had apparent 99 Tc solubility values of approximately <10 -8 mol/L. The median U K d value was 5,726 mL/g. All of the tested geological materials had large K d values, ranging from 625 to >10,208 mL/g. Among the sediment samples that exhibited strong U binding, the apparent solubility value was approximately <10 -9 mol/L. Based on sediment properties and general ORR geological considerations, it was proposed that much of the 129 I and 99 Tc retention could be attributed to the site materials exhibiting low pH (average pH = 4.94), and/or the elevated levels of iron oxides, manganese oxides, and natural organic matter. Similarly, the extremely high U binding measured in these sediments may also be attributed to the low conditions of carbonates, which can complex and therefore solubilize uranyl in these tests due to the low pH, and also the relatively high concentrations of iron and organic coatings on these samples. An implication of this study is that the areas of the EMDF subsurface environment may have natural properties for attenuating 129 I, 99 Tc, and U movement, and potentially other radionuclides, thereby possibly reducing risk posed by burial of LLW at this site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Independent Review of Groundwater Remediation Strategy for Hexavalent Chromium and RDX Groundwater Plumes at Los Alamos National Laboratory (Rev. 1)

Site operations at the Los Alamos National Laboratory (LANL) resulted in the release of oxidized chromium, Cr(VI), into Sandia Canyon from cooling tower effluent from 1956 until 1972. The chromium traveled with the surface water approximately 3 miles downstream before migrating below ground surface. Chromium concentrations exceed 50 μg/L in the upper portion of the aquifer. Another LANL groundwater plume of concern is associated with RDX (Royal Demolition Explosives, 1,3,5-trinitro-1,3,5-triazine). Between 1951 and 1996, RDX was released to the mesa-top facilities' process water outfall, adjacent and underlying soils, and alluvial sediments, along with surface water in Cañon de Valle. Between 2000 and 2010, two remedial actions were deployed, removing much of the near-surface RDX, however, recharge due to precipitation has transported RDX into the perched-intermediate zone and into the regional aquifer. The report documents an independent technical review by scientists from the Department of Energy (DOE) Network of National Laboratories for Environmental Management and Stewardship (NNLEMS) to provide recommendations for potential near term actions to address and optimize remediation for both the Cr(VI) and RDX plumes. The proposed near-term remedial actions include design of pump and treat systems for Cr(VI) and monitoring and study for natural attenuation for RDX. The review assesses existing data, conceptual and numerical modeling, and it recommends a technical integration process to support identifying and implementing strategic, effective and efficient remedies. The DOE Environmental Management Los Alamos Field Office (EM-LA) and their cleanup contractor Newport News Nuclear-BWTX, LLC Los Alamos (N3B) provided the information required for the review. Interviews were also conducted with regulators to obtain the full spectrum of technical, regulatory and scientific perspectives. The independent review team was impressed by the capabilities, experiences, innovativeness, and insightfulness of the technical representatives from both the regulator, the New Mexico Environment Department (NMED) and N3B. Incorporation of vadose zone flow pathways in the conceptual site model (CSM) and configuring the numerical modeling for the site was generally state-of-the-practice (or better). This could be considered state-of-the-art by addressing uncertainties related to spatial extent of hydraulic windows. The reviews from the regulators were thorough and often provided useful concepts for consideration and future/study resolutions. The overarching consensus recommendation of independent review team is that the LANL groundwater plumes should be addressed in context of the emerging "management of complex sites" paradigm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Microbial Ecology and Site Characteristics Underlie Differences in Salinity-Methane Relationships in Coastal Wetlands

Methane (CH 4 ) is a potent greenhouse gas emitted by archaea in anaerobic environments such as wetland soils. Tidal freshwater wetlands are predicted to become increasingly saline as sea levels rise due to climate change. Previous work has shown that increases in salinity generally decrease CH 4 emissions, but with considerable variation, including instances where salinization increased CH 4 flux. We measured microbial community composition, biogeochemistry, and CH 4 flux from field samples and lab experiments from four different sites across a wide geographic range. We sought to assess how site differences and microbial ecology affect how CH 4 emissions are influenced by salinization. CH 4 flux was generally, but not always, positively correlated with CO 2 flux, soil carbon, ammonium, phosphate, and pH. Methanogen guilds were positively correlated with CH 4 flux across all sites, while methanotroph guilds were both positively and negatively correlated with CH 4 depending on site. There was mixed support for negative relationships between CH 4 fluxes and concentrations of alternative electron acceptors and abundances of taxa that reduce them. CH 4 /salinity relationships ranged from negative, to neutral, to positive and appeared to be influenced by site characteristics such as pH and plant composition, which also likely contributed to site differences in microbial communities. The activity of site-specific microbes that may respond differently to low-level salinity increases is likely an important driver of CH 4 /salinity relationships. Our results suggest several factors that make it difficult to generalize CH 4 /salinity relationships and highlight the need for paired microbial and flux measurements across a broader range of sites.

54 ENVIRONMENTAL SCIENCES↗

Pd-CeO 2 catalyst facilely derived from one-pot generated Pd@Ce-BTC for low temperature CO oxidation

Due to the capacity to offer abundant catalytic sites within porous solids featuring high surface areas, metal-organic frameworks (MOFs) and their derivatives have garnered considerable attention as prospective catalysts in environmental catalysis. Here, to promote the industrial application of MOFs, there is an urgent need for an effective and environmental-friendly preparation approach. Breaking through the limitation of the traditional two-step preparation method that Pd was introduced to the already prepared Ce-BTC (Pd/Ce-BTC, BTC = 1, 3, 5 benzenetricarboxylate), in this work, we present a novel one-pot solvothermal method for synthesizing the Pd material supported by Ce-BTC (Pd@Ce-BTC). After pyrolysis in N 2 flow or air flow, Pd-CeO 2 catalysts derived from Pd@Ce-BTC exhibited much higher CO oxidation activity than those from Pd/Ce-BTC. Moreover, Pd/Ce-BTC and Pd@Ce-BTC pyrolyzed in N 2 flow (Pd/Ce-BTC-N and Pd@Ce-BTC-N) could better catalyze the oxidation of CO than Pd/Ce-BTC and Pd@Ce-BTC pyrolyzed in air flow (Pd/Ce-BTC-A and Pd@Ce-BTC-A). Further characterizations revealed that the abundant surface Ce 3+ species, rich surface adsorbed oxygen species and superior redox properties were the main reasons for the superior CO oxidation activity of Pd@Ce-BTC-N.

36 MATERIALS SCIENCE↗

Mapping foliar photosynthetic capacity in sub-tropical and tropical forests with UAS-based imaging spectroscopy: Scaling from leaf to canopy

Accurate understanding of the variability in foliar physiological traits across landscapes is critical to improve parameterization and evaluation of terrestrial biosphere models (TBMs) that seek to represent the response of terrestrial ecosystems to a changing climate. Numerous studies suggest imaging spectroscopy can characterize foliar biochemical and morphological traits at the canopy scale, but there is only limited evidence for retrieving canopy photosynthetic capacity (e.g., maximum carboxylation rate, V c,max and maximum electron transport rate, J max ). Moreover, the effect of canopy structure within forest communities on scaling up spectra-trait relationships from leaf to canopy level is not well known. To advance the spectra-trait approach and enable the estimation of key traits using remote sensing, we collected imaging spectroscopy data from an Unoccupied Aerial System (UAS) platform over two forest sites in China (a subtropical forest in Mt. Dinghu and a tropical rainforest in Xishuangbanna). At these sites, we also collected ground measurements of leaf spectra and traits, including biochemical (leaf nitrogen, phosphorus, chlorophyll, and water content), morphological (leaf mass per area, LMA) and physiological (V c,max25 and J max25 ) traits (n=135 tree-crowns from 42 species across two sites). Using a partial least-squares regression (PLSR) approach, we built and tested spectra-trait models with repeated cross-validation. The spectral models developed with leaf spectra were directly transferred to canopy spectra to evaluate the effect of canopy structure. Here we further applied canopy spectral models to map these traits at individual tree-crown scale. The results demonstrate that (1) UAS-based canopy spectra can be used to estimate V c,max (R 2 =0.55, nRMSE=11.79%), Jmax (R 2 =0.54, nRMSE=12.34%), and five additional foliar traits (R 2 =0.38-0.60, nRMSE=10.11-13.56%) at the tree-crown scale with demonstrated generalizability across two sites; (2) canopy structure strongly affects the spectratrait relationships from leaf to canopy level, but the effects vary considerably across foliar traits and cannot be well captured by the 4SAIL canopy radiative transfer model. UAS-based imaging spectroscopy maps large variability in all foliar traits (including physiological traits) with spatially explicit information, reproducing the field-observed inter- and intra-specific variations. These results demonstrate the capability of using UAS-based imaging spectroscopy for characterizing the variability of foliar physiological traits at individual tree-crown scale over forest landscapes and highlight the similar generalizability but different biophysical mechanisms underlying spectra-trait relationships at leaf and canopy levels.

54 ENVIRONMENTAL SCIENCES↗

Conformational Dynamics of Bacteriochlorophyll c in Chlorosomes from the bchQ Mutant of Chlorobaculum tepidum

In contrast to the common viewpoint that bacteriochlorophyll (BChl) motion is largely absent within the chlorosome assembly, physics-based modeling points to a crucial role of the nanoscale librational motion of the macrocycle for the transfer of excitons. To elucidate this motion experimentally, compositional uniformity and high sensitivity are required. We focused on uniformly 13 C labeled chlorosome preparations from the bchQ mutant Chlorobaculum tepidum with significantly enhanced structural homogeneity. The librational motion is characterized using Rotational Echo DOuble Resonance (REDOR), and in addition, the impact of temperature on specific functionalities within BChl molecules is studied with 1-dimensional and 2-dimensional dipolar and scalar-based MAS NMR measurements. Results show the gradual freezing of the tails and side chains of the BChls with decreasing temperature. However, the librational motion analyzed by measuring the 5C–H dipolar coupling strength obtained from REDOR data sets persists at different temperatures. REDOR simulations show a close match to the experimental dephasing frequency of oscillation for a dipolar coupling strength of 17.5 ± 0.5 kHz which is considerably less than the dipolar coupling strength of 22.7 kHz in the rigid limit. Following a two-site jump model, we arrive at an estimate for BChl libration sampling at an angle of θ = 48 ± 4°, corroborating that the macrocycle indeed experiences significant librational motion on a time scale that is short compared to the NMR measurement time. This finding is in full quantitative support of the dominant rotational motion exhibited by the BChl macrocycle estimated from early MD simulations.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Defect Properties, Anion Ordering, and Photochromic Mechanism in Yttrium Oxyhydride

Yttrium oxyhydride (YHO) undergoes a reversible photochromic transition when exposed to ultraviolet light. However, the mechanism for this transformation is not fully understood, and the structure and precise chemical composition of YHO remain under debate. Here, we use first-principles density functional theory calculations with a hybrid functional to study the structure, chemical stability, and point defect properties of YHO. As experiments have shown, we find that YHO prefers a cubic structure, with H and O anions present in equal concentrations and located on tetrahedral sites. Stoichiometric and ordered YHO is chemically stable, but it has a wide band gap of 5.01 eV, considerably larger than that measured in experiments (2.4–3.8 eV). On the other hand, Y4H10O has a smaller band gap of 2.97 eV and also has a region of chemical stability; thus, the actual material may include some fraction of this H-rich structure. The defect chemistry of YHO is dominated by anionic antisite species (H O and O H ), with hydrogen interstitials (H i ) and vacancies (V H ) also present in reasonably high concentrations. We show that antisite disorder lowers the band gap relative to the perfectly ordered structure, bringing the magnitude of the gap into closer agreement with experiment. Based on our calculations of defect migration and the positions of defect states relative to the band edges, we link the onset of photochromic behavior to the reaction H O – → V O 0 + H i – , which follows photoexcitation of a H O + defect. H i – can subsequently migrate away and be trapped by additional H O + defects, contributing to the persistence of the reaction, while the resultant oxygen vacancy, V O 0 , introduces an occupied defect state that leads to optical absorption at visible wavelengths. Our results can explain reported discrepancies between experimental and computational results for YHO, and they allow us to propose specific atomic-scale processes that can lead to photochromism. In conclusion, understanding these mechanisms is key for unlocking YHO’s application in devices ranging from smart windows and optoelectronics to electrochemical synapses for neural networks.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Structural basis for intermodular communication in assembly-line polyketide biosynthesis

Assembly-line polyketide synthases (PKSs) are modular multi-enzyme systems with considerable potential for genetic reprogramming. Understanding how they selectively transport biosynthetic intermediates along a defined sequence of active sites could be harnessed to rationally alter PKS product structures. Here, to investigate functional interactions between PKS catalytic and substrate acyl carrier protein (ACP) domains, we employed a bifunctional reagent to crosslink transient domain–domain interfaces of a prototypical assembly line, the 6-deoxyerythronolide B synthase, and resolved their structures by single-particle cryogenic electron microscopy (cryo-EM). Together with statistical per-particle image analysis of cryo-EM data, we uncovered interactions between ketosynthase (KS) and ACP domains that discriminate between intra-modular and inter-modular communication while reinforcing the relevance of conformational asymmetry during the catalytic cycle. Our findings provide a foundation for the structure-based design of hybrid PKSs comprising biosynthetic modules from different naturally occurring assembly lines.

59 BASIC BIOLOGICAL SCIENCES↗