From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

mission operations↗

Implementation of Programmatic Quality and the Impact on Safety

The purpose of this paper is to discuss the implementation of a programmatic quality assurance discipline within the International Space Station Program and the resulting impact on safety. NASA culture has continued to stress safety at the expense of quality when both are extremely important and both can equally influence the success or failure of a Program or Mission. Although safety was heavily criticized in the media after Col~imbiaa, strong case can be made that it was the failure of quality processes and quality assurance in all processes that eventually led to the Columbia accident. Consequently, it is possible to have good quality processes without safety, but it is impossible to have good safety processes without quality. The ISS Program quality assurance function was analyzed as representative of the long-term manned missions that are consistent with the President s Vision for Space Exploration. Background topics are as follows: The quality assurance organizational structure within the ISS Program and the interrelationships between various internal and external organizations. ISS Program quality roles and responsibilities with respect to internal Program Offices and other external organizations such as the Shuttle Program, JSC Directorates, NASA Headquarters, NASA Contractors, other NASA Centers, and International Partner/participants will be addressed. A detailed analysis of implemented quality assurance responsibilities and functions with respect to NASA Headquarters, the JSC S&MA Directorate, and the ISS Program will be presented. Discussions topics are as follows: A comparison of quality and safety resources in terms of staffing, training, experience, and certifications. A benchmark assessment of the lessons learned from the Columbia Accident Investigation (CAB) Report (and follow-up reports and assessments), NASA Benchmarking, and traditional quality assurance activities against ISS quality procedures and practices. The lack of a coherent operational and sustaining quality assurance strategy for long-term manned space flight. An analysis of the ISS waiver processes and the Problem Reporting and Corrective Action (PRACA) process implemented as quality functions. Impact of current ISS Program procedures and practices with regards to operational safety and risk A discussion regarding a "defense-in-depth" approach to quality functions will be provided to address the issue of "integration vs independence" with respect to the roles of Programs, NASA Centers, and NASA Headquarters. Generic recommendations are offered to address the inadequacies identified in the implementation of ISS quality assurance. A reassessment by the NASA community regarding the importance of a "quality culture" as a component within a larger "safety culture" will generate a more effective and value-added functionality that will ultimately enhance safety.

Huls, Dale Thomas↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, there was never an intention of maintaining the pace of this process indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5- day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

Mars exploration↗

Remotely Operated Aircraft (ROA) Impact on the National Airspace System (NAS) Work Package, 2005: Composite Report on FAA Flight Plan and Operational Evaluation Plan. Version 7.0

The purpose of this document is to present the findings that resulted from a high-level analysis and evaluation of the following documents: (1) The OEP (Operational Evolution Plan) Version 7 -- a 10-year plan for operational improvements to increase capacity and efficiency in U.S. air travel and transport and other use of domestic airspace. The OEP is the FAA commitment to operational improvements. It is outcome driven, with clear lines of accountability within FAA organizations. The OEP concentrates on operational solutions and integrates safety, certification, procedures, staffing, equipment, avionics and research; (2) The Draft Flight Plan 2006 through 2010 -- a multi-year strategic effort, setting a course for the FAA through 2001, to provide the safest and most efficient air transportation system in the world; (3) The NAS System Architecture Version 5 -- a blueprint for modernizing the NAS and improving NAS services and capabilities through the year 2015; and (4) The NAS-SR-1000 System Requirements Specification (NASSRS) -- a compilation of requirements which describe the operational capabilities for the NAS. The analysis is particularly focused on examining the documents for relevance to existing and/or planned future UAV operations. The evaluation specifically focuses on potential factors that could materially affect the development of a commercial ROA industry, such as: (1) Design limitations of the CNS/ATM system, (2) Human limitations, The information presented was taken from program specifications or program office lead personnel.

Source record↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗

A Software Framework for Aircraft Simulation

The National Aeronautics and Space Administration Dryden Flight Research Center has a long history in developing simulations of experimental fixed-wing aircraft from gliders to suborbital vehicles on platforms ranging from desktop simulators to pilot-in-the-loop/aircraft-in-the-loop simulators. Regardless of the aircraft or simulator hardware, much of the software framework is common to all NASA Dryden simulators. Some of this software has withstood the test of time, but in recent years the push toward high-fidelity user-friendly simulations has resulted in some significant changes. This report presents an overview of the current NASA Dryden simulation software framework and capabilities with an emphasis on the new features that have permitted NASA to develop more capable simulations while maintaining the same staffing levels.

Curlett, Brian P.↗

Professor Created On-line Biology Laboratory Course

This paper will share the creation, implementation, and modification of an online college level general biology laboratory course offered for non-science majors as a part of a General Education Curriculum. The ability of professors to develop quality online laboratories will address a growing need in Higher Education as more institutions combine course sections and look for suitable alternative course delivery formats due to declining departmental budgets requiring reductions in staffing, equipment, and supplies. Also, there is an equal or greater need for more professors to develop the ability to create online laboratory experiences because many of the currently available online laboratory course packages from publishers do not always adequately parallel on-campus laboratory courses, or are not as aligned with the companion lecture sections. From a variety of scientific simulation and animation web sites, professors can easily identify material that closely fit the specific needs of their courses, instructional environment, and students that they serve. All too often, on-campus laboratory courses in the sciences provide what are termed confirmation experiences that do NOT allow students to experience science as would be carried out by scientists. Creatively developed online laboratory experiences can often provide the type of authentic investigative experiences that are not possible on-campus due to the time constraints of a typical two-hour, once-per-week-meeting laboratory course. In addition, online laboratory courses can address issues related to the need for students to more easily complete missing laboratory assignments, and to have opportunities to extend introductory exercises into more advanced undertakings where a greater sense of scientific discovery can be experienced. Professors are strongly encourages to begin creating online laboratory exercises for their courses, and to consider issues regarding assessment, copyrights, and Intellectual Property concerns.

Bowman, Arthur W.↗

Benefits Assessment of Algorithmically Combining Generic High Altitude Airspace Sectors

In today's air traffic control operations, sectors that have traffic demand below capacity are combined so that fewer controller teams are required to manage air traffic. Controllers in current operations are certified to control a group of six to eight sectors, known as an area of specialization. Sector combinations are restricted to occur within areas of specialization. Since there are few sector combination possibilities in each area of specialization, human supervisors can effectively make sector combination decisions. In the future, automation and procedures will allow any appropriately trained controller to control any of a large set of generic sectors. The primary benefit of this will be increased controller staffing flexibility. Generic sectors will also allow more options for combining sectors, making sector combination decisions difficult for human supervisors. A sector-combining algorithm can assist supervisors as they make generic sector combination decisions. A heuristic algorithm for combining under-utilized air space sectors to conserve air traffic control resources has been described and analyzed. Analysis of the algorithm and comparisons with operational sector combinations indicate that this algorithm could more efficiently utilize air traffic control resources than current sector combinations. This paper investigates the benefits of using the sector-combining algorithm proposed in previous research to combine high altitude generic airspace sectors. Simulations are conducted in which all the high altitude sectors in a center are allowed to combine, as will be possible in generic high altitude airspace. Furthermore, the algorithm is adjusted to use a version of the simplified dynamic density (SDD) workload metric that has been modified to account for workload reductions due to automatic handoffs and Automatic Dependent Surveillance Broadcast (ADS-B). This modified metric is referred to here as future simplified dynamic density (FSDD). Finally, traffic demand sets with increased air traffic demand are used in the simulations to capture the expected growth in air traffic demand by the mid-term.

Bloem, Michael↗

Verification and Implementation of Operations Safety Controls for Flight Missions

Approximately eleven years ago, the International Space Station launched the first module from Russia, the Functional Cargo Block (FGB). Safety and Mission Assurance (S&MA) Operations (Ops) Engineers played an integral part in that endeavor by executing strict flight product verification as well as continued staffing of S&MA's console in the Mission Evaluation Room (MER) for that flight mission. How were these engineers able to conduct such a complicated task? They conducted it based on product verification that consisted of ensuring that safety requirements were adequately contained in all flight products that affected crew safety. S&MA Ops engineers apply both systems engineering and project management principles in order to gain a appropriate level of technical knowledge necessary to perform thorough reviews which cover the subsystem(s) affected. They also ensured that mission priorities were carried out with a great detail and success.

Jones, Cheryl L.↗

Providing Housing, Food and Medical Support for 25,000 Katrina Evacuees with 12 Hours Notice: The Harris County Medical Support of the Superdome Evacuees

Hurricane Katrina was responsible for trapping 25,000 people in the New Orleans Superdome and isolating many others throughout Louisiana and Mississippi. The transport of these evacuees to the Reliant Park (Houston, Texas) used 500 buses each containing about 55 people. Processing the arriving evacuees included addressing their health status and medical needs as follows: an initial triage at disembarkation, a secondary triage in the Reliant Astrodome and Center, and definitive clinical care in the Reliant Arena "Katrina" Clinic. Baylor College of Medicine (BCM) physicians boarded buses and identified the sickest for emergency transport to Harris County Hospital District (HCHD) hospitals. BCM departments represented included pediatrics, family and community medicine, internal medicine, radiology, obstetrics and gynecology, orthopedics, surgery, and psychiatry. Astrodome and Center triage was managed by BCM physicians and staffed by HCHD Nurses and volunteers from Texas and beyond. The Reliant Astrodome, Center and Arena reached peak headcounts of 15,000,4500, and 2500, respectively Most evacuees visiting the triage sites in the Astrodome and Center were treated using "over-the-counter" medications with the remaining being transported to the "Katrina" clinic. The clinic was equipped with a lab, pharmacy, digital X-ray, and ultrasound machines in addition to electronic patient records created using 80 computer terminals. The Katrina clinic saw more than 15,000 patients during 15 days of operations (2,000 on the first full day), administered 10,000 tetanus shots, and filled thousands of prescriptions. At the peak of operations, the clinic saw 150 patients/hour with 25 physicians scheduled for each 12-hour shift. Approximately 900 people were transported to hospital emergency rooms. Within 3 weeks of arriving at the Reliant Park facilities, more than 90% of the families found permanent housing, enrolled children in schools, and found work. Using data obtained from manual and electronic medical records, this presentation will document the major milestones and lessons learned from this extraordinary project to help the Katrina evacuees.

Hamilton, Douglas↗

Configuring Airspace Sectors with Approximate Dynamic Programming

In response to changing traffic and staffing conditions, supervisors dynamically configure airspace sectors by assigning them to control positions. A finite horizon airspace sector configuration problem models this supervisor decision. The problem is to select an airspace configuration at each time step while considering a workload cost, a reconfiguration cost, and a constraint on the number of control positions at each time step. Three algorithms for this problem are proposed and evaluated: a myopic heuristic, an exact dynamic programming algorithm, and a rollouts approximate dynamic programming algorithm. On problem instances from current operations with only dozens of possible configurations, an exact dynamic programming solution gives the optimal cost value. The rollouts algorithm achieves costs within 2% of optimal for these instances, on average. For larger problem instances that are representative of future operations and have thousands of possible configurations, excessive computation time prohibits the use of exact dynamic programming. On such problem instances, the rollouts algorithm reduces the cost achieved by the heuristic by more than 15% on average with an acceptable computation time.

Bloem, Michael↗

Safety and Mission Assurance for In-House Design Lessons Learned from Ares I Upper Stage

This viewgraph presentation identifies lessons learned in the course of the Ares I Upper Stage design and in-house development effort. The contents include: 1) Constellation Organization; 2) Upper Stage Organization; 3) Presentation Structure; 4) Lesson-Importance of Systems Engineering/Integration; 5) Lesson-Importance of Early S&MA Involvement; 6) Lesson-Importance of Appropriate Staffing Levels; 7) Lesson-Importance S&MA Team Deployment; 8) Lesson-Understanding of S&MA In-Line Engineering versus Assurance; 9) Lesson-Importance of Close Coordination between Supportability and Reliability/Maintainability; 10) Lesson-Importance of Engineering Data Systems; 11) Lesson-Importance of Early Development of Supporting Databases; 12) Lesson-Importance of Coordination with Safety Assessment/Review Panels; 13) Lesson-Implementation of Software Reliability; 14) Lesson-Implementation of S&MA Technical Authority/Chief S&MA Officer; 15) Lesson-Importance of S&MA Evaluation of Project Risks; 16) Lesson-Implementation of Critical Items List and Government Mandatory Inspections; 17) Lesson-Implementation of Critical Items List Mandatory Inspections; 18) Lesson-Implementation of Test Article Safety Analysis; and 19) Lesson-Importance of Procurement Quality.

Anderson, Joel M.↗

Data Service Provider Cost Estimation Tool

The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

Fontaine, Kathy↗

Cost-Effective Telemetry and Command Ground Systems Automation Strategy for the Soil Moisture Active Passive (SMAP) Mission

Soil Moisture Active Passive (SMAP) is an Earth-orbiting, remote-sensing NASA mission slated for launch in 2014. The ground data system (GDS) being developed for SMAP is composed of many heterogeneous subsystems, ranging from those that support planning and sequencing to those used for real-time operations, and even further to those that enable science data exchange. A full end-to-end automation of the GDS may result in cost savings during mission operations, but it would require a significant upfront investment to develop such a comprehensive automation. As demonstrated by the Jason-1 and Wide-field Infrared Survey Explorer (WISE) missions, a measure of "lights-out" automation for routine, orbital pass, ground operations can still reduce mission costs through smaller staffing of operators and limiting their working hours. The challenge, then, for the SMAP GDS engineering team, is to formulate an automated operations strategy--and corresponding system architecture -- to minimize operator intervention during routine operations, while balancing the development costs associated with the scope and complexity of automation. This paper discusses the automated operations approach being developed for the SMAP GDS. The focus is on automating the activities involved in routine passes, which limits the scope to real-time operations. A key subsystem of the SMAP GDS -- NASA's AMMOS Mission Data Processing and Control System (AMPCS) -- provides a set of capabilities that enable such automation. Also discussed are the lights-out pass automations of the Jason-1 and WISE missions and how they informed the automation strategy for SMAP. The paper aims to provide insights into what is necessary in automating the GDS operations for Earth satellite missions.

soil moisture↗

Planning Coverage Campaigns for Mission Design and Analysis: Clasp for the Proposed DESDynI Mission

Mission design and analysis present challenges in that almost all variables are in constant flux, yet the goal is to achieve an acceptable level of performance against a concept of operations, which might also be in flux. To increase responsiveness, our approach is to use automated planning tools that allow for the continual modification of spacecraft, ground system, staffing, and concept of operations while returning metrics that are important to mission evaluation, such as area covered, peak memory usage, and peak data throughput. We have applied this approach to DESDynI (Deformation, Ecosystem Structure, and Dynamics of Ice) mission design concept using the CLASP (Compressed Large-scale Activity Scheduler/Planner) planning system [7], but since this adaptation many techniques have changed under the hood for CLASP and the DESDynI mission concept has undergone drastic changes, including that it has been renamed the Earth Radar Mission. Over the past two years, we have run more than fifty simulations with the CLASP-DESDynI adaptation, simulating different mission scenarios with changing parameters including targets, swaths, instrument modes, and data and downlink rates. We describe the evolution of simulations through the DESDynI MCR (Mission Concept Review) and afterwards.

DESDynI (Deformation, Ecosystem Structure, and Dyn↗

Cost-Effective Telemetry and Command Ground Systems Automation Strategy for the Soil Moisture Active Passive (SMAP) Mission

Soil Moisture Active Passive (SMAP) is an Earth-orbiting, remote-sensing NASA mission slated for launch in 2014.[double dagger] The ground data system (GDS) being developed for SMAP is composed of many heterogeneous subsystems, ranging from those that support planning and sequencing to those used for real-time operations, and even further to those that enable science data exchange. A full end-to-end automation of the GDS may result in cost savings during mission operations, but it would require a significant upfront investment to develop such comprehensive automation. As demonstrated by the Jason-1 and Wide-field Infrared Survey Explorer (WISE) missions, a measure of "lights-out" automation for routine, orbital pass ground operations can still reduce mission cost through smaller staffing of operators and limited work hours. The challenge, then, for the SMAP GDS engineering team is to formulate an automated operations strategy--and corresponding system architecture--to minimize operator intervention during operations, while balancing the development cost associated with the scope and complexity of automation. This paper discusses the automated operations approach being developed for the SMAP GDS. The focus is on automating the activities involved in routine passes, which limits the scope to real-time operations. A key subsystem of the SMAP GDS--NASA's AMMOS Mission Data Processing and Control System (AMPCS)--provides a set of capabilities that enable such automation. Also discussed are the lights-out pass automations of the Jason-1 and WISE missions and how they informed the automation strategy for SMAP. The paper aims to provide insights into what is necessary in automating the GDS operations for Earth satellite missions.

remote-sensing↗

Human Factors in Accidents Involving Remotely Piloted Aircraft

This presentation examines human factors that contribute to RPA mishaps and provides analysis of lessons learned. RPA accident data from U.S. military and government agencies were reviewed and analyzed to identify human factors issues. Common contributors to RPA mishaps fell into several major categories: cognitive factors (pilot workload), physiological factors (fatigue and stress), environmental factors (situational awareness), staffing factors (training and crew coordination), and design factors (human machine interface).