Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology milestones”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Experiences with the JPL telerobot testbed: Issues and insights

The Jet Propulsion Laboratory's (JPL) Telerobot Testbed is an integrated robotic testbed used to develop, implement, and evaluate the performance of advanced concepts in autonomous, tele-autonomous, and tele-operated control of robotic manipulators. Using the Telerobot Testbed, researchers demonstrated several of the capabilities and technological advances in the control and integration of robotic systems which have been under development at JPL for several years. In particular, the Telerobot Testbed was recently employed to perform a near completely automated, end-to-end, satellite grapple and repair sequence. The task of integrating existing as well as new concepts in robot control into the Telerobot Testbed has been a very difficult and timely one. Now that researchers have completed the first major milestone (i.e., the end-to-end demonstration) it is important to reflect back upon experiences and to collect the knowledge that has been gained so that improvements can be made to the existing system. It is also believed that the experiences are of value to the others in the robotics community. Therefore, the primary objective here will be to use the Telerobot Testbed as a case study to identify real problems and technological gaps which exist in the areas of robotics and in particular systems integration. Such problems have surely hindered the development of what could be reasonably called an intelligent robot. In addition to identifying such problems, researchers briefly discuss what approaches have been taken to resolve them or, in several cases, to circumvent them until better approaches can be developed.

Stone, Henry W.↗

An aeronautical mobile satellite experiment

The various activities and findings of a NASA/FAA/COMSAT/INMARSAT collaborative aeronautical mobile satellite experiment are detailed. The primary objective of the experiment was to demonstrate and evaluate an advanced digital mobile satellite terminal developed at the Jet Propulsion Laboratory under the NASA Mobile Satellite Program. The experiment was a significant milestone for NASA/JPL, since it was the first test of the mobile terminal in a true mobile satellite environment. The results were also of interest to the general mobile satellite community because of the advanced nature of the technologies employed in the terminal.

Jedrey, T. C.↗

Automation of planetary spacecraft

The development of autonomous spacecraft from 1960 to the present is traced within a framework of the definitions and measures of the level of autonomy. The attainment of milestones in the level of autonomy in spacecraft guidance and control is described in terms of the Mariner, Viking, Voyager, Galileo and Mark II (under development) spacecraft. The constant interplay between the definition of scientific mission goals and available technological capabilities is explored, along with current efforts to implement AI techniques and advanced software in spacecraft to allow reliable functioning in stressful conditions.

Varsi, G.↗

Mirror Technology for the International X-Ray Observatory (iXO) Mission

This slide presentation reviews the technology that is being used to fabricate, measure align and bond the segments for the mirror that is to be used for the International X-Ray Observatory. There are views of the manufacturing and testing equipment. Also the milestones for the development are discussed.

Zhang, Will↗

Milestone 4: Thrust structure concepts and IHM screening Graphite Composite Primary Structure (GCPS)

The first part of the task was to select up to three promising thrust structure constructions and to select materials for screening tests. Part of the nondestructive evaluation and inspection (NDE/I) and integrated health management (IHM) task is to acquire and develop NDE/I sensor technologies and to integrate those sensors into the full scale test articles which will be produced under the TA2 program. Review of the anticipated fault modes and the available sensor technology data indicates that three sensor technologies should be assessed for the in-situ monitoring of the composite primary structure elements. These are: ultrasonics (dry contact), acoustic emissions, and fiber optics (embedded or attached). In fact, a combination of sensor technologies will be needed to detect and evaluate the fault modes; not only do sensor technology have specific capabilities and applicability, but the three Gr/Ep primary structures being demonstrated under the TA2 effort have differing requirements based on their respective failure modes and designs.

Greenberg, H. S.↗

An aeronautical-mobile satellite experiment

The various activities and findings of a NASA/FAA/COMSAT/INMARSAT collaborative aeronautical mobile-satellite experiment are detailed. The primary objective of the experiment was to demonstrate and evaluate an advanced digital mobile-satellite terminal developed at the Jet Propulsion Laboratory under the NASA Mobile Satellite Program. The experiment was a significant milestone for NASA/JPL, since it was the first test of the mobile terminal in a true mobile-satellite environment. The results were also of interest to the general mobile-satellite community because of the advanced nature of the technologies employed in the terminal.

Jedrey, Thomas C.↗

Second International Conference on Near-Field Optical Analysis: Photodynamic Therapy and Photobiology Effects

The International NASA/DARPA Photobiology Conference held at the Johnson Space Center in Houston/TX demonstrated where low level laser therapy (LLLT), respectively low intensity light activated biostimulation (LILAB) and nanotechnological applications employing photobiomodulation techniques will presumably go in the next ten years. The conference was a continuation of the 1st International Conference on Nearfield Optical Analysis organized by Andrei Sommer (ENSOMA Lab, University of Ulm, Germany) in November 2000 at Castle Reisenburg, Germany, which started with a group of ten scientists from eight different countries. The 1st conference was co-sponsored by the American Chemical Society to evaluate the molecular mechanism of accelerated and normal wound healing processes. The 2nd conference was co-sponsored by DARPA, NASA-JSC and the Medical College of Wisconsin. Despite the short time between events, the 2nd conference hosted 40 international experts form universities, research institutes, agencies and the industry. The materials published here are expected to become milestones forming a novel platform in biomedical photobiology. The multidisciplinary group of researchers focused on LLLT/LILAB-applications under extreme conditions expected to have beneficial effects particularly in space, on submarines, and under severe battlefield conditions. The group also focused on novel technologies with possibilities allowing investigating the interaction of light with biological systems, molecular mechanisms of wound healing, bone regeneration, nerve regeneration, pain modulation, as well as biomineralization and biofilm formulation processes induced by nanobacteria.

Bulgher, Debra L.↗

Supporting research and technology for automotive Stirling engine development

The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.

Tomazic, W. A.↗

Silicon material task review

The objectives of the Flat-plate Solar Array (FSA) Project Silicon Material Task are to evaluate technologies, new and old; to develop the most promising technologies; to establish practicality of the processes to meet production, energy use, and economic criteria; and to develop an information base on impurities in polysilicon and to determine their effects on solar cell performance. The approach involves determining process feasibility, setting milestones for the forced selection of the processes, and establishing the technical readiness of the integrated process.

Lorenz, J. H.↗

Assessing the Performance Limits of Internal Coronagraphs Through End-to-End Modeling

As part of the NASA ROSES Technology Demonstrations for Exoplanet Missions (TDEM) program, we conducted a numerical modeling study of three internal coronagraphs (PIAA, vector vortex, hybrid bandlimited) to understand their behaviors in realistically-aberrated systems with wavefront control (deformable mirrors). This investigation consisted of two milestones: (1) develop wavefront propagation codes appropriate for each coronagraph that are accurate to 1% or better (compared to a reference algorithm) but are also time and memory efficient, and (2) use these codes to determine the wavefront control limits of each architecture. We discuss here how the milestones were met and identify some of the behaviors particular to each coronagraph. The codes developed in this study are being made available for community use. We discuss here results for the HBLC and VVC systems, with PIAA having been discussed in a previous proceeding.

Inner working angle (IWA)↗

Investigating the Simulink Auto-Coding Process

Model based program design is the most clear and direct way to develop algorithms and programs for interfacing with hardware. While coding "by hand" results in a more tailored product, the ever-growing size and complexity of modern-day applications can cause the project work load to quickly become unreasonable for one programmer. This has generally been addressed by splitting the product into separate modules to allow multiple developers to work in parallel on the same project, however this introduces new potentials for errors in the process. The fluidity, reliability and robustness of the code relies on the abilities of the programmers to communicate their methods to one another; furthermore, multiple programmers invites multiple potentially differing coding styles into the same product, which can cause a loss of readability or even module incompatibility. Fortunately, Mathworks has implemented an auto-coding feature that allows programmers to design their algorithms through the use of models and diagrams in the graphical programming environment Simulink, allowing the designer to visually determine what the hardware is to do. From here, the auto-coding feature handles converting the project into another programming language. This type of approach allows the designer to clearly see how the software will be directing the hardware without the need to try and interpret large amounts of code. In addition, it speeds up the programming process, minimizing the amount of man-hours spent on a single project, thus reducing the chance of human error as well as project turnover time. One such project that has benefited from the auto-coding procedure is Ramses, a portion of the GNC flight software on-board Orion that has been implemented primarily in Simulink. Currently, however, auto-coding Ramses into C++ requires 5 hours of code generation time. This causes issues if the tool ever needs to be debugged, as this code generation will need to occur with each edit to any part of the program; additionally, this is lost time that could be spent testing and analyzing the code. This is one of the more prominent issues with the auto-coding process, and while much information is available with regard to optimizing Simulink designs to produce efficient and reliable C++ code, not much research has been made public on how to reduce the code generation time. It is of interest to develop some insight as to what causes code generation times to be so significant, and determine if there are architecture guidelines or a desirable auto-coding configuration set to assist in streamlining this step of the design process for particular applications. To address the issue at hand, the Simulink coder was studied at a foundational level. For each different component type made available by the software, the features, auto-code generation time, and the format of the generated code were analyzed and documented. Tools were developed and documented to expedite these studies, particularly in the area of automating sequential builds to ensure accurate data was obtained. Next, the Ramses model was examined in an attempt to determine the composition and the types of technologies used in the model. This enabled the development of a model that uses similar technologies, but takes a fraction of the time to auto-code to reduce the turnaround time for experimentation. Lastly, the model was used to run a wide array of experiments and collect data to obtain knowledge about where to search for bottlenecks in the Ramses model. The resulting contributions of the overall effort consist of an experimental model for further investigation into the subject, as well as several automation tools to assist in analyzing the model, and a reference document offering insight to the auto-coding process, including documentation of the tools used in the model analysis, data illustrating some potential problem areas in the auto-coding process, and recommendations on areas or practices in the current Ramses model that should be further investigated. Several skills were required to be built up over the course of the internship project. First and foremost, my Simulink skills have improved drastically, as much of my experience had been modeling electronic circuits as opposed to software models. Furthermore, I am now comfortable working with the Simulink Auto-coder, a tool I had never used until this summer; this tool also tested my critical thinking and C++ knowledge as I had to interpret the C++ code it was generating and attempt to understand how the Simulink model affected the generated code. I had come into the internship with a solid understanding of Matlab code, but had done very little in using it to automate tasks, particularly Simulink tasks; along the same lines, I had rarely used shell script to automate and interface with programs, which I gained a fair amount of experience with this summer, including how to use regular expression. Lastly, soft-skills are an area everyone can continuously improve on; having never worked with NASA engineers, which to me seem to be a completely different breed than what I am used to (commercial electronic engineers), I learned to utilize the wealth of knowledge present at JSC. I wish I had come into the internship knowing exactly how helpful everyone in my branch would be, as I would have picked up on this sooner. I hope that having gained such a strong foundation in Simulink over this summer will open the opportunity to return to work on this project, or potentially other opportunities within the division. The idea of leaving a project I devoted ten weeks to is a hard one to cope with, so having the chance to pick up where I left off sounds appealing; alternatively, I am interested to see if there are any opening in the future that would allow me to work on a project that is more in-line with my research in estimation algorithms. Regardless, this summer has been a milestone in my professional career, and I hope this has started a long-term relationship between JSC and myself. I really enjoy the thought of building on my experience here over future summers while I work to complete my PhD at Missouri University of Science and Technology.

Gualdoni, Matthew J.↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable Exploration

Development of NASA's Space Launch System exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated for December 2017. In recognition of the current fiscal realities, SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. Current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. It is this version that will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. This configuration is also designed to evolve to 130 t lift capability that offers several benefits, such as reduced mission costs, simplified payload design, faster trip times, and lower overall risk for missions of national significance. The SLS Program formally transitioned from the formulation phase to implementation during the past year, passing its Preliminary Design Review in 2013 and completion of Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015. Among the Program's many accomplishments are manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and the main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. The result is a launch vehicle that will carry human and robotic exploration on the history-making missions in the coming decades. This paper will discuss the program and technical successes over the past year and provide a look at the milestones and challenges ahead.

Askins, Bruce↗

Advanced beamed-energy and field propulsion concepts

Specific phenomena which might lead to major advances in payload, range and terminal velocity of very advanced vehicle propulsion are studied. The effort focuses heavily on advanced propulsion spinoffs enabled by current government-funded investigations in directed-energy technology: i.e., laser, microwave, and relativistic charged particle beams. Futuristic (post-year 2000) beamed-energy propulsion concepts which indicate exceptional promise are identified and analytically investigated. The concepts must be sufficiently developed to permit technical understanding of the physical processes involved, assessment of the enabling technologies, and evaluation of their merits over conventional systems. Propulsion concepts that can be used for manned and/or unmanned missions for purposes of solar system exploration, planetary landing, suborbital flight, transport to orbit, and escape are presented. Speculations are made on the chronology of milestones in beamed-energy propulsion development, such as in systems applications of defense, satellite orbit-raising, global aerospace transportation, and manned interplanetary carriers.

Myrabo, L. N.↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

Advanced UVOIR Mirror Technology Development for Very Large Space Telescopes

The Advanced Mirror Technology Development (AMTD) project is in phase 2 of a multiyear effort, initiated in FY 2012. This effort is to mature, by at least a half Technology Readiness Level step, the critical technologies required to enable 4-meter or larger ultraviolet, optical, and infrared (UVOIR) space telescope primary mirror assemblies for both general astrophysics and ultra-high contrast observations of exoplanets. AMTD continues to achieve all of its goals and has accomplished all of its milestones to date. This has been achieved by assembling an outstanding team from academia, industry, and government with extensive expertise in astrophysics and exoplanet characterization, and in the design/manufacture of monolithic and segmented space telescopes; by deriving engineering specifications for advanced normal-incidence mirror systems needed to make the required science measurements; and by defining and prioritizing the most important technical problems to be solved. Our results have been presented to the CoPAG and Mirror Tech Days 2013, and proceedings papers of the 2013 and 2014 SPIE Optics & Photonics Symposia have been published.

Effinger, Mike↗

NASA Propagation Studies: Status

This paper presents the status of NASA propagation studies. The objective of the ACTS propagation campaign is to leverage NASA's Advanced Communications Technology Satellite (ACTS) in order to characterize radiowave propagation at Ka-band for utilization by U.S. industry and the space community. Topics discussed are: 1) Objective of ACTS propagation campaign; 2) Expected results and outputs of the ACTS propagation campaign; 3) ACTS propagation campaign milestones; and 4) New focus for NASA propagation studies.

Golshan, Nasser↗

Ground System Milestones: 20 Years of Earth Observing Satellite Mission Operations

Aqua, Aura, and Terra are Earth observing satellites that serve in the Earth Observing System (EOS). Terra, the flagship mission of the EOS, was launched in 1998. Aqua was launched in 2002 and Aura was launched in 2004. Each spacecraft was designed for a 6 year lifespan. Currently, each spacecraft meets all mission and science requirements. As technology advances, the onboard hardware and software remain the same, however, our ground system progresses. In the past twenty years, many changes have taken place. Our goal is to describe the life of the ground system from launch, to present day, and touch on our future plans. The focus of our presentation will be how EOS has and continues to modernize our ground system for the future. We would like to share our experiences and give insight into the operational challenges of a 20 year old ground system. Our hope is for future mission operators and those maintaining potential age defying satellites to use our past experiences and lessons learned for future operational concepts.

Barrett, Grant↗