Search NASA⌕ Search

SEARCH · Search NASA

Results for “telescope assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Evidence for Reduced Species Star Formation Rates in the Centers of Massive Galaxies at zeta = 4

We perform the first spatially-resolved stellar population study of galaxies in the early universe z equals 3.5 -6.5, utilizing the Hubble Space Telescope Cosmic Assembly Near-infrared Deep Extragalactic Legacy Survey (CANDELS) imaging dataset over the GOODS-S field. We select a sample of 418 bright and extended galaxies at z less than or approximately equal to 3.5-6.5 from a parent sample of approximately 8000 photometric-redshift selected galaxies from Finkelstein et al. We first examine galaxies at 3.5 less than or equal to z less than or approximately equal to 4.0 using additional deep K-band survey data from the HAWK-I UDS and GOODS Survey (HUGS) which covers the 4000 Angstrom break at these redshifts. We measure the stellar mass, star formation rate, and dust extinction for galaxy inner and outer regions via spatially-resolved spectral energy distribution fitting based on a Markov Chain Monte Carlo algorithm. By comparing specific star formation rates (sSFRs) between inner and outer parts of the galaxies we find that the majority of galaxies with the high central mass densities show evidence for a preferentially lower sSFR in their centers than in their outer regions, indicative of reduced sSFRs in their central regions. We also study galaxies at z approximately equal to 5 and 6 (here limited to high spatial resolution in the rest-frame ultraviolet only), finding that they show sSFRs which are generally independent of radial distance from the center of the galaxies. This indicates that stars are formed uniformly at all radii in massive galaxies at z approximately equal to 5-6, contrary tomassive galaxies at z. less than approximately equal to 4.

early universe – galaxies: bulges – galaxies: ↗

Charter and activities of the SIRTF in-orbit checkout focus integrated products team and optical performance of the CTA

We describe a strategy to determine the initial mirror spacing by quantitatively evaluating the shapes of the images formed by the telescope using the Infrared Array Camera and other science instruments. We show that this information can be used to predict the direction and magnitude of the secondary mirror move that will result in the telescope best focus. The tools used to evaluate focus position and optical quality of the in orbit CTA have been qualified during the BRUTUS test are here described.

Integrated↗

Augmented Method to Improve Thermal Data for the Figure Drift Thermal Distortion Predictions of the JWST OTIS Cryogenic Vacuum Test

The JWST Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and is scheduled for launch in 2018. The JWST OTE, including the 18 segment primary mirror, secondary mirror, and the Aft Optics Subsystem (AOS) are designed to be passively cooled and operate near 45K. These optical elements are supported by a complex composite backplane structure. As a part of the structural distortion model validation efforts, a series of tests are planned during the cryogenic vacuum test of the fully integrated flight hardware at NASA JSC Chamber A. The successful ends to the thermal-distortion phases are heavily dependent on the accurate temperature knowledge of the OTE structural members. However, the current temperature sensor allocations during the cryo-vac test may not have sufficient fidelity to provide accurate knowledge of the temperature distributions within the composite structure. A method based on an inverse distance relationship among the sensors and thermal model nodes was developed to improve the thermal data provided for the nanometer scale WaveFront Error (WFE) predictions. The Linear Distance Weighted Interpolation (LDWI) method was developed to augment the thermal model predictions based on the sparse sensor information. This paper will encompass the development of the LDWI method using the test data from the earlier pathfinder cryo-vac tests, and the results of the notional and as tested WFE predictions from the structural finite element model cases to characterize the accuracies of this LDWI method.

Thermal Modeling↗

Alignment techniques required by precise measurement of effective focal length

The characteristics of false color imagery produced by instrumentation on earth resource mapping satellites are examined. The spatial fidelity of the imagery is dependent upon the geometric accuracy (GA) and the band-to-band registration (BBR) with which the telescope instrument is assembled. BBR and GA require knowledge of telescope effective focal length (EFL) to one part in 10,000 in order that the next generation of earth mappers be able to carry out their missions. The basis for this level of precision is briefly considered, and a description is given of the means by which such precise EFL measurements have been carried out. Attention is given to accuracy requirements, the technique used to measure effective focal length, possible sources of error in the EFL measurement, approaches for eliminating errors, and the results of the efforts to control measurement errors in EFL determinations.

Wise, T. D.↗

PHyTIR - A Prototype Thermal Infrared Radiometer

This paper describes the PHyTIR (Prototype HyspIRI Thermal Infrared Radiometer) instrument, which is the engineering model for the proposed HyspIRI (Hyperspectral Infrared Imager) earth observing instrument. The HyspIRI mission would be comprised of the HyspIRI TIR (Thermal Infrared Imager), and a VSWIR (Visible Short-Wave Infra-Red Imaging Spectrometer). Both instruments would be used to address key science questions related to the earth's carbon cycle, ecosystems, climate, and solid earth properties. Data gathering of volcanic activities, earthquakes, wildfires, water use and availability, urbanization, and land surface compositions and changes, would aid the predictions and evaluations of such events and the impact they create. Even though the proposed technology for the HyspIRI imager is mature, the PHyTIR prototype is needed to advance the technology levels for several of the instrument's key components, and to reduce risks, in particular to validate 1) the higher sensitivity, spatial resolution, and higher throughput required for this focal plane array, 2) the pointing accuracy, 2) the characteristics of several spectral channels, and 4) the use of ambient temperature optics. The PHyTIR telescope consists of the focal plane assembly that is housed within a cold housing located inside a vacuum enclosure; all mounted to a bulkhead, and an optical train that consists of 3 powered mirrors; extending to both sides of the bulkhead. A yoke connects the telescope to a scan mirror. The rotating mirror enables to scan- a large track on the ground. This structure is supported by kinematic mounts, linking the telescope assembly to a base plate that would also become the spacecraft interface for HyspIRI. The focal plane's cooling units are also mounted to the base plate, as is an overall enclosure that has two viewing ports with large exterior baffles, shielding the focal plane from incoming stray light. PHyTIR's electronics is distributed inside and near the vacuum enclosure, and in a nearby rack. The data acquisition technique would be to take measurements over a 51deg wide swath in the cross spacecraft velocity direction, which is brought into view through the rotating scan mirror. A landscape mosaic thus can be assembled by overlaying rows of measurements. The paper briefly outlines the proposed HyspIRI mission and its data acquisition technique; it then describes the prototype PHyTIR instrument.

Space Instrument↗

RST Optical Telescope Integration and Test Preparation

The OTA for the Nancy Grace Roman Space Telescope includes the primary mirror, secondary mirror, and aft optics for guiding light into the Wide Field Instrument and the Coronagraph Instrument. The telescope is taking shape as the tested optical mirror assemblies are integrated. The assemblies have been thermal cycled to the cold temperatures for infrared operation, load tested to launch loads, vibration tested, and optically tested. Testing included launch-level vibration testing of the 2.4-meter light-weighted primary mirror assembly. In addition, the telescope control electronics (TCE) box has been fully assembled and the environmental testing of the TCE is progressing. Pictures and descriptions of the integration and test progress are provided, along with performance results measured at these levels of assemblies. Planning and test equipment preparation for the telescope thermal vacuum testing continues including plans to take advantage of the large dynamic range available with focus diversity phase retrieval and a Shack-Hartmann wavefront sensor for the gravity-sagged primary mirror.

Tony L Whitman↗

Development Of Composite Panels For Telescope Mirrors

Report describes continuing program for development of lightweight hexagonal graphite/epoxy composite panels intended to support precisely curved mirror surfaces assembled into large telescope mirror. Discusses development requirements, technical decisions, fabrication methods, measurements of properties of materials, analytical simulation, and thermal vacuum testing. Telescope flown in orbit around Earth to observe at wavelengths down to 30 micrometers.

Freeland, Robert E.↗

Operations analysis for a large lunar telescope

Consideration is given to a study of the operations and assembly of a 16-m large lunar telescope (LLT), which deals with the operations and assembly of the telescope from LEO to the lunar surface for assembly. The study of LLT operations and assembly is broken down into three divisions to allow easier operations analysis: earth to orbit operations, LEO operations (transfer to lunar surface operations), and lunar surface operations. The following guidelines were set down to ensure a reasonable starting point for a large, lunar, untended installation: the existence of a lunar base, a space transportation system from LEO to the lunar surface, continuous manning of the lunar base during the assembly period, and availability/capability to perform lunar assembly with the lunar base crew. The launch/vehicle packaging options, lunar site selection and assembly options, and assembly crew assumptions are discussed.

Thyen, Christopher↗

Using the ET for gamma-ray astronomy

A gamma-ray-telescope design is presented which makes use of the normally spent external tank (ET) of the Space Shuttle as the spacecraft and Cerenkov pressure vessel. The ET would be configured into the telescope once onorbit, using the Space Station as the base of operations for carrying out the assembly activities. The telescope provides a continuation to the NASA program in high-energy astrophysics, providing for follow-on observations to the survey work of the EGRET instrument on GRO. The most important features of the gamma-ray imaging telescope system are its collecting area of 250,000 sq cm per ET (40 times that of the EGRET instrument) and its ability to locate point sources to within several arc minutes.

Koch, D.↗

NASA James Webb Space Telescope Engineering of the Primary Mirror Segment Assemblies (PMSA) and the Primary Mirror Backplane Support Structure (PMBSS)

The design, engineering tests of the PMSAs PMBSS show that we have a robust system that not only meets but exceeds (better than) the design requirements for these components. In the next 2 years the Telescope Observatory will be subjected to a simulated launch environment (sine vibeacoustics) and operations tests at cryogenic temperatures. Launch is schedule for the last quarter of 2018.

PMBSS↗

Multi-Robot Assembly Scheduling for the Lunar Crater Radio Telescope on the Far-Side of the Moon

The Lunar Crater Radio Telescope (LCRT) is a pro- posed ultra-long-wavelength radio telescope to be constructed on the far side of the moon. The proposed telescope will be constructed by deploying a 1km wire mesh in a 3-5km crater using a team of wall-climbing DuAxel robots. In this work, we consider the problem of generating minimum-time assembly sequences for LCRT, using realistic models of travel speed and lighting. Specifically, we pose the assembly sequencing problem as a mixed-integer linear program (MILP), which we solve to global optimality using commercial solvers. We present methods for modeling time-varying travel and assembly times, based on variable lighting conditions (including crater shadowing), and show how such time-varying parameters can be incorporated into the MILP. Finally, we present numerical studies of our method, showing how makespan varies with the number of assembly robots.

Schwager, Mac↗

Precise thermal control test demonstration on simulated space telescope main ring

A simulated section of the main ring of the Space Telescope, (ST) the part that holds the primary mirror, was manufactured and tested for thermal stability characteristics in a complex structural assembly. The other telescope subassemblies are also mounted on the main ring, which is constructed of a titanium alloy. The entire ring is wrapped in heater elements around the outside diameter to reduce the external temperature gradient effects by two orders of magnitude. A thermal vacuum test was performed using a stainless steel alloy tailored to represent the titanium ring's thermal characteristics. The tests examined the thermal performance and controllability of the test ring, the effects of a 24-hr slew manuever that produced worst-case environment changes, hot and cold simulation of predicted ST orbital thermal environments, and the effects of heater failure. Pointing and thermal control features were verified, but a heater failure on the 'on' side was found to quickly lead to exceeding the thermal design limits.

Bettini, R. G.↗

The Roman Space Telescope Observatory Build, Test and Verification Status

The Nancy Grace Roman Space Telescope (“Roman”) was prioritized by the 2010 Decadal Survey in Astronomy and Astrophysics and is NASA’s next astrophysics flagship observatory. Launching no earlier than 2026, it will conduct several wide field and time domain surveys, as well as conduct an exoplanet census. Roman’s large field of view, agile survey capabilities, and excellent stability enable these objectives, yet present unique engineering and test challenges. The Roman Observatory comprises a Spacecraft and the Integrated Payload Assembly (IPA), the latter of which includes the Optical Telescope Assembly (OTA), the primary science Wide Field Instrument, a technology demonstration Coronagraph Instrument, and the Instrument Carrier, which meters the OTA to each instrument. The Spacecraft supports the IPA and includes the Bus, Solar Array Sun Shield, Outer Barrel Assembly, and Deployable Aperture Cover. It provides all required power, command handling, attitude control, communications, data storage, and stable thermal control functions as well as shading and straylight protection across the entire field of regard. This paper presents the Observatory as it begins integration and test, as well as describes key test and verification activities.

Infrared Missions↗

Self indexing latch system

A self-latching jaw assembly is described which includes a pair of jaws for latching a fitting of an associated structure such as the keel fitting of a space telescope. The jaw assembly automatically locates the fitting received on a positioning pedestal and latches it in its original location on the pedestal without need of precision alignment. The first jaw is actuated and moved to the right whereupon a reciprocating plunger, extended from the nose of the jaw senses the hub of the spool. A jaw position responsive switch is then actuated to terminate the drive motor of the jaw. The astronaut will then actuate the drive motor of the jaw and the jaw will move to the left, whereupon the standoff will engage the face of the jaw in a latching position. In the latching position, the noses of the jaws will be under the flanges of the spool.

John C Gibson↗

Engineering Specification for Large-aperture UVO Space Telescopes Derived from Science Requirements

The Advance Mirror Technology Development (AMTD) project is a three year effort initiated in FY12 to mature by at least a half TRL step six critical technologies required to enable 4 to 8 meter UVOIR space telescope primary mirror assemblies for both general astrophysics and ultra-high contrast observations of exoplanets. AMTD uses a science-driven systems engineering approach. We mature technologies required to enable the highest priority science AND result in a high-performance low-cost low-risk system. To provide the science community with options, we are pursuing multiple technology paths. We have assembled an outstanding team from academia, industry, and government with extensive expertise in astrophysics and exoplanet characterization, and in the design/manufacture of monolithic and segmented space telescopes. A key accomplishment is deriving engineering specifications for advanced normal-incidence monolithic and segmented mirror systems needed to enable both general astrophysics and ultra-high contrast observations of exoplanets missions as a function of potential launch vehicles and their mass and volume constraints.

Stahl, H. Philip↗