Search NASA⌕ Search

SEARCH · Search NASA

Results for “thermal response”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Defining Computational Emissivity Uncertainty Over Large Temperature Scales Due to Surface Evolution

There is a dearth in the literature on how to capture the uncertainty generated by material surface evolution in thermal modeling. This leads to inadequate or highly variable uncertainty representations for material properties, specifically emissivity when minimal information is available. Inaccurate understandings of prediction uncertainties may lead decision makers to incorrect conclusions, so best engineering practices should be developed for this domain. In order to mitigate the aforementioned issues, this study explores different strategies to better capture the thermal uncertainty response of engineered systems exposed to fire environments via defensible emissivity uncertainty characterizations that can be easily adapted to a variety of use cases. Here, two unique formulations (one physics-informed and one mathematically based) are presented. The formulations and methodologies presented herein are not exhaustive but more so are a starting point and give the reader a basis for how to customize their uncertainty definitions for differing fire scenarios and materials. Lastly, the impact of using this approach versus other commonly used strategies and the usefulness of adding rigor to material surface evolution uncertainty is demonstrated.

97 MATHEMATICS AND COMPUTING↗

Alaskan carbon-climate feedbacks will be weaker than inferred from short-term manipulations: Alaskan Benchmark Data and Model runs

This submission aimed to assess differences in short-term step warming manipulations and long-term chronic response to climate change in Alaskan ecosystems. Briefly, climate warming is occurring fastest at high latitudes. Based on short-term field experiments, this warming is projected to stimulate soil organic matter decomposition, and promote a positive feedback to climate change. We show here that the tightly coupled, nonlinear nature of high-latitude ecosystems implies that short-term (< 10 year) warming experiments produce emergent ecosystem carbon stock temperature sensitivities inconsistent with emergent multi-decadal responses. We first demonstrate that a well-tested mechanistic ecosystem model accurately represents observed carbon cycle and active layer depth responses to short-term summer warming in four diverse Alaskan sites. We then show that short-term warming manipulations do not capture the non-linear, long-term dynamics of vegetation, and thereby soil organic matter, that occur in response to thermal, hydrological, and nutrient transformations belowground. Our results demonstrate significant spatial heterogeneity in multi-decadal Arctic carbon cycle trajectories and argue for more mechanistic models to improve predictive capabilities.The model used in the current study is available publicly (https://github.com/jinyun1tang/ECOSYS), and the current submission contains the python/ matlab codes for analyzing output from the model (includng a readme file to explain the codes). The benchmark data, also enclosed, was collected from a range of published and publicly available sources (extracted using GRABIT: https://www.mathworks.com/matlabcentral/fileexchange/7173-grabit). These sources describe warming induced changes in tundra/ boreal ecosystems.

54 ENVIRONMENTAL SCIENCES↗

MELCOR

MELCOR is a fully integrated, engineering-level computer code for modeling the progression of severe accidents in light water reactors (LWR) at nuclear power plants and nuclear fuel cycle facilities. Originally developed to assess severe accidents following Three Mile Island, MELCOR’s flexible modeling framework has enabled it to be applied to safety assessments of a much broader range of nuclear power reactor designs and other types of nuclear facilities processing radioactive material. Further, MELCOR can model a broad spectrum of severe accident phenomena such as thermal-hydraulic response in a reactor coolant system; core heat-up, degradation, and relocation; and transport behavior in both boiling water and pressurized water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Interaction of Concentrated (68%) Aqueous Nitric Acid Solutions with Cheesecloth: A TGA-DSC-MS Study

The exposure of cotton cheesecloth to concentrated aqueous solutions of nitric acid reduced the onset of combustion by 30-40°C (from ~350°C to ~310°C) relative to that of both unexposed cheesecloth and cheesecloth that was rinsed immediately following exposure to the same solution. Cheesecloth exposed to concentrated (68%) nitric acid underwent three exothermic pre-combustion reactions which onset at 125-135°C, 160- 170°C and 200-210°C. These reactions give off mostly water vapor, with lesser amounts of NO and carbon dioxide. Exposure to concentrated nitric acid damages the cellulose polymers, oxidizing them, reducing them in length, and increasing their reactivity in response to thermal stress. Cheesecloth which was rinsed after exposure behaved similarly to unexposed cheesecloth, indicating that NC was not formed on exposure to the concentrated aqueous nitric acid solution. The addition of a 239Pu – 241Am spike in an aqueous nitric – hydrofluoric solution to the cheesecloth reduced the onset temperature of the first exothermic reaction to 126°C and lowered the onset temperature of combustion from ~310°C to ~275°C. When dried on to cellulose substrates in the presence of excess nitrate, metal ions may act as oxidizers, or may catalyze the oxidation of the carbonaceous material, lowering ignition temperatures. No evidence for the formation of nitrocellulose following the exposure of cheesecloth to nitric acid was observed during this study

36 MATERIALS SCIENCE↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Physics System-level Simulations of a Generic Pebble Bed High-Temperature Gas Cooled Reactor with Coupled SAM/Griffin Model

A SAM model for a 200 MWth generic pebble bed high-temperature gas-cooled reactor (PBHTGR) is presented in this work. As an extension to the modeling effort from FY-22 (Ooi et al. (2022)), an improved core channel approach is used to model the pebble bed of the reactor. The improvement greatly simplifies the model and reduces the run time of the model. Furthermore, the SAM model is coupled to the Griffin reactor physics model from Stewart et al. (2021) using the MOOSE MultiApp system where neutronics calculations are performed by the Griffin model and thermal hydraulics calculations by the SAM model. Favorable predictions are produced by the SAM/Griffin coupled model for steady-state normal operating condition. A load-following transient is also simulated with the coupled model where the neutronics and thermal hydraulics responses of the core are predicted correctly by the model. A protected Pressurized Loss of Forced Cooling (PLOFC) accident is simulated with the SAM model, in which the reactor power is determined using the decay heat curve, and therefore the Griffin model is not needed and thus decoupled. A simplified RCCS (Reactor Cavity Cooling System) loop is added to the model to remove decay heat from the core during the transient. Qualitatively, the prediction by the SAM model matches the expected behavior of a PB-HTGR during a PLOFC accident.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DECOVALEX-2023: Task E Final Report

This is the Task E final report for DECOVALEX-2023. Task E is focused on understanding thermal, two-phase hydrological, and mechanical (TH2M) processes, especially related to predicting brine migration in the excavation damaged zone around a heated excavation in salt. Salt is attractive as a disposal medium for radioactive waste because it is self-healing and is essentially impermeable and essentially non-porous in the far field (away from excavations). Investigation of the short-term (days to years) near-field (centimeters to tens of meters) behavior of salt is important for radioactive waste disposal because this early period strongly controls the amount of brine in a salt repository. Brine leads to corrosion of waste forms and waste packages, and possible dissolution of radionuclides with brine transport being a potential transport vector to the accessible environment. The main test case used in Task E is the ongoing Brine Availability Test in Salt (BATS) heater test located underground at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, USA. The Task was divided into a series of Steps. Step 0 was an introduction to processes in salt, that included matching historical unheated brine inflow data from boreholes at WIPP and matching temperature observations during BATS heater test 1a. Step 1 included validation of models against a thermo-poroelastic analytical solution relevant to heated boreholes in salt, and two-phase flow around an excavation in salt. Step 2 required all the individual components covered in steps 0 and 1 to come together to match observed brine inflow behavior during the BATS 1a heater test. There were a range of approaches from the teams, from mechanistic to prescriptive. Given the uncertainties in the problem, some teams used one- or two-dimensional models of the processes, while other teams included more geometrical complexity in three-dimensional models. The key learning points from Task E have been: • Heat conduction through salt typically requires non-linear thermal conductivity (as a function of temperature), but most models do a good job matching observations, given appropriate adjustments to the applied power and some thermocouple locations. • Thermal pressurization requires coupled thermal-hydrological-mechanical (THM) responses that consider the thermal expansion of the fluid and solid phases. • Initialization of two-phase flow models around a borehole or excavation in salt are more realistically represented as “wetting up”, rather than “drying down” (i.e., the initial state after excavation is mostly dry, rather than mostly wet). • The BATS 1a heater test includes a significant release of brine after the end of heating, which requires a large increase in permeability to recreate. Task E has been a great learning experience for all the teams involved, and feedback from the modeling teams has led to changes in the design of follow-on BATS experiments, which are now ongoing underground at WIPP. There was a balance throughout the task between freedom to model phenomena how each team saw fit, and prescriptiveness in problem design to bring the modeling teams closer together to allow attribution of smaller differences between models to different modeling choices. The modeling approaches seem to go through two phases: an early phase of discovery or testing, and a later phase of refinement and improvement. In future modeling efforts, different field data could be used (e.g., BATS 2) and more time should be included in the processes for teams to make multiple model refinement or even significant changes to their conceptual model or setup, based on lessons learned from the modeling exercise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES)

The C2SAGES project evaluated the feasibility of a community geothermal system for the planned Windy Ridge affordable housing development in Hinesburg, Vermont. Led by GTI Energy with Vermont Gas Systems, LN Consulting, NREL, and Frontier Energy, the work assessed technical design, energy performance, costs, business models, community engagement, maintenance, workforce development, and permitting. The proposed system was designed to serve 100% of the development’s heating, cooling, and domestic hot water loads. Compared with a baseline using air-source heat pumps and natural gas water heating, the geothermal system was estimated to reduce HVAC and domestic hot water energy use by about 45% to 48%, lower operating and maintenance costs, and reduce 30-year life-cycle costs by 37% for Phase 1 and 10% for Phase 2. Technical testing and modeling indicated that the Windy Ridge site is suitable for a community-scale geothermal system. The project also developed borehole field layouts, piping concepts, pump house designs, controls, maintenance plans, and supporting engineering drawings. The business model analysis found that first cost, ownership structure, and customer affordability remain major deployment challenges. Utility-led maintenance and operation were viewed favorably, but traditional utility cost-recovery models may require subsidy or revised financing structures to be practical for affordable housing. Community engagement highlighted the need for clear public education, transparent financing, reliable long-term maintenance, trained technicians, and the potential to pair geothermal systems with weatherization. Overall, the report concludes that community geothermal is technically feasible and offers meaningful energy, emissions, and life-cycle cost benefits, but broader deployment will depend on workable financing models and workforce readiness.

15 GEOTHERMAL ENERGY↗

Brief communication: Decadal changes in topography, surface water and subsurface structure across an Arctic coastal tundra site

Abstract. In ice-rich polygonal tundra, spatiotemporal heterogeneity in ground-ice melt reshapes topography, impacting infrastructure, water and carbon cycles. This study evaluates changes in topography and subsurface structure at a coastal Arctic site by comparing data from two surveys conducted a decade apart. Each survey includes electrical resistivity tomography, active layer thickness, photogrammetry, and topographic data. Results reveal subsidence and decrease in permafrost table elevation with varying intensity and spatial distribution across polygons, alongside diverse thermal-hydrological responses, such as thermokarst pool formation in high-centered-polygons and more even subsidence in flat-centered-polygons. The study also underscores the value and limitations of sporadic surveys.

Bachman, Jonathan A↗

Stent with expandable foam

A system comprising first, second, and third shape memory polymers (SMPs); wherein (a) the first SMP is a biodegradable open cell foam that includes a first channel; (b) the second SMP includes a second channel and is included in the first channel; (c) the foam is in a first state and is configured to expand to a second state, radially outward from the second foam, in response to thermal stimulus; (d) the third SMP is between the first and second SMPs and includes a stent having a first strut that includes the third SMP and a second strut that includes the third SMP; and (e) each of the first, second, and third SMPs is coupled to a wire.

Wilson, Thomas S.↗

Substrate availability and not thermal acclimation controls microbial temperature sensitivity response to long-term warming

Microbes are responsible for cycling carbon (C) through soils, and predicted changes in soil C stocks under climate change are highly sensitive to shifts in the mechanisms assumed to control the microbial physiological response to warming. Two mechanisms have been suggested to explain the long-term warming impact on microbial physiology: microbial thermal acclimation and changes in the quantity and quality of substrates available for microbial metabolism. Yet studies disentangling these two mechanisms are lacking. To resolve the drivers of changes in microbial physiology in response to long-term warming, we sampled soils from 13- and 28-year-old soil warming experiments in different seasons. We performed short-term laboratory incubations across a range of temperatures to measure the relationships between temperature sensitivity of physiology (growth, respiration, carbon use efficiency, and extracellular enzyme activity) and the chemical composition of soil organic matter. We observed apparent thermal acclimation of microbial respiration, but only in summer, when warming had exacerbated the seasonally-induced, already small dissolved organic matter pools. Irrespective of warming, greater quantity and quality of soil carbon increased the extracellular enzymatic pool and its temperature sensitivity. We propose that fresh litter input into the system seasonally cancels apparent thermal acclimation of C-cycling processes to decadal warming. Our findings reveal that long-term warming has indirectly affected microbial physiology via reduced C availability in this system, implying that earth system models including these negative feedbacks may be best suited to describe long-term warming effects on these soils.

59 BASIC BIOLOGICAL SCIENCES↗

Compounds and composition for preparation of lithium-loaded plastic scintillators

A scintillator material includes a polymer matrix, a primary dye in the polymer matrix, the primary dye being a fluorescent dye; a secondary dye, and a Li-containing compound in the polymer matrix, where the Li-containing compound is a Li salt of a short-chain aliphatic acid. In addition, the scintillator material exhibits an optical response signature for thermal neutrons that is different than an optical response signature for fast neutrons.

Zaitseva, Natalia P.↗

Temperature-responsive smart tracers for field-measurement of inter-well thermal evolution: Heterogeneous kinetics and field demonstration

Temperature-responsive smart tracers enable advanced warning of a “premature thermal breakthrough” and may therefore improve reservoir management and reduce financial risk. A successful calculation of inter-well fluid temperatures requires that temperature-dependent kinetics are known, which typically result from homogeneous batch reactor experiments. However, recent meso-scale field experiments at the Altona Field Laboratory involving fluid flow in a discretely-fractured reservoir suggest that silica-fluid interfaces may accelerate hydrolysis kinetics. Here, the Arrhenius parameters of phenyl acetate hydrolysis are investigated under heterogeneous reaction conditions in packed-bed column experiments. The breakthrough curve of the reaction product is compared to an inert reference tracer (carbon-cored nanoparticles). Temperatures experienced during field testing ranging from 10 to 40 °C were studied using a phosphate buffer solution to maintain a near-neutral pH, as found in the reservoir. The empirically-determined pre-exponential factor and activation energy values are subsequently used in a first-order kinetic model to improve calculations of effective reservoir temperatures for these meso-scale field tests. Here, the results suggest that hydrolysis reactions can directly monitor inter-well reservoir temperatures, but only if the influence of solid-fluid interactions are carefully accounted for.

15 GEOTHERMAL ENERGY↗

Effect of thermal aging on microstructure and crack growth response of Alloy 152 weld

Nickel-based Alloy 690 and the associated weld Alloys 52 and 152 are typically used for nozzle penetrations in replacement heads for pressurized water reactor (PWR) vessels, because of their excellent overall resistance to general corrosion and environmental degradation, primarily stress corrosion cracking (SCC). However, many of the existing PWRs are expected to operate for 40-80 years. Likewise, advanced water-cooled small modular reactors (SMRs) will use Ni-Cr alloys and are expected to receive initial operating licenses for 60 years. Hence, the thermal stability of Ni-Cr alloys is a potential concern for the long-term performance of both existing and advanced nuclear power plants, and possibly spent fuel storage containers. The objective of this research is to understand the microstructural changes occurring in high-Cr, Ni-based Alloy 152 weldments during long time exposure to the reactor operating temperatures, and the effect of these changes on the service performance. One area of particular concern is the potential for long range ordering (LRO), i.e. formation of the intermetallic Ni2Cr phase under prolonged exposure to reactor temperatures and/or irradiation, which can increase strength, decrease ductility, and cause dimensional changes or lead to in-service embrittlement of components made with these alloys. Hence, this research focused on the microstructural evolution and the SCC response of Alloy 152 under accelerated thermal aging. The materials studied involved three heats of Alloy 152 used to produce a dissimilar metal weld (DMW) joining an Alloy 690 plate to an Alloy 533 low alloy steel (LAS) plate, thermally aged at three different temperatures (370°C, 400°C and 450°C) for up to 75,000h (equivalent to 60 years of service). The microstructural characterization by means of synchrotron X-ray did not find evidence of LRO in any of the three heats aged to an equivalent of 60 years of service. Testing in a primary water environment of a heat of Alloy 152 aged at 370°C to a 60-year service equivalent revealed a fatigue and corrosion fatigue crack growth responses similar to those measured on the un-aged alloy. However, the SCC CGR response of the aged sample appears to show a deterioration in performance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗