Search NASA⌕ Search

SEARCH · Search NASA

Results for “tribes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

An Information Template for Evaluating the Relative Priority of Remediation Projects that Pose a Risk to Receptors - 18674

The U.S. Department of Energy (DOE) has one of the largest remediation tasks in the world, in terms of the number of sites, the complexity of individual sites, the number of remediation projects at individual sites, and the full range of stakeholders involved. The question of how to decide what projects to initiate, at any point of time and how to prioritize the deployment of resources for these tasks, occurs both within and among sites. The Consortium for Risk Evaluation developed a Risk-informed Prioritization Framework for Oak Ridge Reservation. Our goal was to develop a risk-informed methodology for prioritizing remediation projects for the Department of Energy's Oak Ridge Reservation that can be adapted to other remediation projects elsewhere. The heart of the framework is a template that includes information about each site necessary to make prioritization decisions. The information in the template describes the environment (hazard, pathway, consequences), the receptors (workers, public, ecological) and the risk management considerations (cost, risk reduction effectiveness, capacity, efficiency and sequencing). The questions in the template provide a wide range of information that managers and regulators need to make decisions, and that Tribes and the public need to evaluate the efficacy of remediation decisions. Completing the template will also help identify data gaps, model parameters needed, and the agencies or individuals responsible for obtaining the information. The information presented in the Template will be useful for regulators (DOE, Environmental Protection Agency, states, Tribes), managers and workers at the sites, trustees of natural resources, site neighbors, and the general public, but more importantly, provides an example of information needed to rate the priority of remediation projects. DOE, other federal and state trustees, and regulators were included in all phases of the development, including the scope, overseeing its development, and evaluation of projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing SNF from Nuclear Power Plant Sites - Pilgrim Site Visit - 20048

The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM)a conducted an evaluation of removing spent nuclear fuel (SNF) from the Pilgrim site on November 4-8, 2019. The Pilgrim site is located on the western shore of Cape Cod Bay in the Town of Plymouth, Massachusetts, about 61 km southeast of Boston and 71 km east of Providence, Rhode Island. Participants in the site visit included the U.S. Department of Energy, Oak Ridge National Laboratory, Pacific Northwest National Laboratory, the state of Massachusetts, the Federal Railroad Administration, the U.S. Coast Guard, the U.S. Army Corps of Engineers, the Mashpee Wampanoag Tribe, the Consolidated Group of Tribes and Organizations, the Council of State Governments-Eastern Regional Conference, the Pilgrim Nuclear Decommissioning Citizens Advisory Panel, and the Massachusetts Coastal Railroad. The Pilgrim site was found to have two transportation mode options for the removal of SNF, offsite rail access and onsite barge access. Two offsite heavy haul truck to rail transload locations were evaluated, one in Middleborough, Massachusetts, about 35-47 km from the Pilgrim site, and a second location in Middleborough about 36-43 km from the Pilgrim site. A passenger railroad terminates in Plymouth, Massachusetts, about 11 km from the Pilgrim site; however, this location is not suitable for freight rail involving large SNF transportation casks. There is also an onsite barge facility located on the Pilgrim site that was used during construction and would require refurbishment to be used. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fish Friendly Water Rules' Impact On the Power Grid with High VRE Levels

Columbia River basin multipurpose reservoirs are operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. When conventional thermal power plants are retired, hydropower flexibility balances the wind and solar variability of the power grid and provides grid services to maximize the high renewable power absorption. On the other hand, over-reliance on hydropower could harm the river basin fish habitat. For example, water release pulses during peak electricity demand hours and shorter-term water release variation could harm the fish population. Power grid planners, environmentalists, Columbia Basin tribes, hydro regulators, and water resource planners work together to understand the impacts of Columbia River basin operation in a fish-friendly way in the current power grid and power grid with higher renewable power share. We examine different levels of renewable share in the Western Interconnection to understand the multiple weather years and future climate projection and operating scenario impact on the power grid and water system. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

environmental↗

Clean Energy to Communities: Gap Region Outreach Project

The Clean Energy to Communities (C2C) program provides expertise and tools to local and regional governments, Tribes, community-based organizations, municipal utilities, and rural electric cooperatives to help them achieve their clean energy goals. The U.S. Department of Energy (DOE) launched C2C in 2022, following engagement with more than 150 stakeholders representing 95 communities in 40 states and 6 Tribes. The program offers three levels of support: expert match, peer-learning cohorts, and in-depth partnerships. In its first year, C2C worked with over 150 communities. To ensure broad participation, the National Renewable Energy Laboratory (NREL) examined regional representation. This analysis revealed that four regions are under-represented in program participation: Gulf South, Appalachia, Midwest, and Northern Plains. To help address these gaps, NREL led an effort to identify barriers faced by potential C2C participants from these regions and develop strategies to facilitate participation. This document summarizes findings from this effort and provides recommendations for program changes.

C2C↗

Getting Electric Vehicle Ready in Indian Country

As electric vehicles (EV) become more common, Tribes can guide how charging infrastructure is planned, approved, and built on Tribal lands. Tribes can prepare for future infrastructure projects by updating codes, zoning, parking rules, and permitting process, as well as improving electrical infrastructure and broadband access.

33 ADVANCED PROPULSION SYSTEMS↗

AN INTEGRATED BIOLOGICAL CONTROL SYSTEM AT HANFORD

In 1999 an integrated biological control system was instituted at the U.S. Department of Energy's Hanford Site. Successes and changes to the program needed to be communicated to a large and diverse mix of organizations and individuals. Efforts at communication are directed toward the following: Hanford Contractors (Liquid or Tank Waste, Solid Waste, Environmental Restoration, Science and Technology, Site Infrastructure), General Hanford Employees, and Hanford Advisory Board (Native American Tribes, Environmental Groups, Local Citizens, Washington State and Oregon State regulatory agencies). Communication was done through direct interface meetings, individual communication, where appropriate, and broadly sharing program reports. The objectives of the communication efforts was to have the program well coordinated with Hanford contractors, and to have the program understood well enough that all stakeholders would have confidence in the work performed by the program to reduce or elimated spread of radioactive contamination by biotic vectors. Communication of successes and changes to an integrated biological control system instituted in 1999 at the Department of Energy's Hanford Site have required regular interfaces with not only a diverse group of Hanford contractors (i.e., those responsible for liquid or tank waste, solid wastes, environmental restoration, science and technology, and site infrastructure), and general Hanford employees, but also with a consortium of designated stake holders organized as the Hanford Advisory Board (i.e., Native American tribes, various environmental groups, local citizens, Washington state and Oregon regulatory agencies, etc.). Direct interface meetings, individual communication where appropriate, and transparency of the biological control program were the methods and outcome of this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Biomass Feasibility Analysis Report

Feasibility study to determine technical and economic viability of a co-generation biomass fuel power plant for the Confederated Salish and Kootenai Tribes.

09 BIOMASS FUELS↗

Solar Energy Partnership Initiative (SEPI)

The primary scope of work is composed of the design, installation, inspection, and interconnection of ten grid-tied, solar photovoltaic (PV) systems, totaling approximately 58 kW rated capacity, on existing income qualified single-family homes located on the Rosebud Sioux Reservation. The project will provide approximately 40% savings in displaced electricity and tenants will be educated on energy efficiency and renewable energy. Tribal job trainees and community volunteers will assist with the installations, gaining valuable hands-on experience. The period of performance includes energy savings verification of the annual electricity offset for each installed system. In an effort to establish a long term thriving solar PV industry on the Rosebud Sioux Tribe seeks to partner with a Vendor to install approximately ten solar PV clean energy systems on homes. The Project has the following measurable objectives: install ten grid-tied, residential solar PV systems for income qualified families living on the Rosebud Reservation thereby offsetting approximately 39% of total kBtu in electricity usage. The systems will generate approximately $\$221,300$ worth of power for low-income families over the lifespans, while eliminating an estimated 2,020 tons of greenhouse gas emissions. Carrying out these installations will also provide hands-on solar installation training to approximately 15 Tribal trainees from the Housing Authority, Sinte Gleska University and interested community members.

14 SOLAR ENERGY↗

Coeur Center Solar Project

This project consisted of installing a 35.2kW rooftop solar photovoltaic system located at the Coeur Center Family and Youth Center, operated by the Coeur d’Alene Tribe’s Marimn Health and Wellness, in Worley, Idaho.

Coeur d’Alene↗

Bishop Paiute Weatherization Training Program

The DOE Weatherization Training Grant assisted Native American trainees in developing weatherization competencies, creating employment opportunities for Bishop Paiute tribal members in a growing field. The trainees completed all the necessary training and certification requirements and delivered high-quality weatherization services on the Bishop Paiute Reservation. Six tribal members received all three certifications for weatherization; four of the trainees are currently employed. The public benefit includes (1) development of marketable skills by low-income Native individuals, (2) employment for low-income Native individuals in a growing industry, and (3) economic development opportunities that were previously not available to these individuals or the Tribe.

99 GENERAL AND MISCELLANEOUS↗

Advancing Next-Generation Energy in Indian Country (Fact Sheet)

This fact sheet provides information on Tribes in the lower 48 states selected to receive assistance from the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Human Capacity Building Grant for Renewable energy development (Final Report)

Warm Springs Power and Water Enterprise (WSPWE), a Corporate Entity of the Confederated Tribes of Warm Springs Oregon, developed and distributed written materials, held workshops and field trips to educate tribal members on renewable energy projects that are a possibility utilizing resources on reservation. In order to build stronger public and Tribal Council support for the development of renewable energy projects on the reservation, WSPWE conducted a 12 month public education and technical expertise development program. The objectives of this program were to: To build a knowledge base within the tribal community regarding renewable energy development potential and opportunities on reservation lands. To educate the tribal community regarding development process, impacts and benefits. To increase the technical expertise of tribal government and Tribal Council.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Human Capacity Building Grant for Renewable energy development (Final Report)

Warm Springs Power and Water Enterprise (WSPWE), a Corporate Entity of the Confederated Tribes of Warm Springs Oregon, developed and distributed written materials, held workshops and field trips to educate tribal members on renewable energy projects that are a possibility utilizing resources on reservation. In order to build stronger public and Tribal Council support for the development of renewable energy projects on the reservation, WSPWE conducted a 12 month public education and technical expertise development program. The objectives of this program were to: To build a knowledge base within the tribal community regarding renewable energy development potential and opportunities on reservation lands. To educate the tribal community regarding development process, impacts and benefits. To increase the technical expertise of tribal government and Tribal Council.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geospatial Analysis of Renewable Energy Technical Potential on Tribal Lands

This technical report uses an established geospatial methodology to estimate the technical potential for renewable energy on tribal lands for the purpose of allowing Tribes to prioritize the development of renewable energy resources either for community scale on-tribal land use or for revenue generating electricity sales.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Renewable Energy Project Development Assistance (Fact Sheet)

This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Report for the Soboba Strategic Tribal Energy Planning Project

In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hualapai Wind Project Feasibility Report

The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

17 WIND ENERGY↗

Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community

In 2011 the Inter-Tribal Council of Michigan, Inc. was awarded an Energy Efficiency Development and Deployment in Indian Country grant from the U.S. Department of Energy’s Tribal Energy Program. This grant aimed to study select Bay Mills Indian Community community/government buildings to determine what is required to reduce each building’s energy consumption by 30%. The Bay Mills Indian Community (BMIC) buildings with the largest expected energy use were selected for this study and included the Bay Mills Ellen Marshall Health Center building, Bay Mills Indian Community Administration Building, Bay Mills Community College main campus, Bay Mills Charter School and the Waishkey Community Center buildings. These five sites are the largest energy consuming Community buildings and comprised the study area of this project titled “Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community”. The end objective of this study, plan and the Tribe is to reduce the energy consumption at the Community’s most energy intensive buildings that will, in turn, reduce emissions at the source of energy production, reduce energy expenditures, create long lasting energy conscious practices and positively affect the quality of the natural environment. This project’s feasibility study and resulting plan is intended to act as a guide to the Community’s first step towards planned energy management within its buildings/facilities. It aims to reduce energy consumption by 30% or greater within the subject facilities with an emphasis on energy conservation and efficiency. The energy audits and related power consumption analyses conducted for this study revealed numerous significant energy conservation and efficiency opportunities for all of the subject sites/buildings. In addition, many of the energy conservation measures require no cost and serve to help balance other measures requiring capital investment. Reoccurring deficiencies relating to heating, cooling, thermostat setting inefficiencies, powering computers, lighting, items linked to weatherization and numerous other items were encountered that can be mitigated with the energy conservation measures developed and specified during the course of this project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗