Search NASA⌕ Search

SEARCH · Search NASA

Results for “work planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Earth Observations into Action: Systemic Integration of Earth Observation Applications into National Risk Reduction Decision Structures

As stated in the United Nations Global Assessment Report 2022 Concept Note, decision makers everywhere need data and statistics that are accurate, timely, sufficiently disaggregated, relevant, accessible, and easy to use. The purpose of this paper is to demonstrate scalable and replicable methods to advance and integrate the use of Earth observation, specifically ongoing efforts within the Group on Earth Observations Work Programme and the Committee on Earth Observation Satellites Work Plan, to support risk-informed decision making, based on documented national and subnational needs and requirements.

earth observations↗

Stand Alone Electrical Equipment PRL 227a (Formerly PRL 227 LOC3) Confirmatory Sampling Report Addendum

HydroGeoLogic, Inc. (HGL) prepared this Confirmatory Sampling Report Addendum (CSRA) for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida. PRL 227a Location of Concern (LOC) 3 is located on 10th Street, west of the former Vertical Processing Facility (M7-1469), SWMU 077. The Load Break Switches (LBS) were installed in 1986 and are suspected to have formerly contained dielectric fluid that contained polychlorinated biphenyls (PCBs). The LBS were replaced in 1993 with new LBSs that do not contain PCBs. The LBS are located on a concrete pad surrounded by grass that is mowed and maintained. A total of 330 soil samples were collected between June 2020 and December 2022 from 88 locations at depths ranging from 0-0.5 to 19-20 ft bls. In general, soil samples collected from depths less than 5 ft were collected via hand auger and samples collected beyond 5 ft bls were collected using a direct-push technology drill rig. Soil samples collected from greater than 5 ft bls to 20 ft bls were collected to confirm PCBs were not present at depth in the aquifer matrix. Delineation samples were collected using an approximately 20 ft horizontal spacing. PCB impacted soil has been completely delineated to the State of Florida residential soil cleanup target level (SCTL) at PRL 227a horizontally and vertically. PCB concentrations have been identified above the residential and industrial SCTL as well as concentrations greater than or equal to 50 ppm requiring coordination with EPA and disposal at a facility authorized under TSCA. Based upon the CSRA sampling, an interim measure is recommended to remove PCB impacted soil above the residential SCTL. The total volume of PCB impacted soil to be removed is 591.6 cubic yards. This includes approximately 9.3 cubic yards of soil with PCB concentrations greater than or equal to 50 ppm. An interim measure work plan is included as an attachment to this report.

electrical equipment↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Per- and Polyfluoroalkyl Substances Confirmatory Sampling Report, South Repeater Building (SWMU 121), Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Confirmatory Sampling (CS) Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document CS activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121, formerly known as the Area 3 Repeater Building (A3RB). A Phase I SWMU Assessment and Confirmatory Sampling Report (NASA 2019) and a Phase II and III SWMU Assessment and Confirmatory Sampling Report (NASA 2022b) were previously submitted detailing Center-Wide assessment activities performed at the John F. Kennedy Space Center (KSC) in Florida that identified 33 locations of concern and 19 areas of potential concern at KSC associated with the storage, use, or release of materials containing PFAS. A review of the analytical results from investigation derived waste samples collected in 2020 from the South Repeater Building area indicated concentrations of perfluorooctanesulfonic acid (PFOS) were above Florida Department of Environmental Protection (FDEP) provisional Groundwater Cleanup Target Levels of 70 nanograms per liter (ng/L) at a concentration of 1,750 ng/L. Following this review, the KSC Fire Chief was contacted; the Chief recalled fighting a brush fire in 1998 in the area, during which an unknown volume of aqueous film-forming foam was used to extinguish the fire. The Phase II and Phase III SWMU Assessment Report recommended this area proceed to CS. Historical results in this area are provided in Appendix A . PFAS CS activities were contracted at the South Repeater Building. Initial CS activities were conducted in accordance with the PFAS Assessment and Mitigation Work Plan (AECOM 2022), which was submitted to the NASA Remediation Project Management team and accepted by the team on November 1 and 8, 2021. The objectives of the PFAS CS were to: - - Confirm and begin to assess the extent of PFAS affected media in the South Repeater Building area. - - Identify locations for groundwater, soil, surface water, and soil core sampling. - - Qualitatively characterize the migration potential of released PFAS to environmental media (soil, groundwater, and surface water). The following activities were completed to meet the PFAS CS objectives: - - Installation of monitoring wells via direct push technology (DPT) and rotosonic techniques - - Groundwater, soil, and surface water sampling - - Collection of soil cores to evaluate site lithology - - Development of initial PFAS plume characterization

PFAS↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

Improving Cyber Situational Understanding

Effective cybersecurity operations require the ability to analyze large amounts of information to assess security risks and formulate defensive strategies against adversaries. This has become more complex in recent years as the sprawl and interconnectivity of devices grows through implementation of virtualization, cloud computing, and Internet of Things (IoT). The amount of data and analysis required for effective cybersecurity command and control decisions far exceeds humans’ capacity to perform manually. We characterize the analysis problem as cyber situational understanding. The research presented to improve cyber situational understanding focuses on vulnerability analysis and threat intelligence. Regarding vulnerabilities, entities must analyze and plan work for between thousands and tens of thousands of software vulnerabilities annually. Entities heavily use network firewalls to limit vulnerability exposure. As a result, some of these vulnerabilities permit exposure to adversarial exploitation, whereas others are inaccessible and therefore present negligible risk of exploitation. Distinguishing between high and low risk software vulnerabilities requires a deep understanding of the vulnerability, network firewall protection, and characteristics of the targeted device. This problem is solved by extracting network service features from vulnerability data features using both machine-learning and natural language processing. Then, the network firewall topology is parsed to determine which vulnerabilities are reachable by adversaries. Ultimately, a state-based safety analysis ascertains which vulnerabilities are unsafe. A related vulnerability analysis problem occurs in cybersecurity operations when associating an entity’s hardware and software assets to public vulnerability databases. Assets often reveal hardware and software through installation artifacts and network service identification, and entities store these artifacts in inventory databases. However, software and hardware vendors apply a standard Common Platform Enumeration (CPE) naming convention when publicly reporting vulnerabilities. Associating these two datasets often requires many hours to days of manual inspection. The proposed solution automates the mapping approach of human analysts using fuzzy matching techniques, natural language processing, and, ultimately, machine learning to present a small set of recommendations for mapping the two datasets. The result significantly reduces human analysis time and reduces the occurrence of false positives in vulnerability notifications. Finally, cyber threat intelligence (CTI) requires associating cyber observable artifacts, such as IP addresses, URIs, and file hashes, with cyber threat tactics, techniques, and procedures. Unfortunately, most CTI data is compartmentalized across multiple organizations and cannot be shared due to the legal and reputational risk with cyber threat being associated with the entity. The approach to solving this problem inovlves using a distributed ledger with anonymous token spending and authentication. This allows a consortium of semi-trusted entities to share the workload of curating CTI for a threat sharing community’s cooperative benefit.

Huff, Philip↗

Repository-Based Software Engineering Program: Working Program Management Plan

Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

Source record↗

Human-Automation Integration: Principle and Method for Design and Evaluation

Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.

human-automation integration↗

Active microwave users working group program planning

A detailed programmatic and technical development plan for active microwave technology was examined in each of four user activities: (1) vegetation; (2) water resources and geologic applications, and (4) oceanographic applications. Major application areas were identified, and the impact of each application area in terms of social and economic gains were evaluated. The present state of knowledge of the applicability of active microwave remote sensing to each application area was summarized and its role relative to other remote sensing devices was examined. The analysis and data acquisition techniques needed to resolve the effects of interference factors were reviewed to establish an operational capability in each application area. Flow charts of accomplished and required activities in each application area that lead to operational capability were structured.

Ulaby, F. T.↗

Solar High-energy Astrophysical Plasmas Explorer (SHAPE). Volume 1: Proposed concept, statement of work and cost plan

The concept of the Solar High-Energy Astrophysical Plasmas Explorer (SHAPE) is studied. The primary goal is to understand the impulsive release of energy, efficient acceleration of particles to high energies, and rapid transport of energy. Solar flare studies are the centerpieces of the investigation because in flares these high energy processes can be studied in unmatched detail at most wavelenth regions of the electromagnetic spectrum as well as in energetic charged particles and neutrons.

Dennis, Brian R.↗

Planned Investigations to Address Acute Central Nervous System Effects of Space Radiation Exposure with Human Performance Data

This work intends to generate evidence of acute, incremental human performance decrement similar to that due to space radiation andits impacts on the brain, to accompany ongoing human performance modeling work. The planned work will explore the boundaries of human behavioral and performance decrement after exposure to stress, which may be expected based in part on rodent responses found afterexposure to ionizing radiation. The collection of evidence via simulation studies can characterize real human errors toward determining what stress levels lead to significantly-low levels of performance (below permissible outcome limits) which would imperilmission accomplishment. If mission-relevant animal-study-linked tasks are used, human and animal performance levels may be aligned to enable quantitative assignment of permissible exposure limits based on animal exposure studies. Ultimately, a transfer function between the performances of exposed rodents and humans under stress can be developed using shared impairment mechanisms.

human performance↗

Planned Investigations to Address Acute Central Nervous System Effects of Space Radiation Exposure with Human Performance Data

This work intends to generate evidence of acute, incremental human performance decrement similar to that due to space radiation and its impacts on the brain, to accompany ongoing human performance modeling work. The planned work will explore the boundaries of human behavioral and performance decrement after expo-sure to stress, which may be expected based in part on rodent responses found after exposure to ionizing radiation. The collection of evidence via simulation studies can characterize real human errors toward determining what stress levels lead to significantly-low levels of performance (below permissible outcome limits) which would imperil mission accomplishment. If mission-relevant yet animal-study-linked tasks are used, human and animal performance levels may be aligned to enable quantitative assignment of permissible exposure limits based on animal exposure studies. Ultimately, a transfer function between the performances of exposed rodents and humans under stress can be developed using shared impairment mechanisms.

human performance↗

Urban Air Mobility Electric Motor Winding Insulation Reliability: Challenges in the Design and Qualification of High Reliability Electric Motors and NASA’s Research Plan

This work was motivated by the needs of the emerging Urban Air Mobility (UAM) concept. Guided by analyses of concept vehicles, electric motor winding insulation reliability was identified as a subsystem limiting the vehicle reliability. This paper covers NASA’s understanding of the current state-of-the-art for electric motor winding insulation reliability, life modeling and qualification testing in the context of UAM. The needed improvements to the accepted practice for qualification of high reliability UAM motors are highlighted. NASA’s Revolutionary Vertical Lift Technologies Project strives to develop new testing methods to support the rating and qualification of UAM motor winding insulation. We describe assumptions used to frame a research approach, and we outline a NASA RVLT research plan for motor winding insulation.

Thomas Tallerico↗

Explanation-based generalization of partially ordered plans

Most previous work in analytic generalization of plans dealt with totally ordered plans. These methods cannot be directly applied to generalizing partially ordered plans, since they do not capture all interactions among plan operators for all total orders of such plans. We introduce a new method for generalizing partially ordered plans. This method is based on providing explanation-based generalization (EBG) with explanations which systematically capture the interactions among plan operators for all the total orders of a partially-ordered plan. The explanations are based on the Modal Truth Criterion which states the necessary and sufficient conditions for ensuring the truth of a proposition at any point in a plan, for a class of partially ordered plans. The generalizations obtained by this method guarantee successful and interaction-free execution of any total order of the generalized plan. In addition, the systematic derivation of the generalization algorithms from the Modal Truth Criterion obviates the need for carrying out a separate formal proof of correctness of the EBG algorithms.

Kambhampati, Subbarao↗

Simulation of Tropical Biomass Burning

The work proposed was carried out as planned. The work described in this final report formed the basis for a follow-on research grant research grant from NASA Ames Research Center. The research objectives that were achieved during the course of our studies include the following: (1) the evaluation of several components of MM5 (Meteorological Model 5 version 2) and the Global/Regional Atmospheric Chemistry Event Simulator (GRACES) combined modeling system; (2) improved calculations of the transport of tracers for both NASA airborne missions, Study of Ozone and Nitrogen oxides experiment (SONEX) and Pacific Exploratory MIssion in the Tropics (PEM-Tropics); (3) improved source strength estimates for isoprene, dust and similar emissions from the Earth's surface. This required the use of newly available databases on the Earth's surface and vegetation; (4) completed atmospheric chemistry simulations of radicals and nitrogen oxide species; (5)improved the handling of cumulonimbus convection by modifying the existing scheme; (6) identified the role of the African Intertropical Front, using MM5's nesting capability to refine model resolution in crucial areas; modified the MM5 trajectory program to allow it to work much better for a parcel crossing the west/east boundaries.

Hamill, Patrick↗

Working Group 1: Current plans of various organisations for lunar activities

Summaries of presentations by representatives of several space agencies and the International Academy of Astronautics concerning lunar activities are presented. Participating space agencies reported two different types of lunar planning, long term planning and scenarios and lunar missions competing within regular programs. The long term plans of the various agencies look remarkably similar. They all involve a phased approach (coincidentally all incorporating four phases) and all address three prime scientific elements: science of, on, and from the Moon. The missions under consideration by the second group of agencies could readily fit as elements in the longer term program. There is great interest in lunar astronomy. There is a great deal of potential infrastructure and lunar transport capability already available. There is also a wide range of interesting technological developments that could form part of a lunar program. A well concerted and coordinated international effort could lead to an affordable program. Recommendations are: an international conference on lunar exploration should be held every other year; an electronic network should be established for the daily exchange of information; and a mechanism should be established for regular working level coordination of activities.

Balsiger, H.↗

Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

maneuver↗