Search NASA⌕ Search

SEARCH · Search NASA

Results for “CARGO SPACECRAFT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Orbital Fluid Resupply Assessment

Orbital fluid resupply can significantly increase the cost-effectiveness and operational flexibility of spacecraft, satellites, and orbiting platforms and observatories. Reusable tankers are currently being designed for transporting fluids to space. A number of options exist for transporting the fluids and propellant to the space-based user systems. The fluids can be transported to space either in the Shuttle cargo bay or using expendable launch vehicles (ELVs). Resupply can thus be accomplished either from the Shuttle bay, or the tanker can be removed from the Shuttle bay or launched on an ELV and attached to a carrier such as the Orbital Maneuvering Vehicle (OMV) or Orbital Transfer Vehicle (OTV) for transport to the user to be serviced. A third option involves locating the tanker at the space station or an unmanned platform as a quasi-permanent servicing facility or depot which returns to the ground for recycling once its tanks are depleted. Current modular tanker designs for monopropellants, bipropellants, and water for space station propulsion are discussed. Superfluid helium tankers are addressed, including trade-offs in tanker sizes, shapes to fit the range of ELVs currently available, and boil-off losses associated with longer-term (greater than 6-month) space-basing. It is concluded that the mixed fleet approach to on-orbit consumables resupply offers significant advantages to the overall logistics requirements.

Eberhardt, Ralph N.↗

Lunar transportation system

The University Space Research Association (USRA) requested the University of Minnesota Spacecraft Design Team to design a lunar transportation infrastructure. This task was a year long design effort culminating in a complete conceptual design and presentation at Johnson Space Center. The mission objective of the design group was to design a system of vehicles to bring a habitation module, cargo, and crew to the lunar surface from LEO and return either or both crew and cargo safely to LEO while emphasizing component commonality, reusability, and cost effectiveness. During the course of the design, the lunar transportation system (LTS) has taken on many forms. The final design of the system is composed of two vehicles, a lunar transfer vehicle (LTV) and a lunar excursion vehicle (LEV). The LTV serves as an efficient orbital transfer vehicle between the earth and the moon while the LEV carries crew and cargo to the lunar surface. Presented in the report are the mission analysis, systems layout, orbital mechanics, propulsion systems, structural and thermal analysis, and crew systems, avionics, and power systems for this lunar transportation concept.

Source record↗

Comparison of Solar Electric and Chemical Propulsion Missions

Solar Electric Propulsion (SEP) offers fuel efficiency and mission robustness for spacecraft. The combination of solar power and electric propulsion engines is currently used for missions ranging from geostationary stationkeeping to deep space science because of these benefits. Both solar power and electric propulsion technologies have progressed to the point where higher electric power systems can be considered, making substantial cargo missions and potentially human missions viable. This paper evaluates and compares representative lunar, Mars, and Sun-Earth Langrangian point missions using SEP and chemical propulsion subsystems. The potential benefits and limitations are discussed along with technology gaps that need to be resolved for such missions to become possible. The connection to NASA's human architecture and technology development efforts will be discussed.

solar electric propulsion↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Payload Utilization in NASA's Space Launch System

A revitalized National Space Council has directed NASA to return to the moon, with a series of preparatory missions paving the way for eventual human exploration. NASA's new deep space exploration system -- the heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revitalized launch facilities at Kennedy Space Center -- will enable NASA and its commercial and international partners to meet these goals for human deep space exploration. SLS will be the most capable launch vehicle for these efforts, with an initial Block 1 capability of at least 26 metric tons (t) to trans-lunar injection (TLI). A more powerful Block 1B, available in crew and cargo configurations, with have the power to loft more than 37 t to TLI; the ultimate Block 2 variant will lift more than 45 t to TLI. For payload utilization, the Block 1 vehicle will carry 13 6U CubeSats as secondary payloads while the Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA). Block 1B cargo vehicles will offer 8.4 m fairings in 19.1 m and 27.4 m lengths, with enough volume to accommodate habitat modules and landers. For missions beyond the Earth-moon system, SLS offers greater characteristic energy (C3), enabling faster transit or heavier payloads to the outer planets. The first mission of SLS and Orion, launching no earlier than December 2019, will send Orion into lunar distant retrograde orbit (DRO) on an approximately 25-day shakedown cruise known as Exploration Mission-1 (EM-1), enabling NASA to verify and validate new systems before sending astronauts to deep space on the next exploration mission. The SLS program and its prime contractors have made significant progress toward first launch, with several major components of the vehicle completed and delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center. Major forward work includes integrating tanks, engines and other major sections into the EM-1 core stage at Michoud Assembly Facility and then shipping the entire core stage assembly to Stennis Space Center. There, it will be installed in the refurbished B-2 test stand for a series of integrated stage tests culminating in a green run hotfire test. The Program's Spacecraft Payload Integration and Evolution (SPIE) Office, responsible for the in-space stage, adapters and payload interfaces, has largely completed its effort on the Block 1 vehicle and is supporting manufacture of the first Block 1B vehicle. This paper will provide an overview of the Block 1 vehicle, its expected capabilities, secondary payload accommodations and manufacturing status, including structural testing and the challenges of developing a new launch vehicle. A lookahead to the Block 1B vehicle and the payload utilization opportunities it will provide in the 2020s will also be discussed, including the unique capabilities of the vehicle.

Creech, Stephen D.↗

STS-96 Crew Interview: Rick Husband

Live footage of a preflight interview with Pilot Rick D. Husband is seen. The interview addresses many different questions including why Husband became an astronaut, the events that led to his interest, and his career path as a pilot. Other interesting information that this one-on-one interview discusses is this logistics and outfitting mission, why it is important to send equipment to the International Space Station (ISS) before the astronauts, and the Integrated Cargo Carrier. Husband mentions Discovery's anticipated docking with the ISS, the space walk with Mission Specialists Tamara E. Jernigan, and Daniel T. Barry, plans for the supply and equipment transfers, and an experiment designed to evaluate the system that will transfer oxygen, nitrogen and water between the ISS and the spacecraft. A fly-around mission, and the deployment of the Student Tracked Atmospheric Research Satellite for Heuristic International Networking Equipment (STARSHINE) are also discussed.

Source record↗

Estimating the Reliability of a Soyuz Spacecraft Mission

Once the US Space Shuttle retires in 2010, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? Is it safer to continue to fly the 30 year old Shuttle fleet for crew transportation and cargo resupply than the Soyuz? Should we extend the life of the Shuttle Program? How does the development of the Orion/Ares crew transportation system affect these decisions? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project is currently underway. Though the projects ultimate goal is to return to the Moon and then to Mars, the launch vehicle and spacecraft s first mission will be for crew transportation to and from the ISS. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques

Lutomski, Michael G.↗

Potential teleoperator applications in manned aerospace systems

The trend of teleoperator development is toward digital computer controlled systems which utilize local sensor-computer-actuator loops to avoid obstacles and to sense manipulator grip-and-slip. The potential applications of advanced teleoperator technology to manned aerospace systems include long manipulator booms to be mounted on the shuttle. These can transfer cargo from the space shuttle and can acquire and retrieve objects in space. Free-flying teleoperators capable of acquiring, inspecting, repairing or refurbishing satellites in orbit are another space application. Another potential application of teleoperator technology is the concept of using an anthropomorphous teleoperator in lieu of man to control aircraft or spacecraft normally controlled by a human pilot.

Johnsen, E. G.↗

Spacecraft for flight in the atmosphere of Venus

Possible configurations of space vehicles which would be delivered to Venus by rocket system in order to autonomously carry out flights in an automatic (and possibly piloted) mode are considered with respect to mission and flight altitude. Base (high altitude) vehicles, operating at pressure, sendity, and temperature corresponding to those on Earth at sea level, will have little maneuverability, will serve as carriers for equipment, scientific devices, and other cargo, and will study the gas composition of the Venus atmosphere from above. Low altitude vehicles will explore the planet from flight altitude in the vicinity of the planet's surface, as well as land on it. Analogous to deep submergence vehicles such as the bathyscaphe and the bathyplane, they will have a certain amount of maneuverability and will study the atmospheric boundary layer from below. The advantages of aerostats in this environment are discussed. Drawings of the aerostatic base station, the variable-length aerostatic sing vehicle, and the hybrid aerostatic vehicle with attached wings are included.

Moskalenko, G. M.↗

MW-Class Electric Propulsion System Designs

Electric propulsion systems are well developed and have been in commercial use for several years. Ion and Hall thrusters have propelled robotic spacecraft to encounters with asteroids, the Moon, and minor planetary bodies within the solar system, while higher power systems are being considered to support even more demanding future space science and exploration missions. Such missions may include orbit raising and station-keeping for large platforms, robotic and human missions to near earth asteroids, cargo transport for sustained lunar or Mars exploration, and at very high-power, fast piloted missions to Mars and the outer planets. The Advanced In-Space Propulsion Project, High Efficiency Space Power Systems Project, and High Power Electric Propulsion Demonstration Project were established within the NASA Exploration Technology Development and Demonstration Program to develop and advance the fundamental technologies required for these long-range, future exploration missions. Under the auspices of the High Efficiency Space Power Systems Project, and supported by the Advanced In-Space Propulsion and High Power Electric Propulsion Projects, the COMPASS design team at the NASA Glenn Research Center performed multiple parametric design analyses to determine solar and nuclear electric power technology requirements for representative 300-kW class and pulsed and steady-state MW-class electric propulsion systems. This paper describes the results of the MW-class electric power and propulsion design analysis. Starting with the representative MW-class vehicle configurations, and using design reference missions bounded by launch dates, several power system technology improvements were introduced into the parametric COMPASS simulations to determine the potential system level benefits such technologies might provide. Those technologies providing quantitative system level benefits were then assessed for technical feasibility, cost, and time to develop. Key assumptions and primary results of the COMPASS MW-class electric propulsion power system study are reported, and discussion is provided on how the analysis might be used to guide future technology investments as NASA moves to more capable high power in-space propulsion systems.

LaPointe, Michael R.↗

Second Shuttle Join NASA's STS Fleet: Challenger Launches First New Tracking Satellite

NASA made a major stride in readying a second delivery vehicle for its Space Transportation System (STS) fleet with the perfect landing of Shuttle Orbiter Challenger at Edwards Air Force Base, California, April 9, 1983. Besides being the first flight test of Challenger's performance, the mission marked the orbiting of the first spacecraft in NASA's new Tracking and Data Relay Satellite System (TDRSS). The new family of orbiting space communications platforms is essential to serve future Shuttle missions. Although the Inertial Upper Stage (IUS) second stage engine firing failed to place TDRS in its final 35,888 kilometer (22,300 mile) geosynchronous orbit, its release from the orbiter cargo bay went as planned. Launch officials were confident they can achieve its planned orbit in a matter of weeks.

Source record↗

STS-96 Crew Interview: Ellen Ochoa

Live footage of a preflight interview with Mission Specialist Ellen Ochoa is seen. The interview addresses many different questions including why Ochoa became an astronaut, the events that led to her interest, and her career path through research and engineering. Other interesting information that this one-on-one interview discusses is the logistics and supply mission, why it is important to send equipment to the International Space Station (ISS), and the Integrated Cargo Carrier (ICC). Ochoa mentions Discovery's anticipated docking with the ISS, her role during the scheduled space walk with Tamara E. Jernigan and Daniel T. Barry, and plans for the supply and equipment transfers. Ochoa also discusses her involvement in a Volatile Removal Assembly (VRA) experiment to remove contaminants from the water, the undocking of the spacecraft from the ISS, and a fly-around maneuver to take pictures of the ISS.

Source record↗

Analysis of Historical International Space Station Logistical Mass Delivery

Crewed space exploration missions are extremely logistics dependent, as cargo requirements shape numerous program elements such as vehicle and habitat size. Logistics mass is the mass of items like food and clothing that are not a part of the vehicle or habitat, yet are required by the crew to complete the mission. Numerous studies, such as the Human Exploration Research Analog (HERA) and the Human Exploration Spacecraft Testbed for Integration and Advancement (HESTIA) 20-foot chamber analog, have been conceived to research the rates at which crews consume logistics mass. These analogs can simulate many aspects of life in space, including confinement, isolation, limited supplies, and, in certain experiments, the habitat pressure. However, some aspects of space exploration, such as the effects of low gravity and the use of space-based amenities, cannot currently be tested on the ground. In this paper, International Space Station (ISS) manifest data obtained through the National Aeronautics and Space Administration’s (NASA’s) Mission Integration Database Application System (MIDAS) portal is used as a precursor to space-based analogs. The objective of the analysis is determining the breakdown of logistics mass used in space exploration. This identifies potential areas of improvement and highlights the rates at which significant items are supplied, aiding in the weighing of alternative options such as utilizing in space manufacturing for supplies vs. manifesting spares, or cleaning clothing in flight vs. discarding it. Official flight manifests ranging a span of 878 days, just short of the three-year length of a potential human mission to Mars, were analyzed to find the rates at which astronauts consumed various logistics supplies. From this analysis we have found that contrary to our own hypothesis, ‘food’ was not the largest portion of the supplied mass. Instead, ‘Environmental Control and Life Support Systems’ (ECLSS) contributed 34% of the overall supplied mass, followed by ‘Science and Outfitting,’ which contributed 29%. Food totaled less than a quarter (21% of the resupplied mass, while other items of focus in mass reduction efforts such as ‘Hygiene’ (6%), ‘Clothing’ (3%), and ‘Operational Supplies’ (4%) each contributed less than a tenth of the supplied mass. This data suggests that by categorizing and analyzing the data based on an alternative taxonomy and analyzing the full supply manifests rather than handpicked items, we have revealed unexpectedly significant items which had not been previously tracked by exploration logistics efforts. For example, toilet hardware made up 4% of ECLSS mass, and laptop hardware and multi-tools each made up 10% of operational supplies mass. Additionally, the ‘Specialized Clothing’ subcategory containing fire protective equipment, coveralls, and penguin suits made up 15% of the overall clothing mass. By identifying these newly found significant items, we can create more realistic mass estimates for exploration missions and direct mass reduction efforts to new areas, potentially leading to lower future mission masses.

Logistics↗

Recommended Crew Systems Capabilities for a 30 to 90 Day Four-Crew Lunar Surface Mission

For any given surface mission duration, there exists a set of surface capabilities necessary to sustain a four-person crew for the length of time the crew is on the surface. Identifying these capabilities is important to mission planners and spacecraft design engineers responsible for lunar surface habitation elements, who need to know which systems and capabilities must be prioritized for the vehicles they are designing. However, simply identifying the surface capabilities does not necessarily equal a viable surface configuration. These capabilities may or may not satisfy stakeholder expectations or even permit completion of mission objectives. Lunar lander cargo mass constraints are a powerful forcing function that requires significant efforts to reduce the mass of all surface elements, including those supporting crew habitation. The required capabilities do increase as a function of mission duration, but it is a nonlinear growth. There are key points in mission duration, beyond which certain additional capabilities are needed. This forms bands of capability between each point. Within a given band, the same functional capabilities are needed, and the only scaling is that associated with daily consumables. The next higher band requires additional capabilities. This paper will focus on those capabilities needed for missions of 30-90 days. It should be noted that there are some uncertainties interpreting NASA requirements that require capabilities after a certain number of days, as typically this refers to number of days in space, not number of days on the lunar surface. Depending on transportation architecture, the number of days between Earth launch and lunar surface landing may vary, therefore impacting when certain required capabilities are implemented. However, activities to prepare humans for missions to Mars and commercial interest in lunar development may drive progressive increases in surface duration. Missions up to 30 days are expected to follow the initial 6.5-day surface missions and there may be commercial interest in extending to even greater durations. This paper will examine the potential case of a 30-90-day surface mission duration with respect to the systems necessary to support crew living and working on the lunar surface.

Habitat↗

Challenges of Designing a Passive Thermal Control System for the Astrobotic Peregrine Lunar Lander

The Astrobotic Peregrine is a lunar lander currently undergoing design by Astrobotic Technology with help from NASA through the Lunar Cargo Transportation and Landing by Soft Touchdown (Lunar CATALYST) program. This paper will discuss the challenges of designing a passive thermal control system for the lander, and how the design has evolved from the initial passive concept. These challenges include drastically varying worst hot and worst cold case thermal environments, narrow temperature limits of critical components, limited available locations for spacecraft component mounting, and unexpected changes causing significant thermal impacts. The initial thermal control strategy was to cold bias the spacecraft by thermally coupling all spacecraft components to one mounting deck, which also doubled as a radiator, and using heaters to maintain each component’s temperature above its lower temperature limit when in the cold environments. As the design evolved, this strategy alone became inadequate. As heat dissipations increased and became more varying with the addition of components, the thermal design was changed and additional thermal control technologies added. Thermal control strategies incorporated into the design include dictating the lander orientation in demanding environments, defining locations for critical spacecraft components, limiting component operation when possible, and using technology to create variable thermal contacts. Additional design changes will occur as the design continues to evolve to optimize the most effective thermal control system. The thermal design of Peregrine is still in progress, with Critical Design Review (CDR) scheduled for December 2019.

Mauro, Stephanie↗

Space telescope, a long-life free flyer

The paper describes NASA's Space Telescope (ST) adapted to Shuttle capabilities for launch and retrieval which utilizes the full Shuttle cargo bay space available for payloads and can be returned to the ground for refurbishment. Its objective is to maximize ST's productive lifetime, to probe the universe, and to analyze light from energy sources which cannot be studied by ground-based telescopes. The Shuttle orbiting lifetime will be extended to at least five years, and scientific instruments or failed spacecraft components will be replaced on-orbit. The ST will be returned to earth for major overhauls, refurbished, and relaunched. In summary, the Shuttle will allow space astronomy to be accomplished in the usual manner - by observing, adjusting, changing detectors, and reobserving. The support systems module, the optical telescope assembly, scientific instruments, including the wide field/planetary camera, the faint object spectrograph and the high speed photometer are described.

Field, E. L.↗

Orbital atomic oxygen effects on materials: An overview of MSFC experiments on the STS-46 EOIM-3

The third Evaluation of Oxygen Interaction with Materials experiment was flown on Space Shuttle Mission STS-46 (July 31 - August 8, 1992), representing a joint effort of several NASA centers, universities, and contractors. This array of active instrumentation and material exposure sub-assemblies was integrated as a Shuttle cargo bay pallet experiment for investigating the effects of orbital atomic oxygen on candidate space materials. Marshall Space Flight Center contributed several passive exposure trays of material specimens, uniform stress and static stress material exposure fixtures, the Atomic Oxygen Resistance Monitor (AORM), and specimens of thermal coatings for the EOIM-3 variable exposure mechanisms. As a result of 42 hours of spacecraft velocity vector-oriented exposure during the later phases of the STS-46 mission in LEO, EOIM-3 materials were exposed to an atomic oxygen fluence of 2.2 x 10(exp 20) atoms/sq cm. In this paper, an overview is presented of the technical approaches and results from analyses of the MSFC flight specimens, fixtures, and the AORM. More detailed results from earlier EOIM missions, the LDEF, and from laboratory testing are included in associated papers of this conference session.

Linton, Roger C.↗

Dust Storm Impacts on Human Mars Mission Equipment and Operations

Although it is tempting to use dust impacts on Apollo lunar exploration mission equipment and operations as an analog for human Mars exploration, there are a number of important differences to consider. Apollo missions were about a week long; a human Mars mission will start at least two years before crew depart from Earth, when cargo is pre-deployed, and crewed mission duration may be over 800 days. Each Apollo mission landed at a different site; although no decisions have been made, NASA is investigating multiple human missions to a single Mars landing site, building up capability over time and lowering costs by re-using surface infrastructure. Apollo missions used two, single-use spacecraft; a human Mars mission may require as many as six craft for different phases of the mission, most of which would be re-used by subsequent crews. Apollo crews never ventured more than a few kilometers from their lander; Mars crews may take "camping trips" a hundred kilo-meters or more from their landing site, utilizing pressurized rovers to explore far from their base. Apollo mission designers weren't constrained by human for-ward contamination of the Moon; if we plan to search for evidence of life on Mars we'll have to be more careful. These differences all impact how we will mitigate and manage dust on our human Mars mission equipment and operations.

Rucker, M. A.↗