Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

CEBAF Accelerator Tunnel Robot Project

Advancements in the field of robotics allow for the use of remotely controlled robots to perform tasks that have typically required human intervention. Jefferson Lab has explored the possibilities of robots placed in the accelerator tunnel to perform remote inspections that would otherwise require powering down equipment and completing lengthy radiological surveys that impact beam operations. A robotic solution ? driven by a human operator ? could not only reduce accelerator down time but also support the Lab's radiation exposure policy (known as "ALARA" - As Low As Reasonably Acceptable) by handling routine tunnel and beamline investigations in place of a human being. However, operating a remote device in a radioactive, high electronic-noise area is not a trivial task and drop-in solutions are rarely as simple as they seem. We will present the past prototypes that were tested as well follow-on technology developed from the project. We will also briefly survey current applications of robots at accelerator facilities with an eye toward future applications.

McGuckin, Theodore↗

Mechanical Design of a New Injector Cryomodule 2-Cell Cavity at CEBAF

As a part of Jefferson Lab’s 12 GeV upgrade, a new injector superconducting RF cryomodule is required. This unit consists of a 2-cell and 7-cell cavity, with the latter being refurbished from an existing cavity. The new 2-cell cavity requires electromagnetic design and optimization followed by mechanical design analyses. The electromagnetic design is reported elsewhere. This paper aims to present the procedures and conclusions of the analyses on cavity tuning sensitivity, pressure sensitivity, upset condition pressure induced stresses, and structural vibration frequencies. The purposes of such analyses include: 1) provide reference data for cavity tuner design; 2) examine the structural integrity of the cavity; and 3) evaluate the 2-cell cavity’s resistance to microphonics. Design issues such as the location of stiffening rings, effect of tuner stiffness on cavity stress, choice of cavity wall thickness, etc. are investigated by conducting extensive finite element analyses. Progress in fabrication of the 2-cell cavity is also reported.

43 PARTICLE ACCELERATORS↗