Audit Report on "Protection of the Department of Energy's Unclassified Sensitive Electronic Information"

The Department of Energy and its contractors store and process massive quantities of sensitive information to accomplish national security, energy, science, and environmental missions. Sensitive unclassified data, such as personally identifiable information (PII), official use only, and unclassified controlled nuclear information require special handling and protection to prevent misuse of the information for inappropriate purposes. Industry experts have reported that more than 203 million personal privacy records have been lost or stolen over the past three years, including information maintained by corporations, educational institutions, and Federal agencies. The loss of personal and other sensitive information can result in substantial financial harm, embarrassment, and inconvenience to individuals and organizations. Therefore, strong protective measures, including data encryption, help protect against the unauthorized disclosure of sensitive information. Prior reports involving the loss of sensitive information have highlighted weaknesses in the Department's ability to protect sensitive data. Our report on Security Over Personally Identifiable Information (DOE/IG-0771, July 2007) disclosed that the Department had not fully implemented all measures recommended by the Office of Management and Budget (OMB) and required by the National Institute of Standards and Technology (NIST) to protect PII, including failures to identify and encrypt PII maintained on information systems. Similarly, the Government Accountability Office recently reported that the Department had not yet installed encryption technology to protect sensitive data on the vast majority of laptop computers and handheld devices. Because of the potential for harm, we initiated this audit to determine whether the Department and its contractors adequately safeguarded sensitive electronic information. The Department had taken a number of steps to improve protection of PII. Our review, however, identified opportunities to strengthen the protection of all types of sensitive unclassified electronic information and reduce the risk that such data could fall into the hands of individuals with malicious intent. In particular, for the seven sites we reviewed: (1) Four sites had either not ensured that sensitive information maintained on mobile devices was encrypted. Or, they had improperly permitted sensitive unclassified information to be transmitted unencrypted through email or to offsite backup storage facilities; (2) One site had not ensured that laptops taken on foreign travel, including travel to sensitive countries, were protected against security threats; and, (3) Although required by the OMB since 2003, we learned that programs and sites were still working to complete Privacy Impact Assessments - analyses designed to examine the risks and ramifications of using information systems to collect, maintain, and disseminate personal information. Our testing revealed that the weaknesses identified were attributable, at least in part, to Headquarters programs and field sites that had not implemented existing policies and procedures requiring protection of sensitive electronic information. In addition, a lack of performance monitoring contributed to the inability of the Department and the National Nuclear Security Administration (NNSA) to ensure that measures were in place to fully protect sensitive information. As demonstrated by previous computer intrusion-related data losses throughout the Department, without improvements, the risk or vulnerability for future losses remains unacceptably high. In conducting this audit, we recognized that data encryption and related techniques do not provide absolute assurance that sensitive data is fully protected. For example, encryption will not necessarily protect data in circumstances where organizational access controls are weak or are circumvented through phishing or other malicious techniques. However, as noted by NIST, when used appropriately, encryption is an effective tool that can, as part of an overall risk-management strategy, enhance security over critical personal and other sensitive information. The audit disclosed that Sandia National Laboratories had instituted a comprehensive program to protect laptops taken on foreign travel. In addition, the Department issued policy after our field work was completed that should standardize the Privacy Impact Assessment process, and, in so doing, provide increased accountability. While these actions are positive steps, additional effort is needed to help ensure that the privacy of individuals is adequately protected and that sensitive operational data is not compromised. To that end, our report contains several recommendations to implement a risk-based protection scheme for the protection of sensitive electronic information.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

U.S. Department of Energy, Office of Legacy Management Program Update, April-June 2009

Welcome to the April-June 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. The Legacy Management goals are: (1) Protect human health and the environment through effective and efficient long-term surveillance and maintenance - This goal highlights DOE's responsibility to ensure long-term protection of people, the environment, and the integrity of engineered remedies and monitoring systems. (2) Preserve, protect, and make accessible legacy records and information - This goal recognizes LM's commitment to successfully manage records, information, and archives of legacy sites under its authority. (3) Support an effective and efficient work force structured to accomplish Departmental missions and assure continuity of contractor worker pension and medical benefits - This goal recognizes DOE's commitment to its contracted work force and the consistent management of pension and health benefits. As sites continue to close, DOE faces the challenges of managing pension plan and health benefits liability. (4) Manage legacy land and assets, emphasizing protective real and personal property reuse and disposition - This goal recognizes a DOE need for local collaborative management of legacy assets, including coordinating land use planning, personal property disposition to community reuse organizations, and protecting heritage resources (natural, cultural, and historical). (5) Improve program effectiveness through sound management - This goal recognizes that LM's goals cannot be attained efficiently unless the federal and contractor work force is motivated to meet requirements and work toward continuous performance improvement.

54 ENVIRONMENTAL SCIENCES↗

WILD PIGS: BIOLOGY, DAMAGE, CONTROL TECHINQUES AND MANAGEMENT

The existence of problems with wild pigs (Sus scrofa) is nothing new to the Western Hemisphere. Damage by these introduced animals was reported as far back as 1505 by the early Spanish colonies in the Caribbean, where wild pigs were killing the colonists cattle. Droves of these animals also ravaged cultivated crops of maize and sugarcane on islands in the West Indies during this same time period. These wild pigs reportedly were very aggressive and often attacked Spanish soldiers hunting rebellious Indians or escaped slaves on these islands, especially when these animals were cornered. The documentation of such impacts by introduced populations of this species in the United States has subsequently increased in recent years, and continued up through the present (Towne and Wentworth. 1950, Wood and Barrett 1979, Mayer and Brisbin 1991, Dickson et al. 2001). In spite of a fairly constant history in this country since the early 1900s, wild pigs have had a dramatic recent increase in both distribution and numbers in the United States. Between 1989 and 2009, the number of states reporting the presence of introduced wild pigs went from 19 up to as many as 44. This increase, in part natural, but largely manmade, has caused an increased workload and cost for land and resource managers in areas where these new populations are found. This is the direct result of the damage that these introduced animals do. The cost of both these impacts and control efforts has been estimated to exceed a billion dollars annually (Pimentel 2007). The complexity of this problem has been further complicated by the widespread appeal and economic potential of these animals as a big game species (Tisdell 1982, Degner 1989). Wild pigs are a controversial problem that is not going away and will likely only get worse with time. Not only do they cause damage, but wild pigs are also survivors. They reproduce at a rate faster than any other mammal of comparable size, native or introduced; they can eat just about anything; and, they can live just about anywhere. On top of that, wild pigs are both very difficult to control and, with the possible exception of island ecosystems, almost impossible to eradicate (Dickson et al. 2001, Sweeney et al. 2003). The solution to the wild pig problem has not been readily apparent. The ultimate answer as to how to control these animals has not been found to date. In many ways, wild pigs are America's most successful large invasive species. All of which means that wild pigs are a veritable nightmare for land and resource managers trying to keep the numbers of these animals and the damage that they do under control. Since the more that one knows about an invasive species, the easier it is to deal with and hopefully control. For wild pigs then, it is better to 'know thy enemy' than to not, especially if one expects to be able to successfully control them. In an effort to better 'know thy enemy,' a two-day symposium was held in Augusta, Georgia, on April 21-22, 2004. This symposium was organized and sponsored by U.S.D.A. Forest Service-Savannah River (USFS-SR), U. S. Department of Energy-Savannah River Operations Office (DOE-SR), the Westinghouse Savannah River Company (WSRC), the South Carolina Chapter of the Soil & Water Conservation Society, and the Savannah River Ecology Laboratory (SREL). The goal of this symposium was to assemble researchers and land managers to first address various aspects of the biology and damage of wild pigs, and then review the control techniques and management of this invasive species. The result would then be a collected synopsis of what is known about wild pigs in the United States. Although the focus of the symposium was primarily directed toward federal agencies, presenters also included professionals from academic institutions, and private-sector control contractors and land managers. Most of the organizations associated with implementing this symposium were affiliated with the Savannah River Site (SRS), a 803 km{sup 2} federal nuclear facility, located in western South Carolina along the Savannah River. The SRS was a very appropriate facility to host this symposium. The SRS has been dealing with its wild pig problem since the early 1950s. A lot has been learned about these animals at the site over the ensuing decades. Between the USFS-SR, DOE-SR, SREL, and the site's management and operations contractor, which is currently Savannah River Nuclear Solutions, SRS organizations have conducted a wealth of research on this wild pig population, spanning a broad spectrum of topics and disciplines. In fact, the SRS wild pig population is among the most studied, and possibly is the best studied population of this invasive species found in the United States today. Unfortunately, with all of that work, the ultimate answer to controlling wild pigs and their impacts still has not been found. This volume represents the collected synopsis that was the goal of the aforementioned symposium.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Guidelines for Preparation and Presentation of Geologic Information

A complex geology lies beneath the Hanford Site of southeastern Washington State. Within this geology is a challenging large-scale environmental cleanup project. Geologic and contaminant transport information generated by several U.S. Department of Energy contractors must be documented in geologic graphics clearly, consistently, and accurately. These graphics must then be disseminated in formats readily acceptable by general graphics and document producing software applications. The guidelines presented in this document are intended to facilitate consistent, defensible, geologic graphics and digital data/graphics sharing among the various Hanford Site agencies and contractors.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory’s Greenhouse Gas FY08 Baseline

A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at the INL. Additionally, the INL has a desire to see how its emissions compare with similar institutions, including other DOE-sponsored national laboratories. Executive Order 13514 requires that federally-sponsored agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL’s FY08 GHG inventory was calculated according to methodologies identified in Federal recommendations and an as-yet-unpublished Technical and Support Document (TSD) using operational control boundary. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries but are a consequence of INL’s activities). This inventory found that INL generated a total of 114,256 MT of CO2-equivalent emissions during fiscal year 2008 (FY08). The following conclusions were made from looking at the results of the individual contributors to INL’s baseline GHG inventory: • Electricity is the largest contributor to INL’s GHG inventory, with over 50% of the net anthropogenic CO2e emissions • Other sources with high emissions were stationary combustion, fugitive emissions from the onsite landfill, mobile combustion (fleet fuels) and the employee commute • Sources with low emissions were contracted waste disposal, wastewater treatment (onsite and contracted) and fugitive emissions from refrigerants. This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to stress that the methodology behind this inventory followed guidelines that have not yet been formally adopted. Thus, some modification of the conclusions may be necessary as additional guidance is received. Further, because this report differentiates between those portions of the INL that are managed and operated by the Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only that large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PUBLIC AND REGULATORY ACCEPTANCE OF BLENDING OF RADIOACTIVE WASTE VS DILUTION

On April 21, 2009, the Energy Facilities Contractors Group (EFCOG) Waste Management Working Group (WMWG) provided a recommendation to the Department of Energy's Environmental Management program (DOE-EM) concerning supplemental guidance on blending methodologies to use to classify waste forms to determine if the waste form meets the definition of Transuranic (TRU) Waste or can be classified as Low-Level Waste (LLW). The guidance provides specific examples and methods to allow DOE and its Contractors to properly classify waste forms while reducing the generation of TRU wastes. TRU wastes are much more expensive to characterize at the generator's facilities, ship, and then dispose at the Waste Isolation Pilot Plant (WIPP) than Low-Level Radioactive Waste's disposal. Also the reduction of handling and packaging of LLW is inherently less hazardous to the nuclear workforce. Therefore, it is important to perform the characterization properly, but in a manner that minimizes the generation of TRU wastes if at all possible. In fact, the generation of additional volumes of radioactive wastes under the ARRA programs, this recommendation should improve the cost effective implementation of DOE requirements while properly protecting human health and the environment. This paper will describe how the message of appropriate, less expensive, less hazardous blending of radioactive waste is the 'right' thing to do in many cases, but can be confused with inappropriate 'dilution' that is frowned upon by regulators and stakeholders in the public. A proposal will be made in this paper on how to communicate this very complex and confusing technical issue to regulatory bodies and interested stakeholders to gain understanding and approval of the concept. The results of application of the proposed communication method and attempt to change the regulatory requirements in this area will be discussed including efforts by DOE and the NRC on this very complex subject.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Integrity of Single Shell Tanks at Hanford - 9491

The 149 Single Shell Tanks at the Hanford Site were constructed between the 1940’s and the 1960’s. Many of the tanks are either known or suspected to have leaked in the past. While the free liquids have been removed from the tanks, they still contain significant waste volumes. Recently, the tank farm operations contractor established a Single Shell Tank Integrity Program. Structural integrity is one aspect of the program. The structural analysis of the Single Shell Tanks has several challenging factors. There are several tank sizes and configurations that need to be analyzed. Tank capacities range from fifty-five thousand gallons to one-million gallons. The smallest tank type is approximately twenty feet in diameter, and the three other tank types are all seventy-five feet in diameter. Within each tank type there are varying concrete strengths, types of steel, tank floor arrangements, in-tank hardware, riser sizes and locations, and other appurtenances that need to be addressed. Furthermore, soil properties vary throughout the tank farms. The Pacific Northwest National Laboratory has been conducting preliminary structural analyses of the various single shell tank types to address these parameters. The preliminary analyses will assess which aspects of the tanks will require further detailed analysis. Evaluation criteria to which the tanks will be analyzed are also being developed for the Single Shell Tank Integrity Program. This information will be reviewed by the Single Shell Tank Integrity Expert Panel that has been formed to issue recommendations to the DOE and to the tank farm operations contractor regarding Single Shell Tank Integrity. This paper provides a summary of the preliminary analysis of the single shell tanks, a summary of the recommendations for the detailed analyses, and the proposed evaluation criteria by which the tanks will be judged.

54 ENVIRONMENTAL SCIENCES↗

Premature ignition of a rocket motor.

During preparation for a rocket sled track (RST) event, there was an unexpected ignition of the zuni rocket motor (10/9/08). Three Sandia staff and a contractor were involved in the accident; the contractor was seriously injured and made full recovery. The data recorder battery energized the low energy initiator in the rocket.

33 ADVANCED PROPULSION SYSTEMS↗

DEEP VADOSE ZONE APPLIED FIELD RESEARCH CENTER: TRANSFORMATIONAL TECHNOLOGY DEVELOPMENT FOR ENVIRONMENTAL REMEDIATION

DOE-EM, Office of Groundwater and Soil Remediation and DOE Richland, in collaboration with the Hanford site and Pacific Northwest National Laboratory, have established the Deep Vadose Zone Applied Field Research Center (DVZ-AFRC). The DVZ-AFRC leverages DOE investments in basic science from the Office of Science, applied research from DOE EM Office of Technology Innovation and Development, and site operation (e.g., site contractors [CH2M HILL Plateau Remediation Contractor and Washington River Protection Solutions], DOE-EM RL and ORP) in a collaborative effort to address the complex region of the deep vadose zone. Although the aim, goal, motivation, and contractual obligation of each organization is different, the integration of these activities into the framework of the DVZ-AFRC brings the resources and creativity of many to provide sites with viable alternative remedial strategies to current baseline approaches for persistent contaminants and deep vadose zone contamination. This cooperative strategy removes stove pipes, prevents duplication of efforts, maximizes resources, and facilitates development of the scientific foundation needed to make sound and defensible remedial decisions that will successfully meet the target cleanup goals for one of DOE EM's most intractable problems, in a manner that is acceptable by regulators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ONSITE TRANSPORTATION AUTHORIZATION CHALLENGES AT THE SAVANNAH RIVER SITE

Prior to 2008, transfers of radioactive material within the Savannah River Site (SRS) boundary, referred to as onsite transfers, were authorized by Transportation Safety Basis (TSB) documents that only required approval by the SRS contractor. This practice was in accordance with the existing SRS Transportation Safety Document (TSD). In 2008 the Department of Energy Savannah River Field Office (DOE-SR) requested that the SRS TSD be revised to require DOE-SR approval of all Transportation Safety Basis (TSB) documents. As a result, the primary SRS contractor embarked on a multi-year campaign to consolidate old or generate new TSB documents and obtain DOE-SR approval for each. This paper focuses on the challenges incurred during the rewriting or writing of and obtaining DOE-SR approval of all Savannah River Site Onsite Transportation Safety Basis documents.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mentor Protégé Program Brochure

The U.S. Department of Energy (DOE) Mentor Protégé Program is designed to help small businesses obtain mentoring from DOE prime contractors. The program is meant to foster long-term business relationships between small businesses and DOE prime contractors while increasing the overall number of small business entities that receive DOE contract and subcontract awards.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Improving the Identification, Dissemination and Implementation of Deactivation and Decommissioning Lessons Learned and Best Practices

Approximately $150 billion of work currently remains in the United States Department of Energy's (DoE's) Office of Environmental Management (EM) life cycle budget for U.S. projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and to develop a knowledge-management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. This paper discusses DoE's rationale for using lessons learned and best practices to improve safety and performance while reducing life cycle costs for Deactivation and Decommissioning (D and D) projects. It also provides an update on the Energy Facility Contractors Group's (EFCOG's) progress in supporting DoE's efforts. At this juncture the best practice efforts described are in developmental stages; however, the commitment to and the concrete nature of the work thus far is noteworthy in regard to improving the way D and D lessons learned and best practices are identified, disseminated and implemented across the DOE Complex.

99 GENERAL AND MISCELLANEOUS↗

A One System Integrated Approach to Simulant Selection for Hanford High Level Waste Mixing and Sampling Tests - 13342

The Hanford Tank Operations Contractor (TOC) and the Hanford Waste Treatment and Immobilization Plant (WTP) contractor are both engaged in demonstrating mixing, sampling, and transfer system capabilities using simulated Hanford High-Level Waste (HLW) formulations. This represents one of the largest remaining technical issues with the high-level waste treatment mission at Hanford. Previous testing has focused on very specific TOC or WTP test objectives and consequently the simulants were narrowly focused on those test needs. A key attribute in the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2 is to ensure testing is performed with a simulant that represents the broad spectrum of Hanford waste. The One System Integrated Project Team is a new joint TOC and WTP organization intended to ensure technical integration of specific TOC and WTP systems and testing. A new approach to simulant definition has been mutually developed that will meet both TOC and WTP test objectives for the delivery and receipt of HLW. The process used to identify critical simulant characteristics, incorporate lessons learned from previous testing, and identify specific simulant targets that ensure TOC and WTP testing addresses the broad spectrum of Hanford waste characteristics that are important to mixing, sampling, and transfer performance are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Early Regulatory Engagement for Successful Site Remediation: the UK Experience - 13173

The Office for Nuclear Regulation (ONR) is an independent safety, security and transport regulator of the UK nuclear industry. ONR regulates all civil nuclear reactor power stations, fuel manufacture, enrichment, spent fuel reprocessing, most defence sites and installations that store and process legacy spent fuel and radioactive waste. The responsibility for funding and strategic direction of decommissioning and radioactive waste management of state owned legacy sites has rested solely with the Nuclear Decommissioning Authority (NDA) since 2005. A key component of NDA's mandate was to encourage new strategic approaches and innovation to dealing with the UK's waste legacy and which deliver value-for-money to the UK taxpayer. ONR, as an agency of the Health and Safety Executive, is entirely independent of NDA and regulates all prescribed activities on NDA's sites. NDA's competition of site management and closure contracts has attracted significant international interest and the formation of consortia comprised of major British, US, French and Swedish organizations bidding for those contracts. The prominence of US organizations in each of those consortia reflects the scale and breadth of existing waste management and D and D projects in the US. This paper will articulate, in broad terms, the challenges faced by international organizations seeking to employ 'off-the-shelf' technology and D and D techniques, successfully employed elsewhere, into the UK regulatory context. The predominantly 'goal-setting' regulatory framework in the UK does not generally prescribe a minimum standard to which a licensee must adhere. The legal onus on licensees in the UK is to demonstrate, whatever technology is selected, that in its applications, risks are reduced 'So Far As Is Reasonably Practicable' or 'SFAIRP'. By the nature of its role, ONR adopts a conservative approach to regulation; however ONR also recognises that in the decommissioning (and ultimately the site closure) domain, it is often necessary to consider and support novel approaches to achieve the nationally desired end-state. Crucial to successful and compliant operation in this regulatory environment is early and sustained engagement of the contractor with the regulator. There must be a 'no-surprises' culture to engender regulatory confidence early in a project. The paper considers some of the challenges facing international prime and lower tier contractors when undertaking D and D contracts in the UK, and emphasizes the importance of constructive and transparent dialogue with all regulators to sustain confidence at all stages of a major decommissioning project. The paper will also articulate ONR's strategy to increase collaboration with the US Department of Energy in light of increasing UK-US synergy in the area of waste management and to benchmark respective regulatory approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Improvements in Interface Management for Hanford's Waste Treatment and Immobilization Plant - 13263

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for management and completion of the River Protection Project (RPP) mission, which includes the Hanford Site tank farms operations and the Waste Treatment and Immobilization Plant (WTP). The RPP mission is to store, retrieve and treat Hanford's tank waste; store and dispose of treated wastes; and close the tank farm waste management areas and treatment facilities by 2047. The WTP is currently being designed and constructed by Bechtel National Inc. (BNI) for DOE-ORP. BNI relies on a number of technical services from other Hanford contractors for WTP's construction and commissioning. These same services will be required of the future WTP operations contractor. Partly in response to a DNFSB recommendation, the WTP interface management process managing these technical services has recently been improved through changes in organization and issue management. The changes are documented in an Interface Management Plan. The organizational improvement is embodied in the One System Integrated Project Team that was formed by integrating WTP and tank farms staff representing interfacing functional areas into a single organization. A number of improvements were made to the issue management process but most notable was the formal appointment of technical, regulatory and safety subject matter experts to ensure accurate identification of issues and open items. Ten of the thirteen active WTP Interface Control Documents have been revised in 2012 using the improved process with the remaining three in progress. The value of the process improvements is reflected by the ability to issue these documents on schedule and accurately identify technical, regulatory and safety issues and open items. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Quality Objectives for WTP Feed Acceptance Criteria - 12043

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is under construction for the U.S. Department of Energy by Bechtel National, Inc. and subcontractor URS Corporation (contract no. DE-AC27-01RV14136). The plant when completed will be the world's largest nuclear waste treatment facility. Bechtel and URS are tasked with designing, constructing, commissioning, and transitioning the plant to the long term operating contractor to process the legacy wastes that are stored in underground tanks (from nuclear weapons production between the 1940's and the 1980's). Approximately 56 million gallons of radioactive waste is currently stored in these tanks at the Hanford Site in southeastern Washington. There are three major WTP facilities being constructed for processing the tank waste feed. The Pretreatment (PT) facility receives feed where it is separated into a low activity waste (LAW) fraction and a high level waste (HLW) fraction. These fractions are transferred to the appropriate (HLW or LAW) facility, combined with glass former material, and sent to high temperature melters for formation of the glass product. In addition to PT, HLW and LAW, other facilities in WTP include the Laboratory (LAB) for analytical services and the Balance of Facilities (BOF) for plant maintenance, support and utility services. The transfer of staged feed from the waste storage tanks and acceptance in WTP receipt vessels require data for waste acceptance criteria (WAC) parameters from analysis of feed samples. The Data Quality Objectives (DQO) development was a joint team effort between WTP and Tank Operations Contractor (TOC) representatives. The focus of this DQO effort was to review WAC parameters and develop data quality requirements, the results of which will determine whether or not the staged feed can be transferred from the TOC to WTP receipt vessels. The approach involved systematic planning for data collection consistent with EPA guidance for the seven-step DQO process. Data quality requirements for sample collection and analysis of all WAC parameters were specified during the DQO process. There were eighteen key parameters identified with action limits to ensure the feed transfer and receipt would not exceed plant design, safety, permitting, and processing requirements. The remaining WAC parameters were grouped in the category for obtaining data according to WTP contract specifications, regulatory reporting requirements, and for developing the feed campaign processing sequence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Humboldt bay power plant decommissioning transition to civil works - 15039

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR, completed the Plant Systems Removal Phase by removal of all radiologically significant plant systems from the buildings in June 2014. The HBPP historical design and construction, close proximity to the bay and associated tidal interactions poses unique challenges to an effective decommissioning effort as the Site transitions to a major earthwork project - designated as Civil Works. The last significant large component removal project remaining is segmentation and disposal of the reactor pressure vessel shell and this project is now integrated and executed under Civil Works with PG and E solely in an oversight role across the site beginning 2015. The value from run-up and mock-up testing of tooling to segment the HBPP reactor vessel will be discussed. Experience obtained, especially at error prone interfaces, during start-up, systemisation and operating phases for the First of a Kind (KOAK) tooling will be discussed. Implementation of the civil scope of work commenced July 2013. Its status and experience applicable to other decommissioning efforts will be provided from an owner's perspective. Implementation of the civil work scope includes development and implementation of oversight capability including policy, procedures and deployment of skilled, experienced and trained oversight staff in the field. Challenges encountered and solutions implemented during mobilization and ramp up of the civil contractor commensurate with demobilization of the self-perform staff will be covered. Partnering with the contractor to establish a good Client/Contractor relationship and tips on where to invest owner resources will be shared. Development of a solid baseline project schedule that incorporates regulatory constraints, client expectations and contract constraints and its importance to safe, compliant project execution will be shared. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗