Search NASA⌕ Search

SEARCH · Search NASA

Results for “Consequence - Focused Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Satellite power system LEO vs GEO assembly issues

A strawman crystal-silicon 5-GW Satellite Power System (SPS) concept formed the basis of a study of construction concepts for building a complete SPS in low earth orbit (LEO) or geosynchronous orbit (GEO). Construction scenarios were evolved, including factory-in-space concepts and operations. Design implications imposed on the SPS satellite as a consequence of in-orbit assembly operations, and related attitude control requirements during assembly in LEO or GEO environments, were also evaluated. Results are presented indicating that complete assembly of an operational SPS in LEO, followed by transport to GEO, does not appear technically desirable. The best mix, however, of LEO versus GEO construction activity remains to be resolved.

Mockovciak, J., Jr.↗

Analytical fuel property effects, small combustors, phase 1

The effects of nonstandard aviation fuels on a typical small gas turbine combustor was analyzed. The T700/CT7 engine family was chosen as being representative of the class of aircraft power plants desired. Fuel properties, as specified by NASA, are characterized by low hydrogen content and high aromatics levels. Higher than normal smoke output and flame radiation intensity for the current T700 combustor which serves as a baseline were anticipated. It is, therefore, predicted that out of specification smoke visibility and higher than normal shell temperatures will exist when using NASA ERBS fuels with a consequence of severe reduction in cyclic life. Three new designs are proposed to compensate for the deficiencies expected with the existing design. They have emerged as the best of the eight originally proposed redesigns or combinations thereof. After the five choices that were originally made by NASA on the basis of competing performance factors, General Electric narrowed the field to the three proposed.

Cohen, J. D.↗

Aircraft and satellite thermographic systems for wildfire mapping and assessment

Two complementary sensors, the DAEDALUS DEI-1260 Multispectral Scanner aboard the NASA U-2 aircraft and the Advanced Very High Resolution Radiometer aboard National Oceanographic and Atmospheric Administration orbiting satellites were tested for their applicability in monitoring and predicting parameters such as fire location, temperature and rate of spread, soil heating and cooling rates, and plume characteristics and dimensions. In addition, the satellite system was tested for its ability to extend the relationships found between fire characteristics and biospheric consequences to regional and global scales. An overall system design is presented, and special requirements are documented for the application of this system for fire research and management.

Brass, J. A.↗

Active control of bearing preload using piezoelectric translators

In many spacecraft applications, mechanisms are required to perform precision pointing operations or to sometimes dither about or track a moving object. These mechanisms perform in a predictable and repeatable manner in benign temperature environments. Severe thermal gradients experienced in actual space applications however, cause assemblies to expand and contract around their bearings. This results in unpredictable changes in bearing preload, and hence bearing friction. This becomes a limitation for servos controlling pointing accuracy. Likewise, uncontrollable vibrations may couple into fixed preload (hence, fixed stiffness) mechanisms and limit pointing accuracy. Consequently, a complex problem faced today is how to design mechanisms that remain insensitive to changing thermal and vibrational spacecraft environments. Research presented involves the simplified modeling and test results of an actuator module that used piezoelectrically preload controlled bearings. The feasibility of actively controlling bearing preload was demonstrated. Because bearing friction is related to preload, a thermally active system designed with aluminum components and a 440 C bearing, was friction tested at temperatures ranging from 0 to 70 C (32 to 158 F). Effectiveness of the translators were demonstrated by mapping a controllable friction range throughout tested temperatures. It was learned that constant preload for this system could be maintained over an approximate 44 C (79 F) temperature span. From testing, it was also discovered that at the more deviate temperatures, expansions were so large that radial clearances were taken up and the duplex bearing became radially preloaded. Thus, active control of bearing preload is feasible but may be limited by inherent geometry constraints and materials used in the system.

Nye, Ted W.↗

Synthetic-Aperture Antenna Array With Beam-Waveguide Coupling

Proposed synthetic-aperture antenna array for radio astronomy at wavelengths between 60 and 300 micrometers includes twelve 3.5-m-diameter paraboloidal-dish antennas at various positions along three 0.5-km-long arms of Y-shaped pattern. Receivers located centrally, with consequent reductions in complexity and cost. Innovative features of design also stimulates solutions to engineering problems arising in terrestrial radio systems.

Mahoney, Michael J.↗

The Pluto fast flyby mission: Completing the reconnaissance of the solar system

The concept of a fast flyby mission to Pluto has been advanced as a means to complete the reconnaissance of the known solar system. In order to acquire data on the Pluto system at the earliest possible time, and within the professional lifetime of investigators now active in the field, concepts are being developed for relatively small spacecraft in the mass range of 70 Kg to 350 Kg with flight times to Pluto of 7 to 13 years. Necessarily, the science complement on such a mission will be very mass and power limited. The challenge will be to define a spacecraft and an instrument package that will maximize the scientific return within these limitations. Cost, of course, will be a major consideration, and funds for new technology development specific to this mission will not be extensive. Consequently, innovative ways to incorporate elegant simplicity into the designs must be found. In order to facilitate exploration of the Pluto-Charon system, fully integrated science payloads must be developed. Two proposed mission designs involving limited mass and power science payloads have been presented to the Outer Planets Science Working Group (OPSWG). These payload mass allocations range from 5 to 30 kilograms with power allocations as low as 5 watts. The drivers behind these low mass and power allocations are that they enable developing missions to fit within the moderate mission cost profile and allow fast flight times to Pluto (7 to 13 years). The OPSWG has prioritized science goals for this class of reconnaissance mission. Three specific science objectives were identified as the highest priority required for the first Pluto mission. These goals were: (1) study of the neutral atmosphere, (2) geology and morphology, and (3) surface compositional mapping. In order to achieve these science goals within the constraints of low mass, power and cost, it may be necessary to combine the functions of 3 conventional instruments (CCD camera, Ultra-Violet Spectrometer, and Infrared Spectrometer) into one fully integrated payload. Where possible, this payload would share optics, mechanisms, electronics and packaging.

Henry, Paul K.↗

Managing Risk for Thermal Vacuum Testing of the International Space Station Radiators

The International Space Station (ISS) is designed with large deployable radiator panels that are used to reject waste heat from the habitation modules. Qualification testing of the Heat Rejection System (HRS) radiators was performed using qualification hardware only. As a result of those tests, over 30 design changes were made to the actual flight hardware. Consequently, a system level test of the flight hardware was needed to validate its performance in the final configuration. A full thermal vacuum test was performed on the flight hardware in order to demonstrate its ability to deploy on-orbit. Since there is an increased level of risk associated with testing flight hardware, because of cost and schedule limitations, special risk mitigation procedures were developed and implemented for the test program, This paper introduces the Continuous Risk Management process that was utilized for the ISS HRS test program. Testing was performed in the Space Power Facility at the NASA Glenn Research Center, Plum Brook Station located in Sandusky, Ohio. The radiator system was installed in the 100-foot diameter by 122-foot tall vacuum chamber on a special deployment track. Radiator deployments were performed at several thermal conditions similar to those expected on-orbit using both the primary deployment mechanism and the back-up deployment mechanism. The tests were highly successful and were completed without incident.

Carek, Jerry A.↗

Improved Electrohydraulic Linear Actuators

A product line of improved electrohydraulic linear actuators has been developed. These actuators are designed especially for use in actuating valves in rocket-engine test facilities. They are also adaptable to similar industrial uses. The advantageous features of the improved electrohydraulic linear actuators are best described with respect to shortcomings of prior electrohydraulic linear actuators that the improved ones are intended to supplant. The shortcomings are the following: They perform unreliably and inconsistently as positioning devices. Their capabilities for end-of-stroke buffering (that is, deceleration to gentle stops at designated stopping positions) range from unsatisfactory to nonexistent, with consequent potential for inducing catastrophic failures. It takes long times to modify standard actuators to meet specifications, and the costs of such modifications are high. In the cases of actuators equipped with fail-safe shutdown systems, the stroking times of these systems cannot be adjusted in the field.

Hamtil, James↗

Why System Safety Professionals Should Read Accident Reports

System safety professionals, both researchers and practitioners, who regularly read accident reports reap important benefits. These benefits include an improved ability to separate myths from reality, including both myths about specific accidents and ones concerning accidents in general; an increased understanding of the consequences of unlikely events, which can help inform future designs; a greater recognition of the limits of mathematical models; and guidance on potentially relevant research directions that may contribute to safety improvements in future systems.

Holloway, C. M.↗

Characterization of Carbon Dioxide Washout Measurement Techniques in the Mark-III Space Suit

Providing adequate carbon dioxide (CO2) washout is essential to the reduction of risk in performing suited operations. Long term CO2 exposure can lead to symptoms such as headache, lethargy, dizziness, and in severe cases can lead to unconsciousness and death. Thus maintaining adequate CO2 washout in both ground testing and during in flight EVAs is a requirement of current and future suit designs. It is necessary to understand the inspired CO2 of suit wearers such that future requirements for space suits appropriately address the risk of inadequate washout. Testing conducted by the EVA Physiology Laboratory at the NASA Johnson Space Center aimed to characterize a method for noninvasively measuring inspired oronasal CO2 under pressurized suited conditions in order to better inform requirements definition and verification techniques for future CO2 washout limits in space suits. Prior work conducted by the EPL examined several different wearable, respirator style, masks that could be used to sample air from the vicinity surround the nose and mouth of a suited test subject. Previously published studies utilized these masks, some being commercial products and some novel designs, to monitor CO2 under various exercise and flow conditions with mixed results for repeatability and/or consistency between subjects. Based on a meta-analysis of those studies it was decided to test a nasal cannula as it is a commercially available device that is placed directly in the flow path of the user as they breathe. A nasal cannula was used to sample air inhaled by the test subjects during both rest and exercise conditions. Eight subjects were tasked with walking on a treadmill or operating an arm ergometer to reach target metabolic rates of 1000, 2000, and 3000 BTU/hr. Suit pressure was maintained at 4.3 psid for all tests, with supply flow rates of 6, 4, and 2 actual cubic feet per minute depending on the test condition. Each test configuration was conducted twice with subjects breathing either through their nose only, or however they felt comfortable. By restricting breathing through a single orifice, we are able to more accurately define exactly what flow stream the sampled CO2 is taken from. Oronasal CO2 was monitored using real time infrared gas analyzers fed via sample tubes connected to the nasal cannula within the suit. Two additional sampling tubes were placed at the head and chin of the test subject, in an effort to capture CO2 concentrations across the entire flow stream of the Mark-III vent system (flow path is head to neck). Metabolic rate was calculated via the exhaust CO2 concentration and used to adjust subject workload on either the treadmill or arm ergometer until the target was reached. Forward work will aim to characterize the historically accepted minimum ppCO2 in suit during EVA by repeating this study in the Extravehicular Mobility Unit (EMU) space suit. This will help to define washout requirements for future suits, be they NASA (e.g. Z-2) or Commercial Crew designed. Additionally it is important to determine the functional consequences of CO2 exposure during EVA. Severe CO2 symptoms are a result of very high concentration, acute exposures. While long term, low concentration exposures have been shown to result in slight cognitive decline, symptoms resolve upon quickly returning to nominal concentrations and it remains unknown the impact that minor deficits in cognitive performance can have on EVA performance.

Norcross, J.↗

Tethered Space Satellite-1 (TSS-1): Technical Roundabouts

In the early 1990's US and Italian scientists collaborated to study the electrodynamics of dragging a satellite on a tether through the electrically charged portion of Earth's atmosphere called the ionosphere. An electrical current induced in the long wire could be used for power and thrust generation for a satellite. Other tether uses include momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization for satellites. Before the Tethered Space Satellite (TSS-1), no long tether had ever been flown, so many questions existed on how it would actually behave. The TSS consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. With the Space Shuttle at an altitude of 160 nautical miles above earth, the satellite was to be deployed by raising it from the Shuttle bay on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism was to slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. Pre-flight testing system level tests involved setting up a tether receiver to catch the 12.5 mile tether onto another reel as it was being unwound by the deployer reel mechanism. Testing only the reel mechanism is straightforward. This test becomes more complicated when the TSS is mounted on the flight pallet at Kennedy Space Center (KSC). The system level tests must be passed before the pallet can be installed into the Space Shuttle cargo bay. A few months before flight, the TSS payload had been integrated onto the Spacelab pallet and system level tests, including unreeling and reeling the tether, had been successfully completed. Some of this testing equipment was then shipped back to the contractor Martin Marietta. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. The coupled loads analysis, as it is called, incorporates any updates to the model due to system level tests, and any changes that were found during integration. The coupled loads analysis revealed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail during operation. Hardware certification rules do not allow for hardware to fly with negative margins, so this issue had to be resolved before the flight. Since there is conservatism in engineering analysis, there is an option to "waive" the margin requirement, and fly the experiment as is. On the other hand, a structural failure of one payload could have serious or catastrophic consequences to other payloads and possibly the mission. Minor design changes or fixes might be feasible within the payload bay prior to launch. Any major design changes that required the spooling test to validate the hardware, or for the pallet to be removed, would cause TSS not to be ready for the Shuttle launch.

O'Connor, Brian↗

Feedback to AEDT2b from a ATM Researcher Viewpoint

AEDT2b (Aviation Environment Design Tool version 2b) is FAA's aviation environmental consequence tool. We have integrated part of AEDT2b's fuel and emission computation modules with our FACET in the past years. This talk is to provide the feedback to AEDT2b's development team from a ATM researcher viewpoint.

Li, Jinhua↗

Development of Buffet Functions using Frequency-Dependent Coherence Factors

Launch vehicle transonic buffet environments produce large fluctuating pressures on the surface of the vehicle. Transonic buffet occurs as a launch vehicle passes through the transonic regime, typically Mach 0.8 to 1.2, where phenomena such as flow separation and shock dynamics produce large fluctuating pressures. The unsteady aerodynamic forces produced by these phenomena can excite both global and local vehicle structural response. The consequences of incorporating poorly characterized buffet forces into the design process can range from inefficient structures that can reduce the vehicle capabilities to undersized structures that, in the worst case scenario, may result in structural failure (Refs. 1, 2, 3). It is thus imperative to appropriately characterize the transonic buffet environment.

buffet↗

A Saltation Sensor for the Martian Aqueous Habitat Reconnaissance Suite (MAHRS)

Wind-blown sand, otherwise known as saltation, occurs on the surface of Mars, but its characteristics are poorly understood due to insufficient data (Kok, 2010). Space-qualified instrumentation for acquiring saltation data is unavailable, making it difficult to advance our knowledge in this area. Consequently, a saltation sensor probe with supporting electronics was designed and constructed with a clear path to space readiness in order to support future science missions to the Martian surface for advancing the understanding of Martian saltation.

Saltation Sensor↗

Gecko Mobility Aids for a Common Habitat Architecture

Spacecraft large enough for crew to move around inside them have traditionally used handrails and foot restraints to enable crew mobility. The mass of this hardware can become significant in large spacecraft such as the Common Habitat. Additionally, handrails and foot restraints in a multi-gravity habitat are trip hazards when the habitat is in a gravity environment. Further, ISS crew have noted risks of breaking ankles and wrists when using handrails for translation and have noted places where not enough handrails are present. Robotic gecko-derived grippers developed by JPL to retrieve satellites can be adapted to crew-worn pads that can adhere to surfaces to enable crew translation in microgravity. This technology will help to eliminate the need for handrails and foot restraints for mobility in crewed microgravity spacecraft cabins. It has the potential to achieve significant mass reductions in future space habitats, with application to suborbital flight, LEO, cislunar space, interplanetary space, the Moon, and Mars. Additionally, it can prevent crew injury and discomfort. Project goals and objectives are to prepare gecko uniform prototypes for use in multi-gravity testing and conduct initial investigations into human factors of postures and motions needed for intravehicular activity (IVA) translation and restraint in multiple gravity environments, without the use of handrails or foot restraints. Gecko grippers have been tested for use as robotic end effectors terrestrially, on microgravity aircraft, and aboard the ISS. Using the grippers as a body-mounted system to achieve IVA crew mobility is a new application that has not been pursued outside of this effort. This work will continue paper studies performed by NASA student interns by developing physical prototypes of spacecraft crew uniforms with gecko-derived body-mounted grippers. Clothing prototypes may include long sleeves, short sleeves, long pants, shorts, gloves, and/or booties equipped with gecko gripper pads. Forward work is to test these uniforms in a 1g environment to verify that the design does not introduce obstructions, trip hazards, or other consequences when used in terrestrial gravity. Based on the 1g test results, the uniform prototypes will be refined, and a test plan developed for testing at 0g, (1/6)g, and (3/8)g.

Restraints and Mobility Aids↗

NASA Engineering and Safety Center Technical Bulletin No. 23-02: Safety Considerations when Repurposing Commercially Available Flight Termination Systems from Uncrewed to Crewed Launch Vehicles

Both uncrewed and crewed launch vehicles (LV) require Flight Termination Systems (FTS) for Range Safety to protect the public and ground assets in the event of a LV failure. Flight crew safety in this context is an added consideration for human spaceflight. The FTS is an electroexplosive system that activates destruct charges to rupture propellant tanks and shutdown engines during flight termination. Commercially available FTS units have been developed for uncrewed applications and are now being repurposed to crewed applications. A consequence of using these systems is that they are designed for public and ground crew safety, though inadequate for flight crew safety. Missing are Human Space Flight (HSF) design controls for inadvertent activation during crewed ascent and protection for crew emergency abort.

Flight Termination Systems↗

Control-structure-thermal interactions in analysis of lunar telescopes

The lunar telescope project was an excellent model for the CSTI study because a telescope is a very sensitive instrument, and thermal expansion or mechanical vibration of the mirror assemblies will rapidly degrade the resolution of the device. Consequently, the interactions are strongly coupled. The lunar surface experiences very large temperature variations that range from approximately -180 C to over 100 C. Although the optical assemblies of the telescopes will be well insulated, the temperature of the mirrors will inevitably fluctuate in a similar cycle, but of much smaller magnitude. In order to obtain images of high quality and clarity, allowable thermal deformations of any point on a mirror must be less than 1 micron. Initial estimates indicate that this corresponds to a temperature variation of much less than 1 deg through the thickness of the mirror. Therefore, a lunar telescope design will most probably include active thermal control, a means of controlling the shape of the mirrors, or a combination of both systems. Historically, the design of a complex vehicle was primarily a sequential process in which the basic structure was defined without concurrent detailed analyses or other subsystems. The basic configuration was then passed to the different teams responsible for each subsystem, and their task was to produce a workable solution without requiring major alterations to any principal components or subsystems. Consequently, the final design of the vehicle was not always the most efficient, owing to the fact that each subsystem design was partially constrained by the previous work. This procedure was necessary at the time because the analysis process was extremely time-consuming and had to be started over with each significant alteration of the vehicle. With recent advances in the power and capacity of small computers, and the parallel development of powerful software in structural, thermal, and control system analysis, it is now possible to produce very detailed analyses of intermediate designs in a much shorter period of time. The subsystems can thus be designed concurrently, and alterations in the overall design can be quickly adopted into each analysis; the design becomes an iterative process in which it is much easier to experiment with new ideas, configurations, and components. Concurrent engineering has the potential to produce efficient, highly capable designs because the effect of one subystem on another can be assessed in much more detail at a very early point in the program. The research program consisted of several tasks: scale a prototype telescope assembly to a 1 m aperture, develop a model of the telescope assembly by using finite element (FEM) codes that are available on site, determine structural deflections of the mirror surfaces due to the temperature variations, develop a prototype control system to maintain the proper shape of the optical elements, and most important of all, demonstrate the concurrent engineering approach with this example. In addition, the software used for the finite element models and thermal analysis was relatively new within the Program Development Office and had yet to be applied to systems this large or complex; understanding the software and modifying it for use with this project was also required. The I-DEAS software by Structural Dynamics Research Corporation (SDRC) was used to build the finite element models, and TMG developed by Maya Heat Transfer Technologies, Ltd. (which runs as an I-DEAS module) was used for the thermal model calculations. All control system development was accomplished with MATRIX(sub X) by Integrated Systems, Inc.

Thompson, Roger C.↗

Beam-waveguide antenna servo design issues for tracking low earth-orbiting satellites

Upcoming NASA missions will require tracking of low-orbit satellites. As a consequence, NASA antennas will be required to track satellites at higher rates than for the current deep space missions. This article investigates servo design issues for the 34-m beam-waveguide antennas that track low-orbit satellites. This includes upgrading the servo with a feedforward loop, using a monopulse controller design, and reducing tracking errors through either proper choice of elevation pinion location, application of a notch filter, or adjustment of the elevation drive amplifier gain. Finally, improvement of the signal-to-noise ratio through averaging of the over-sampled monopulse signal is described.

Gawronski, W. K.↗