Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

SPHERES and Astrobee: Space Station Robotic Free Flyers

Free-flying space robots can be used when humans are present to off-load routine work, to increase astronaut productivity, and to handle contingencies. The International Space Station (ISS), for example, is a continuously manned orbital laboratory the size of a large house, which contains many thousands of inventory items and hundreds of diverse payloads and experiments - all of which have to be managed by 6 person crew. To help with this, NASA is developing and testing robotic free-flyers on the ISS. SPHERES (Synchronized Position Hold, Engage, Reorient, Experimental Satellites) is an ISS facility with three nano-satellites designed to research estimation, control, and autonomy algorithms. SPHERES are volleyball-sized, have their own power, propulsion and navigation systems, and work on the ISS under astronaut supervision. For more than 10 years, NASA has made SPHERES available to other U.S. government agencies, schools, commercial companies and students as a platform for science, technology development, and education. SPHERES will soon be succeeded by the new Astrobee free-flying robot. Astrobee builds on the success of SPHERES, but in addition to research, the robot will also be used for housekeeping and monitoring duties without astronaut supervision. Astrobee makes extensive use of open-source (the complete software stack is available on GitHub) and is scheduled to be installed on the ISS in late Spring 2018.

Benavides, Jose V.↗

Protecting intellectual property in space; Proceedings of the Aerospace Computer Security Conference, McLean, VA, March 20, 1985

The primary purpose of the Aerospace Computer Security Conference was to bring together people and organizations which have a common interest in protecting intellectual property generated in space. Operational concerns are discussed, taking into account security implications of the space station information system, Space Shuttle security policies and programs, potential uses of probabilistic risk assessment techniques for space station development, key considerations in contingency planning for secure space flight ground control centers, a systematic method for evaluating security requirements compliance, and security engineering of secure ground stations. Subjects related to security technologies are also explored, giving attention to processing requirements of secure C3/I and battle management systems and the development of the Gemini trusted multiple microcomputer base, the Restricted Access Processor system as a security guard designed to protect classified information, and observations on local area network security.

Source record↗

ISS Regenerative Life Support: Challenges and Success in the Quest for Long-Term Habitability in Space

This presentation will discuss the International Space Station s (ISS) Regenerative Environmental Control and Life Support System (ECLSS) operations with discussion of the on-orbit lessons learned, specifically regarding the challenges that have been faced as the system has expanded with a growing ISS crew. Over the 10 year history of the ISS, there have been numerous challenges, failures, and triumphs in the quest to keep the crew alive and comfortable. Successful operation of the ECLSS not only requires maintenance of the hardware, but also management of the station resources in case of hardware failure or missed re-supply. This involves effective communication between the primary International Partners (NASA and Roskosmos) and the secondary partners (JAXA and ESA) in order to keep a reserve of the contingency consumables and allow for re-supply of failed hardware. The ISS ECLSS utilizes consumables storage for contingency usage as well as longer-term regenerative systems, which allow for conservation of the expensive resources brought up by re-supply vehicles. This long-term hardware, and the interactions with software, was a challenge for Systems Engineers when they were designed and require multiple operational workarounds in order to function continuously. On a day-to-day basis, the ECLSS provides big challenges to the on console controllers. Main challenges involve the utilization of the resources that have been brought up by the visiting vehicles prior to undocking, balance of contributions between the International Partners for both systems and resources, and maintaining balance between the many interdependent systems, which includes providing the resources they need when they need it. The current biggest challenge for ECLSS is the Regenerative ECLSS system, which continuously recycles urine and condensate water into drinking water and oxygen. These systems were brought to full functionality on STS-126 (ULF-2) mission. Through system failures and recovery, the ECLSS console has learned how to balance the water within the systems, store and use water for contingencies, and continue to work with the International Partners for short-term failures. Through these challenges and the system failures, the most important lesson learned has been the importance of redundancy and operational workarounds. It is only because of the flexibility of the hardware and the software that flight controllers have the opportunity to continue operating the system as a whole for mission success.

Bazley, Jesse A.↗

Leveraging public AI tools to explore systems biology resources in mathematical modeling

Predictive mathematical modeling is an essential part of systems biology and is interconnected with information management. Systems biology information is often stored in specialized formats to facilitate data storage and analysis. These formats are not designed for easy human readability and thus require specialized software to visualize and interpret results. Therefore, comprehending modeling and underlying networks and pathways is contingent on mastering systems biology tools, which is particularly challenging for users with no or little background in data science or system biology. To address this challenge, we investigated the usage of public Artificial Intelligence (AI) tools in exploring systems biology resources in mathematical modeling. We tested public AI’s understanding of mathematics in models, related systems biology data, and the complexity of model structures. Our approach can enhance the accessibility of systems biology for non-system biologists and help them understand systems biology without a deep learning curve.

59 BASIC BIOLOGICAL SCIENCES↗

Testing Enabling Technologies for Safe UAS Urban Operations

A set of more than 100 flight operations were conducted at NASA Langley Research Center using small UAS (sUAS) to demonstrate, test, and evaluate a set of technologies and an overarching air-ground system concept aimed at enabling safety. The research vehicle was tracked continuously during nominal traversal of planned flight paths while autonomously operating over moderately populated land. For selected flights, off-nominal risks were introduced, including vehicle-to-vehicle (V2V) encounters. Three contingency maneuvers were demonstrated that provide safe responses. These maneuvers made use of an integrated air/ground platform and two on-board autonomous capabilities. Flight data was monitored and recorded with multiple ground systems and was forwarded in real time to a UAS traffic management (UTM) server for airspace coordination and supervision.

Moore, Andrew J.↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impact of climate change on adaptive management decisions in the face of water scarcity

Reoccurring drought through the early 2000s has caused a serious water scarcity issue in the Colorado River Basin. Previous modeling studies have focused on the impact of climate change without considering the adaptive behaviors of farmers and under-utilized Indian water rights. Here, we use a coupled agent-based water resource model (ABM) to investigate how the adaptive decisions of farmers can affect water resource management under both climate change impacts and fully utilized Indian water right conditions. We used five General Circulation Model projections with RCP8.5 scenarios for the study. The results of farm-level decision-making showed different responses in irrigated areas that were changing due to climate change impact. While winter precipitation changes might partially explain the behavior changes, no specific pattern could be concluded based on their location. Also, farmers’ responses about annual water diversion showed more significant inter-year variation compared to irrigated areas. Basin-level metrics showed that climate change impacts will generally worsen water scarcity issues as measured in Navajo Reservoir storage, flow to Lake Powell, and instream flow requirement. But these basin-level water scarcity metrics cannot reflect individual farm-level impacts under climate change, which is why modeling the bottom-up management actions is necessary. When the under-utilized Indian water rights are fully used, it is more likely to trigger the shortage sharing agreement due to the higher tribal water depletion. Evaluation of model uncertainty and a more realistic setup for adaptive actions under drought contingency plans are suggested for future research.

54 ENVIRONMENTAL SCIENCES↗

Trajectory Design and Control for the Compton Gamma Ray Observatory Re-Entry

The Compton Gamma Ray Observatory (CGRO) controlled re-entry operation was successfully conducted in June of 2000. The surviving parts of the spacecraft landed in the Pacific Ocean within the predicted footprint. The design of the maneuvers to control the trajectory to accomplish this re-entry presented several challenges. These challenges included timing and duration of the maneuvers, fuel management, post maneuver position knowledge, collision avoidance with other spacecraft, accounting for the break-up of the spacecraft into several pieces with a wide range of ballistic coefficients, and ensuring that the impact footprint would remain within the desired landing area in the event of contingencies. This paper presents the initial re-entry trajectory design and the evolution of the design into the maneuver sequence used for the re-entry. The paper discusses the constraints on the trajectory design, the modifications made to the initial design and the reasons behind these modifications. Data from the re-entry operation are presented.

Hoge, Susan↗

Docking Offset Between the Space Shuttle and the International Space Station and Resulting Impacts to the Transfer of Attitude Reference and Control

The Space Shuttle does not dock at an exact 90 degrees to the International Space Station (ISS) x-body axis. This offset from 90 degrees, along with error sources within their respective attitude knowledge, causes the two vehicles to never completely agree on their attitude, even though they operate as a single, mated stack while docked. The docking offset can be measured in flight when both vehicles have good attitude reference and is a critical component in calculations to transfer attitude reference from one vehicle to another. This paper will describe how the docking offset and attitude reference errors between both vehicles are measured and how this information would be used to recover Shuttle attitude reference from ISS in the event of multiple failures. During STS-117, ISS on-board Guidance, Navigation and Control (GNC) computers began having problems and after several continuous restarts, the systems failed. The failure took the ability for ISS to maintain attitude knowledge. This paper will also demonstrate how with knowledge of the docking offset, the contingency procedure to recover Shuttle attitude reference from ISS was reversed in order to provide ISS an attitude reference from Shuttle. Finally, this paper will show how knowledge of the docking offset can be used to speed up attitude control handovers from Shuttle to ISS momentum management. By taking into account the docking offset, Shuttle can be commanded to hold a more precise attitude which better agrees with the ISS commanded attitude such that start up transients with the ISS momentum management controllers are reduced. By reducing start-up transients, attitude control can be transferred from Shuttle to ISS without the use of ISS thrusters saving precious on-board propellant, crew time and minimizing loads placed upon the mated stack.

Helms, W. Jason↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

Best practices: Organizational execution

This article, the fourth and final installment in the DOE–IDEA series, focuses on organizational execution and how strong management practices, teamwork, and preparedness contribute to successful district energy systems. It highlights case studies from Ashley Energy and Cornell University to illustrate effective operational strategies. Ashley Energy demonstrates the importance of emergency preparedness and rapid response. After a major flood disrupted its plant, the organization restored service in under 72 hours by relying on pre-established plans, vendor relationships, and trained staff. The case emphasizes proactive contingency planning, understanding insurance processes, and empowering skilled personnel to improvise during crises. Cornell University’s example highlights the role of collaboration and transparency in long-term success. Its district energy system benefits from strong data sharing, real-time energy monitoring, and active involvement of faculty and students in system planning and innovation. This culture of teamwork and data-driven decision-making supports sustainability goals and continuous system improvement. Overall, the article shows that effective organizational execution—through preparedness, collaboration, and data transparency—is essential for maintaining reliable, efficient, and sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Trajectory Design and Control for the Compton Gamma Ray Observatory Re-Entry

The Compton Gamma Ray Observatory (CGRO) controlled re-entry operation was successfully conducted in June of 2000. The surviving parts of the spacecraft landed in the Pacific Ocean within the nominal impact target zone. The design of the maneuvers to control the trajectory to accomplish this re-entry presented several challenges. These challenges included the timing and duration of the maneuvers, propellant management, post-maneuver state determination, collision avoidance with other spacecraft, accounting for the break-up of the spacecraft into several pieces with a wide range of ballistic coefficients, and ensuring that the impact footprint would remain within the desired impact target zone in the event of contingencies. This paper presents the initial re-entry trajectory design and traces the evolution of that design into the maneuver sequence used for the re-entry. The paper also discusses the spacecraft systems and operational constraints imposed on the trajectory design and the required modifications to the initial design based on those constraints. Data from the reentry operation are also presented.

Hoge, Susan↗

Preliminary Criticality and Radiation Shielding Analysis for the Storage and Transfer of MARVEL Reactor Spent Nuclear Fuel

This report documents the results of preliminary nuclear criticality and radiation shielding assessments during transfer and dry storage of irradiated Microreactor Applications Research Validation and Evaluation (MARVEL) reactor fuel at Idaho National Laboratory (INL). The assessments focus on transfer casks and storage canisters that are currently in use at INL, which may be compatible with the irradiated MARVEL reactor fuel. The criticality assessments were performed using the radiation transport code MCNP6 with 37 MARVEL reactor fuel elements in various configurations and scenarios. All transfer and storage configurations under dry conditions were below the assumed criticality safety limit of 0.93. Some storage and transfer configurations under wet conditions exceeded the criticality safety limit. This suggests that the appropriate administrative and engineering controls, in addition to reducing the number of MARVEL reactor fuel elements per transfer cask or storage canister, can be expected to ensure criticality safety under all scenarios. The radiation shielding assessments were performed by generating conservative neutron and photon source terms using the ORIGEN module in the SCALE suite of codes. These source spectra were used to estimate the dose equivalent rates using the radiation transport code MCNP6, both on contact and 1 m away from the fuel and transfer casks. The maximum estimated dose equivalent rate of 37 unshielded MARVEL reactor fuel elements on contact is approximately 42000 R/hr. The maximum estimated dose equivalent rates on contact to the ATR transfer cask, HFEF-5 transfer cask, and high load charger were approximately 233 mR/hr, 171 mR/hr, and 201 mR/hr, respectively. This suggests that with the appropriate administrative and engineering controls, all three transfer casks analyzed can be expected to provide sufficient radiation shielding to workers during transfer of irradiated MARVEL reactor fuel. These calculations are performed to support the planning and strategy for the MARVEL project and will demonstrate the technical viability of the different configurations discussed and help identify where engineered or administrative controls may be necessary. A complete criticality safety analysis and radiation shielding analysis, including validation and contingency and accident analysis must be completed by licensed and authorized personnel before any transfer or storage of MARVEL reactor nuclear fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

Yang_et_al_2020_Hydrology_Data

Data supporting the paper "Impact of climate change on adaptive management decisions in the face of water scarcity" in the Journal of Hydrology.

58 GEOSCIENCES↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗