Search NASA⌕ Search

SEARCH · Search NASA

Results for “Corrective Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Maintaining Restored Bone with Bisphosphonate in the Ovariectomized Rat Skeleton: Dynamic Histomorphometry of Changes in Bone Mass

This experiment contains the crucial data for the Lose, Restore and Maintain (LRM) concept, a practical approach for reversing existing osteoporosis. The LRM concept uses ovariectomy (ox) to lose bone, an anabolic agent to restore bone mass and then switches to an antiresorptive agent to maintain bone mass. We ox'd or sham-ox'd rats for 150 days (Loss Phase), treated them with 6 mg PGE(sub 2)kg/d for 75 days to restore lost cancellous bone mass (Restore Phase) and then stopped PGE(sub 2) treatment and began treatment with 1 or 5 micrograms/kg Risedronate, a bisphosphonate twice a week for 60 days (Maintain Phase). During the Loss Phase, cancellous bone volumes of the Proximal Tibial Metaphysis (PTM) in the ox'd rat fell to 19% of initial controls. During the Restore Phase, the PTM bone volume in ox'd rats doubled. However, when PGE(sub 2) treatment was stopped, the PGE(sub 2)-induced cancellous bone disappeared. In contrast, 5 miligrams of Risedronate inhibited the bone loss and maintained it at the PGE(sub 2) treatment level. The key dynamic histomorphometry value for the Restore (R) and Maintenance (M) phases was the ratio of bone formation to resorption rates. The ratio was elevated to 5.8 in the R phase and depressed to 0.4 for no and 1 miligram Risedronate treated M phase and to a ratio of near unity of 1.1 for the 5miligrams Risedronate treatment. These findings indicate that we were successful in maintaining the new PTM bone induced by PGE(sub 2) after discontinuing PGE(sub 2) by administering enough Risedronate, a resorption inhibitor. We concluded that the LRM concept is correct and such an approach should be considered when employing anabolic agents or growth factors in the treatment of osteoporosis. Continued use of an anabolic agent may not be appropriate because of cost, potential adverse side effects and a loss of efficacy.

Jee, W. S. S.↗

The Historical Greenland Climate Network (GC-Net) Curated and Augmented Level-1 Dataset

The Greenland Climate Network (GC-Net) consists of 31 automatic weather stations (AWSs) at 30 sites across the Greenland Ice Sheet. The first site was initiated in 1990, and the project has operated almost continuously since 1995 under the leadership of the late Konrad Steffen. The GC-Net AWS measured air temperature, relative humidity, wind speed, atmospheric pressure, downward and reflected shortwave irradiance, net radiation, and ice and firn temperatures. The majority of the GC-Net sites were located in the ice sheet accumulation area (17 AWSs), while 11 AWSs were located in the ablation area, and two sites (three AWSs) were located close to the equilibrium line altitude. Additionally, three AWSs of similar design to the GC-Net AWS were installed by Konrad Steffen's team on the Larsen C ice shelf, Antarctica. After more than 3 decades of operation, the GC-Net AWSs are being decommissioned and replaced by new AWSs operated by the Geological Survey of Denmark and Greenland (GEUS). Therefore, making a reassessment of the historical GC-Net AWS data is necessary. We present a full reprocessing of the historical GC-Net AWS dataset with increased attention to the filtering of erroneous measurements, data correction and derivation of additional variables: continuous surface height, instrument heights, surface albedo, turbulent heat fluxes, and 10 m ice and firn temperatures. This new augmented GC-Net level-1 (L1) AWS dataset is now available at https://doi.org/10.22008/FK2/VVXGUT (Steffen et al., 2023) and will continue to be refined. The processing scripts, latest data and a data user forum are available at https://github.com/GEUS-Glaciology-and-Climate/GC-Net-level-1-data-processing (last access: 30 November 2023). In addition to the AWS data, a comprehensive compilation of valuable metadata is provided: maintenance reports, yearly pictures of the stations and the station positions through time. This unique dataset provides more than 320 station years of high-quality atmospheric data and is available following FAIR (findable, accessible, interoperable, reusable) data and code practices.

Greenland Climate Network↗

Analysis/forecast experiments with a multivariate statistical analysis scheme using FGGE data

A three-dimensional, multivariate, statistical analysis method, optimal interpolation (OI) is described for modeling meteorological data from widely dispersed sites. The model was developed to analyze FGGE data at the NASA-Goddard Laboratory of Atmospherics. The model features a multivariate surface analysis over the oceans, including maintenance of the Ekman balance and a geographically dependent correlation function. Preliminary comparisons are made between the OI model and similar schemes employed at the European Center for Medium Range Weather Forecasts and the National Meteorological Center. The OI scheme is used to provide input to a GCM, and model error correlations are calculated for forecasts of 500 mb vertical water mixing ratios and the wind profiles. Comparisons are made between the predictions and measured data. The model is shown to be as accurate as a successive corrections model out to 4.5 days.

Baker, W. E.↗

Maintaining Restored Bone with Bisphoshonate in the Ovariectomized Rat Skeleton: Dynamic Histomorphometry of Changes in Bone Mass

This experiment contains the crucial data for the Lose, Restore and Maintain (LRM) concept, a practical approach for reversing existing osteoporosis. The LRM concept uses ovariectomy (ox) to lose bone, an anabolic agent to restore bone mass and then switches to an anti-resorptive agent to maintain bone mass. We ox'd or sham-ox'd rats for 150 days (Loss Phase), treated them with 6 mg PGE2/kg/d for 75 days to restore lost cancellous bone mass (Restore Phase) and then stopped PGE2 treatment and began treatment with 1 or 5 micro-g/kg Risedronate, a bisphosphonate twice a week for 60 days (Maintain Phase). During the Loss Phase, cancellous bone volumes of the proximal tibial metaphysis (PTM) in the ox'd rat fell to 19% of initial controls. During the Restore Phase, the PTM bone volume in ox'd rats doubled. However, when PGE2 treatment was stopped, the PGE2-induced cancellous bone disappeared. In contrast, 5 micro-g of Risedronate inhibited the bone loss and maintained it at the PGE2 treatment level. The key dynamic histomorphometry value for the restore (R) and maintenance (M) phases was the ratio of bone formation to resorption rates. The ratio was elevated to 5.8 in the R phase and depressed to 0.4 for no and 1 micro-g Risedronate treated M phase and to a ratio of near unity of 1.1 for the 5 micro-g Risedronate treatment. These findings indicate that we were successful in maintaining the new PTM bone induced by PGE2 after discontinuing PGE2 by administering enough Risedronate, a resorption inhibitor. We concluded that the LRM concept is correct and such an approach should be considered when employing anabolic agents or growth factors in the treatment of osteoporosis. Continued use of an anabolic agent may not be appropriate because of cost, potential adverse side effects and a loss of efficacy.

Jee, W. S. S.↗

CCN data from TAMU TRACER campaign in the Houston TX region from July to September 2022

During TRACER, the Texas A&M Rapid Onsite Atmospheric Measurements Van (ROAM-V) was deployed to capture airmasses behind (maritime) and ahead (continental) of the passage of the sea-breeze front through Houston. On select sampling days, ROAM-V sampled in the morning/mid-day on the coast and then transited to a second inland site for the afternoon/evening. The suite of instruments deployed on ROAM-V included a Condensation Particle Counter (CPC; GRIMM Model 5.403 CPC), Scanning Mobility Particle Sizer (SMPS; TSI 3750 detector, TSI 3082 classifier, TSI 3088 neutralizer, TSI 3081A Differential Mobility Analyzer), Cloud Condensation Nuclei counter (Droplet Measurement Technologies CCN Counter), micro pulse lidar (Droplet Measurement Technologies Micro Pulse LiDAR (miniMPL)), and a Davis Rotating Uniform size-cut Monitor (DRUM; DRUMAir 4-DRUM). Before sampling at each location, the latitude and longitude were recorded using the GPS on the phone application “My Altitude”. Onboard the ROAM-V, aerosol samples are drawn through a shared isokinetic inlet at a flow rate ranging from 3.5 to 7.0 LPM. A portion of this flow is directed through a cyclone impactor (Brechtel, Inc. Model SCC 0.732) and 0.5 LPM is directed to the CCN. To calculate particle losses, we used a two-step method. First, the measured SMPS size distributions were used to calculate particle loss through the inlet during sampling. Second, the corrected SMPS data was used to calculate the average of the total losses per scan down the CCN line. Then, the correction was applied to the CCN data. This calculation was done separately for each deployment location due to changes in the measured size distributions between locations. Particle loss from diffusion (based on Kesten, 1991 and Gormley, 1949), inertial impaction in 90-degree bends (based on Aerosol Measurement, 2011 and Crane, 1977), and cyclone impactor efficiency (based on Dirgo, 1985) were included in the loss calculation. When the SMPS was not sampling at a location (in the case of an instrument malfunction or operator error), the reported CPC data was corrected with an average of the total losses for the entire campaign at the specified deployment location (e.g., if we needed to correct Galveston data, then the average of all calculated losses at Galveston was taken). These flatline corrections were used for all data on 22/07/13, 22/07/20, 22/07/22, and the data from Galveston on 22/08/09. The supersaturation uncertainty is estimated conservatively at +/- 0.03%, where variation in the inlet temperature, pressure, and calibration technique prevents a more accurate measurement. Confidence in the reported supersaturation measurements is based on a pre-campaign calibration (following the methods from our previous work and Deng, 2014 based on Rose, 2008) in addition to inter-comparisons with the DOE for two days (22/08/18 and 22/09/01) where TAMU was co-located with AMF1. The inter-comparisons show good agreement between our instrument and the DOEs instrument on both days at all supersaturations. After the last inter-comparison on 22/09/01, there was no indication of a malfunction by our instrument through the rest of the campaign. Unfortunately, the instrument was dropped during demobilization. A post-campaign calibration was conducted, which showed a substantial departure from the pre-campaign calibration. The drop may have damaged the instrument’s ability to produce the desired supersaturations. Therefore, we do consider the data after 22/09/01 to be correct, but it should be used with caution. The CCN counter sampled for 3 minutes at each supersaturation setpoint (0.2, 0.4, 0.6, 0.8, 1.0, and 1.2%). At the end of a cycle, the instrument was set to 0.01% supersaturation for 5 minutes. The data is comprised of the last 60 seconds of each supersaturation set point (0.2, 0.4, 0.6, 0.8, 1.0, and 1.2%) to ensure the instrument stabilized and was able to reach thermal equilibrium. We removed the data during the periods where there were operational difficulties, setup, or maintenance. This data was collected for ARM Field Campaign AFC07055 and supported by DOE ASR grant DE-SC0021047. For any further questions, please feel free to contact the instrument PI, Sarah D. Brooks, sbrooks@tamu.edu. Rose et. al. Calibration and Measurement Uncertainties of a Continuous-Flow Cloud Condensation Nuclei Counter (DMT-CCNC): CCN Activation of Ammonium Sulfate and Sodium Chloride Aerosol Particles in Theory and Experiment. Atmos. Chem. Phys., 8, 1153-1179, 2008. Deng et. al. Using Raman Microspectroscopy to Determine Chemical Composition and Mixing State of Airborne Marine Aerosols over the Pacific Ocean. Aerosol Science and Technology, Vol 48, Issue 2, 2014. Kesten et. al. Calibration of a TSI Model 3025 Ultrafine Condensation Particle Counter. Aerosol Science and Technology, 15:2, 107-111, 1991. Gormley et. al. Diffusion from a Stream Flowing through a Cylindrical Tube. Proceedings of the Royal Irish Academy, Vol 52, 163-169, 1948. Aerosol Measurement: Principles, Techniques, and Applications, Third Edition. John Wiley & Sons, Inc, 2011. Crane et. al. Inertial Deposition of Particles in a Bent Pipe. Journal of Aerosol Science, Vol 8, 161-170, 1977. Dirgo et. al. Cyclone Collection Efficiency: Comparison of Experimental Results with Theoretical Predictions. Aerosol Science and Technology, 4:4, 401-415, 1985.

54 ENVIRONMENTAL SCIENCES↗

Multi-Flight-Phase GPS Navigation Filter Applications to Terrestrial Vehicle Navigation and Positioning

A candidate onboard space navigation filter demonstrated excellent performance (less than 8 meter level RMS semi-major axis accuracy) in performing orbit determination of a low-Earth orbit Explorer satellite using single-frequency real GPS data. This performance is significantly better than predicted by other simulation studies using dual-frequency GPS data. The study results revealed the significance of two new modeling approaches evaluated in the work. One approach introduces a single-frequency ionospheric correction through pseudo-range and phase range averaging implementation. The other approach demonstrates a precise axis-dependent characterization of dynamic sample space uncertainty to compute a more accurate Kalman filter gain. Additionally, this navigation filter demonstrates a flexibility to accommodate both perturbational dynamic and observational biases required for multi-flight phase and inhomogeneous application environments. This paper reviews the potential application of these methods and the filter structure to terrestrial vehicle and positioning applications. Both the single-frequency ionospheric correction method and the axis-dependent state noise modeling approach offer valuable contributions in cost and accuracy improvements for terrestrial GPS receivers. With a modular design approach to either 'plug-in' or 'unplug' various force models, this multi-flight phase navigation filter design structure also provides a versatile GPS navigation software engine for both atmospheric and exo-atmospheric navigation or positioning use, thereby streamlining the flight phase or application-dependent software requirements. Thus, a standardized GPS navigation software engine that can reduce the development and maintenance cost of commercial GPS receivers is now possible.

Park, Young W.↗

Columbia Accident Investigation Board Report. Volume Two

Volume II of the Report contains appendices that were cited in Volume I. The Columbia Accident Investigation Board produced many of these appendices as working papers during the investigation into the February 1, 2003 destruction of the Space Shuttle Columbia. Other appendices were produced by other organizations (mainly NASA) in support of the Board investigation. In the case of documents that have been published by others, they are included here in the interest of establishing a complete record, but often at less than full page size. Contents include: CAIB Technical Documents Cited in the Report: Reader's Guide to Volume II; Appendix D. a Supplement to the Report; Appendix D.b Corrections to Volume I of the Report; Appendix D.1 STS-107 Training Investigation; Appendix D.2 Payload Operations Checklist 3; Appendix D.3 Fault Tree Closure Summary; Appendix D.4 Fault Tree Elements - Not Closed; Appendix D.5 Space Weather Conditions; Appendix D.6 Payload and Payload Integration; Appendix D.7 Working Scenario; Appendix D.8 Debris Transport Analysis; Appendix D.9 Data Review and Timeline Reconstruction Report; Appendix D.10 Debris Recovery; Appendix D.11 STS-107 Columbia Reconstruction Report; Appendix D.12 Impact Modeling; Appendix D.13 STS-107 In-Flight Options Assessment; Appendix D.14 Orbiter Major Modification (OMM) Review; Appendix D.15 Maintenance, Material, and Management Inputs; Appendix D.16 Public Safety Analysis; Appendix D.17 MER Manager's Tiger Team Checklist; Appendix D.18 Past Reports Review; Appendix D.19 Qualification and Interpretation of Sensor Data from STS-107; Appendix D.20 Bolt Catcher Debris Analysis.

CAIB (COLUMBIA ACCIDENT INVESTIGATION BOARD)↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Systems, methods and apparatus for modeling, specifying and deploying policies in autonomous and autonomic systems using agent-oriented software engineering

Systems, methods and apparatus are provided through which in some embodiments, an agent-oriented specification modeled with MaCMAS, is analyzed, flaws in the agent-oriented specification modeled with MaCMAS are corrected, and an implementation is derived from the corrected agent-oriented specification. Described herein are systems, method and apparatus that produce fully (mathematically) tractable development of agent-oriented specification(s) modeled with methodology fragment for analyzing complex multiagent systems (MaCMAS) and policies for autonomic systems from requirements through to code generation. The systems, method and apparatus described herein are illustrated through an example showing how user formulated policies can be translated into a formal mode which can then be converted to code. The requirements-based programming systems, method and apparatus described herein may provide faster, higher quality development and maintenance of autonomic systems based on user formulation of policies.

Hinchey, Michael G.↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

The terrestrial radiation environment and EVA's: Prediction requirements, model improvements, and warning systems

The total medical-biological impact of the Earth's space radiation environment on humans is a function of combined EVA and non-EVA exposure. In either case, the correct assessment of the eventual health risk to crew members is crucial to the success and viability of a project or mission. Aside from the medical-biological aspect itself, the validity of any assessment depends entirely on the existence of good and reliable models providing the high quality data that is needed for such evaluations, which should contain time histories of storm and substorm events, their intensities, their frequency of occurence, and their duration. Prediction requirements, advantageous and desirable model developments and improvements, and systems that need to be designed and tested, which would alert space crews and maintenance personnel about impending radiation danger are outlined.

Stassinopoulos, E. G.↗

One-Step Ahead Prediction of Thermal Mixing Tee Sensors with Long Short Term Memory (LSTM) Neural Networks

High-temperature advanced reactors under development, such as sodium fast reactors (SFR) and molten salt cooled reactors (MSCR), are expected to offer lower levelized cost of energy (LCOE) compared to existing light water reactor (LWR’s). In the existing light water reactors (LWR’s), operation and maintenance (O&M) expenses constitute the largest fraction of the total operating cost. Some of the O&M costs are related maintenance of sensors which can fail due to exposure to harsh environment in a reactor. The O&M costs of Advanced Reactor (AR)’s are expected to constitute a significant fraction of the total cost as well, because of high temperature and radiation level in AR are likely to cause material fatigue and premature failure of sensors and components. The O&M costs in AR’s could be reduced through integration of advanced informatics of performance-related sensors into a digital twin designed for reactor monitoring. For example, machine learning (ML) could be employed for real-time validation and correction of performance-related sensors, and reducing the number of performance-related physical sensor units through virtual sensing. As part of the effort, we investigate real-time validation of thermal hydraulic sensors through one-step ahead forecasting of sensor values using long short-term memory (LSTM) recurrent neural networks (RNN). The sensors are installed in a flow loop containing a thermal mixing tee, which is a common experimental model to study thermal fatigue in a thermal hydraulic loop. In addition, nonlinear transients generated in a thermal mixing tee constitute a good challenge data set for training and validation of ML algorithms. Sensors in this study include thermocouples, flow meters, and optical fibers for distributed temperature sensing. In one experiment, measurement data sets were obtained for a loop was filled with water, and in another experiment, measurements were performed on a loop filled with liquid metal Galinstan. We have also conducted preliminary investigation of one-step ahead prediction of fiber optics-based distributed temperature sensing with LSTM networks. In predicting fiber-based temperature measurements, we treated each gauge pitch of the fiber as an independent sensor. Accuracy of one-step ahead forecasting was estimated by calculating root mean square error (RMSE) for the test segment of time series of each sensor. RMSE’s for temperature sensors in water loop were, for the most part, lower than for the same sensors in Galinstan loop. The RMSE’s for flow meters were similar for both loops. The RMSE’s for distributed temperature measured with the fiber optic sensor were similar to those of the point sensors. Results of this study demonstrated the capability of LSTM one-step ahead forecasting with RMSE comparable to uncertainty in sensor measurements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Temperature and Dynamic Strain Measurements Using a Single SAWR Sensor

Dynamic strain sensing is relevant in numerous applications involving structural health monitoring, condition-based maintenance, operation efficiency preservation, and work environment safety. These sensors are particularly critical for high-temperature (HT) harsh-environment (HE) industries such as aerospace, automotive, power plants, and advanced manufacturing. In HT/HE, sensor implementation and measurement present challenges such as maintaining sensor stability, accounting for temperature cross-sensitivity, providing HT attachment, and packaging of the sensors and system. Surface acoustic wave resonator (SAWR) sensors can address these needs and offer additional benefits such as compact size and wireless interrogation capability. The SAWR sensitivity to dynamic strain is temperature dependent, making it necessary to measure the sensor temperature in order to use the correct dynamic strain calibration curve. In this work, a method for determining the temperature, dynamic strain magnitude, and dynamic strain spectral components using a single SAWR sensor is presented. Here, the established technique for determining operational temperature and dynamic strain magnitude/spectral components using only one SAWR simplifies the sensor measurement system, thus being very attractive for HT /HE applications.

47 OTHER INSTRUMENTATION↗

Generalized Reference Targeting for Spaceflight

For spaceflight programs to achieve some of the aggressive exploration initiatives such as visiting and landing on other celestial bodies, rendezvousing with other orbiting vehicles, and ultimately returning crew safely to Earth, an assortment of targeting algorithms to compute the necessary burns to strategically maneuver a spacecraft to a variety of destinations are required. Numerous examples exist, but rather than creating and implementing multiple targeting solutions, is it possible to have a general targeting model that can accommodate a variety of applications? Originally motivated for mission design and analysis purposes, this paper outlines a generalized reference targeting algorithm for spaceflight that may also have applications in on-orbit flight software. It accommodates arbitrary flight dynamics and both impulsive and finite burns for either absolute or relative targeting applications. It also allows for an arbitrary number of targeting design parameters such as multiple discrete correction burns or finite thrust parameters to satisfy numerous combinations of targeting constraints that can have fixed or variable time epochs. Given a reference trajectory, this targeting technique provides a general framework to quickly solve an assortment of targeting problems that may be well-defined, over-determined, or under-determined while naturally producing metrics providing insight into the controllability for a given problem formulation. Due to the derivation, speed, and accuracy of the algorithm, it lends to supporting rapid linear covariance analysis and robust trajectory design applications for a variety of flight phases such as rendezvous and docking, cislunar transfer, interplanetary flight, orbit maintenance, de-orbit, and powered descent and landing.

Targeting↗

Strategies for adding adaptive learning mechanisms to rule-based diagnostic expert systems

Rule-based diagnostic expert systems can be used to perform many of the diagnostic chores necessary in today's complex space systems. These expert systems typically take a set of symptoms as input and produce diagnostic advice as output. The primary objective of such expert systems is to provide accurate and comprehensive advice which can be used to help return the space system in question to nominal operation. The development and maintenance of diagnostic expert systems is time and labor intensive since the services of both knowledge engineer(s) and domain expert(s) are required. The use of adaptive learning mechanisms to increment evaluate and refine rules promises to reduce both time and labor costs associated with such systems. This paper describes the basic adaptive learning mechanisms of strengthening, weakening, generalization, discrimination, and discovery. Next basic strategies are discussed for adding these learning mechanisms to rule-based diagnostic expert systems. These strategies support the incremental evaluation and refinement of rules in the knowledge base by comparing the set of advice given by the expert system (A) with the correct diagnosis (C). Techniques are described for selecting those rules in the in the knowledge base which should participate in adaptive learning. The strategies presented may be used with a wide variety of learning algorithms. Further, these strategies are applicable to a large number of rule-based diagnostic expert systems. They may be used to provide either immediate or deferred updating of the knowledge base.

Stclair, D. C.↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2020)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment. 2) CAU 91, Area 3 U-3fi Injection Well. 3) CAU 92, Area 6 Decon Pond Facility. 4)CAU 110, Area 3 WMD U-3ax/bl Crater. 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits. 6) CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2020 (Rev. 2)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment; 2) CAU 91, Area 3 U-3fi Injection Well; 3) CAU 92, Area 6 Decon Pond Facility; 4) CAU 110, Area 3 WMD U-3ax/bl Crater; 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits; 6) CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110, the site fence, gate, lock, and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

The systematic evolution of a NASA software technology, Appendix C

A long range program is described whose ultimate purpose is to make possible the production of software in NASA within predictable schedule and budget constraints and with major characteristics such as size, run-time, and correctness predictable within reasonable tolerances. As part of the program a pilot NASA computer center will be chosen to apply software development and management techniques systematically and determine a set which is effective. The techniques will be developed by a Technology Group, which will guide the pilot project and be responsible for its success. The application of the technology will involve a sequence of NASA programming tasks graduated from simpler ones at first to complex systems in late phases of the project. The evaluation of the technology will be made by monitoring the operation of the software at the users' installations. In this way a coherent discipline for software design, production maintenance, and management will be evolved.

Deregt, M. P.↗