Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Size”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Design of a Microgravity Hybrid Inflatable Airlock

Spacewalks, or extra-vehicular activities (EVAs), are a critical component of human space exploration for science activities and habitat construction and maintenance. For NASA's proposed lunar Gateway system, an airlock module is required for vehicle maintenance, repair, and exploration. Traditional airlock structures are fully metallic, with two chambers, known as an equipment lock and a crew lock. The larger volume, called the equipment lock, serves as the storage, logistics and electronics area, while the smaller volume, called the crew lock, serves as the volume to transition from the vacuum of space to the pressurized cabin. A traditional metallic structure design offers mass efficiency for these elements, but cannot offer volume efficiency. The potential to use an inflatable fabric pressure shell supplemented by a metallic support structure allows for efficiency in both mass and volume. Inflatable structures are being used for human habitable space modules, starting with the Bigelow Expandable Activities Module on the International Space Station. They are high-strength fabric-based structures that are compactly stowed for launch and then, once in space, they are expanded and rigidized with internal pressure. They provide significant launch volume savings over metallic structures. For Gateway, a hybrid airlock design is proposed with both metallic and inflatable structural elements, taking advantage of each material's capabilities. A metallic equipment lock serves as both a docking node and provides pressurized volume for pre-EVA activities including pre-breathe and suit donning/doffing. A rigid equipment lock offers stowage space during launch for integrated hardware and suits. Adding an integrated inflatable crew lock provides the volume required for EVAs with minimal use of launch volume. Using dual inflatable crew locks provides redundancy and the capability to move large pieces of equipment into and out of the vehicle for repair and maintenance. The inflatable crew lock is deflated and packaged in the launch shroud and expanded after installation on the Gateway. This packing capability allows additional volume to be added to the equipment lock and fully utilize the capability of the launch vehicle. This report outlines the work completed to design, analyze, and test the systems of a microgravity airlock with inflatable crew locks. In detail, it includes launch vehicles, structural sizing of the metallic equipment lock, the fabric layers of the inflatable crew lock, the internal structure of the crew lock, the space suit interface elements, the crew restraint system, the hatches and pass-throughs, the material and thermal elements, and the crew operations for the usage of the system. This paper is meant to offer a reference design for a hybrid microgravity airlock design for deep space human exploration.

Litteken, Douglas↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

The Role and Training of NASA Astronauts in the Post-Shuttle Era

In May 2010 the National Research Council (NRC) was asked by NASA to address several questions related to the Astronaut Corps. The NRC's Committee on Human Spaceflight Crew Operations was tasked to: 1. How should the role and size of the activities managed by the Johnson Space Center Flight Crew Operations Directorate change following space shuttle retirement and completion of the assembly of the International Space Station (ISS)? 2. What are the requirements for crew-related ground-based facilities after the Space Shuttle program ends? 3. Is the fleet of aircraft used for training the Astronaut Corps a cost-effective means of preparing astronauts to meet the requirements of NASA's human spaceflight program? Are there more cost-effective means of meeting these training requirements? Although the future of NASA's human spaceflight program has garnered considerable discussion in recent years, and there is considerable uncertainty about what that program will involve in the coming years, the committee was not tasked to address whether or not human spaceflight should continue, or what form it should take. The committee's task restricted it to studying those activities managed by the Flight Crew Operations Directorate, or those closely related to its activities, such as crew-related ground-based facilities and the training aircraft.

Source record↗

Ongoing Development of a Series Bosch Reactor System

Future manned missions to deep space or planetary surfaces will undoubtedly require highly robust, efficient, and regenerable life support systems that require minimal consumables. To meet this requirement, NASA continues to explore a Bosch‐based carbon dioxide reduction system to recover oxygen from CO2. In order to improve the equivalent system mass of Bosch systems, we seek to design and test a "Series Bosch" system in which two reactors in series are optimized for the two steps of the reaction, as well as to explore the use of in situ materials as carbon deposition catalysts. Here we report recent developments in this effort including assembly and initial testing of a Reverse Water‐Gas Shift reactor (RWGSr) and initial testing of two gas separation membranes. The RWGSr was sized to reduce CO2 produced by a crew of four to carbon monoxide as the first stage in a Series Bosch system. The gas separation membranes, necessary to recycle unreacted hydrogen and CO2, were similarly sized. Additionally, we report results of preliminary experiments designed to determine the catalytic properties of Martian and Lunar regolith simulant for the carbon deposition step.

Abney, Morgan↗

Ongoing Development of a Series Bosch Reactor System

Future manned missions to deep space or planetary surfaces will undoubtedly incorporate highly robust, efficient, and regenerable life support systems that require minimal consumables. To meet this requirement, NASA continues to explore a Bosch-based carbon dioxide reduction system to recover oxygen from CO2. In order to improve the equivalent system mass of Bosch systems, we seek to design and test a "Series Bosch" system in which two reactors in series are optimized for the two steps of the reaction, as well as to explore the use of in situ materials as carbon deposition catalysts. Here we report recent developments in this effort including assembly and initial testing of a Reverse Water-Gas Shift reactor (RWGSr) and initial testing of two gas separation membranes. The RWGSr was sized to reduce CO2 produced by a crew of four to carbon monoxide as the first stage in a Series Bosch system. The gas separation membranes, necessary to recycle unreacted hydrogen and CO2, were similarly sized. Additionally, we report results of preliminary experiments designed to determine the catalytic properties of Martian regolith simulant for the carbon formation step.

Abney, Morgan B↗

Sensitivity of Hybrid NEP-Chemical Vehicle Mass to Assumptions for Crewed Opposition-Class Mars Missions

This research illustrates the impact of different technology choices and their associated performance on overall sizing for a hybrid Nuclear Electric Propulsion (NEP) and chemical crewed Mars transportation vehicle. A set of models for the trajectory and vehicle mass, power system specific mass(α), and power conversion performance enable the analysis. Vehicle mass required to close the mission is calculated as a function of α and specific impulse (Isp) for multiple choices of high-level assumptions including system alpha vs. power scaling and electric thruster type. System alpha is built up and compared for multiple cases of technology assumptions. A Brayton cycle model is used to illustrate the alpha sensitivities to assumptions in cycle design such as peak operating temperature and component performance. The analysis illustrates how technology performance sensitivities affect the alpha and thus vehicle sizing for a range of mission and technology assumptions.

Matthew Duchek↗

Functional Task Test: 3. Skeletal Muscle Performance Adaptations to Space Flight

The functional task test is a multi-disciplinary study investigating how space-flight induced changes to physiological systems impacts functional task performance. Impairment of neuromuscular function would be expected to negatively affect functional performance of crewmembers following exposure to microgravity. This presentation reports the results for muscle performance testing in crewmembers. Functional task performance will be presented in the abstract "Functional Task Test 1: sensory motor adaptations associated with postflight alternations in astronaut functional task performance." METHODS: Muscle performance measures were obtained in crewmembers before and after short-duration space flight aboard the Space Shuttle and long-duration International Space Station (ISS) missions. The battery of muscle performance tests included leg press and bench press measures of isometric force, isotonic power and total work. Knee extension was used for the measurement of central activation and maximal isometric force. Upper and lower body force steadiness control were measured on the bench press and knee extension machine, respectively. Tests were implemented 60 and 30 days before launch, on landing day (Shuttle crew only), and 6, 10 and 30 days after landing. Seven Space Shuttle crew and four ISS crew have completed the muscle performance testing to date. RESULTS: Preliminary results for Space Shuttle crew reveal significant reductions in the leg press performance metrics of maximal isometric force, power and total work on R+0 (p<0.05). Bench press total work was also significantly impaired, although maximal isometric force and power were not significantly affected. No changes were noted for measurements of central activation or force steadiness. Results for ISS crew were not analyzed due to the current small sample size. DISCUSSION: Significant reductions in lower body muscle performance metrics were observed in returning Shuttle crew and these adaptations are likely contributors to impaired functional tasks that are ambulatory in nature (See abstract Functional Task Test: 1). Interestingly, no significant changes in central activation capacity were detected. Therefore, impairments in muscle function in response to short-duration space flight are likely myocellular rather than neuromotor in nature.

Ryder, Jeffrey W.↗

Supersonic Retro-Propulsion for Future High-Mass Robotic Mars Lander Missions

A feasibility study was conducted to investigate the potential performance advantages of Supersonic Retro-Propulsion in support of future high-mass Mars robotic landing missions. A notional reference architecture for a potential future Mars Sample Return formed the basis for assuming a 4.7 m diameter SRP entry vehicle containing the Mars Ascent Vehicle element. Configuration analysis was conducted to ensure that the payload and required SRP components (including engines and propellant) fit within in the capsule volume. Optimized trajectory analysis highlighted several key performance sensitivities of SRP for ballistic coefficients of 150, 300, and 450 kg/m2. These results indicated a broad SRP ignition envelope (1-4 km altitude, 300-750 m/s velocity), as well as relatively small propellant mass fraction sensitivities to SRP thrust/weight, landing site elevation, and the application of a 4-g entry deceleration constraint (relevant for future crewed mission trajectories). Finally, mass-sizing was performed to assess sensitivities to ballistic coefficient and entry velocity, and showcased the ability of the SRP system to land payload masses on the order of twice that of MSL.

Whetsel, Charles↗

Crewed Mars Mission Mode Options for Nuclear Electric/Chemical Hybrid Transportation System

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. For crewed missions to Mars, the transportation system sizing is highly dependent on the total mission duration, Mars orbit dwell time, mission concept of operations, and the chosen propulsion system. NASA has been investigating the use of low-thrust electric propulsion systems to augment high-thrust chemical propulsion system for crewed Mars mission to enable a more energy-efficient operations. Recent studies on these missions have focused on ``All-Up'' piloted mission modes in which the in-space transportation system for crew transit departs Earth with everything it needs for the roundtrip journey, with only the Mars landers and surface assets pre-deployed. This design choice was made to minimize the mission operation risk, as the crew could return safely to Earth in the event of a failure to rendezvous or other failure of any pre-deployed assets. As the Mars Architecture Team continues to investigate and understand the Mars mission trade space, alternate mission mode studies were conducted to understand their impact to the transportation system. These include pre-positioning return assets and discarding expended stages to reduce the overall system mass.

Patrick R Chai↗

Evaluating the Performance of Hybrid Vehicles between LEO, Cislunar Space, and Mars

Nuclear power and electric propulsion technologies can enable a broad range of existing and future space mission concepts. This paper evaluates how these two technology classes, when combined into systems with various performance levels (and paired with a chemical propulsion system) affect vehicle sizing and mission feasibility for round-trip, opposition-class, crewed missions to Mars. The technology trade-space evaluated in this paper encompasses: various nuclear power system mass-efficiency levels (or power-specific mass), a range of output power levels available to the electric propulsion system, two electric propulsion thruster technologies (Hall and Magnetoplasmadynamic) at various characteristic specific impulse levels, and a range of propellant tank mass sizing coefficient. Each combination of the technologies is evaluated for the 2039 and the 2042 Mars mission opportunities for a range of imposed total mission duration constraints. The results show that synergies between technology performance levels exist and that increasing the performance of some parameters might have undesired consequences for the trajectory and vehicle. It was found that increasing the mass-efficiency of the nuclear power system is broadly beneficial, resulting in lower vehicle masses and enabling shorter mission durations. However, increasing the specific impulse of a thruster or increasing the available power level do not always yield a net benefit to the vehicle or mission; since increasing the specific impulse or power level (holding power system mass-efficiency constant) tends to decrease the vehicle thrust-to-mass ratio. Furthermore, the results show that mission feasibility is highly dependent on the mission duration; the required technology performance level to enable a mission is relaxed as the mission duration increases. Given the optimally sized vehicles resulting from the trade-space for a crewed mission to Mars, this paper also evaluates the impact of aggregating the Mars mission vehicle in Low-Earth Orbit and transferring it to the Mars mission departure node (using the on-board power and propulsion systems). The trade-space for this portion of the analysis includes the option of in-space vehicle refueling at the Mars mission departure node. The results show that on-orbit refueling can relax the required technology performance levels to achieve lower launch masses and orbit-raising durations at the cost of increased architecture complexity and risk.

Nuclear Electric Propulsion↗

Habitability Designs for Crew Exploration Vehicle

NASA's space human factors team is contributing to the habitability of the Crew Exploration Vehicle (CEV), which will take crews to low Earth orbit, and dock there with additional vehicles to go on to the moon's surface. They developed a task analysis for operations and for self-sustenance (sleeping, eating, hygiene), and estimated the volumes required for performing the various tasks and for the associated equipment, tools and supplies. Rough volumetric mockups were built for crew evaluations. Trade studies were performed to determine the size and location of windows. The habitability analysis also contributes to developing concepts of operations by identifying constraints on crew time. Recently completed studies provided stowage concepts, tools for assessing lighting constraints, and approaches to medical procedure development compatible with the tight space and absence of gravity. New work will be initiated to analyze design concepts and verify that equipment and layouts do meet requirements.

Woolford, Barbara↗

Human Mars Mission In-Space Transportation Sensitivity for Nuclear Electric / Chemical Hybrid Propulsion

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. In this study, an update to the Hybrid propulsion system was established with the introduction of nuclear electric propulsion system to replace the solar electric propulsion system in an effort to understand the potential impact of a shorter mission to Mars. For crewed missions to Mars, the transportation system sizing is highly dependent on the type of mission and the mission duration. An integrated trajectory analysis capability has been developed and updated to enable this investigation. Longer duration mission may utilize higher efficiency low thrust propulsion system more, but would require higher payload mass due to increase to crew logistics loading and habitation volume. Conversely, shorter duration mission may have lower payload mass, but will require significant increase to propulsion system performance and/or overall system mass. An overall integrated design trade space is defined in this paper to investigate the tradeoff between these scenarios to illuminate the optimality of the transportation system option from a mass perspective. The sensitivity analysis developed in this study will be crucial to understanding the Mars mission design trade space for crewed Mars missions, and will help inform design decisions and investment strategies.

Patrick R. Chai↗

Preparing for the High Frontier: The Role and Training of NASA Astronauts in the Post- Space Shuttle Era

In May 2010, the National Research Council (NRC) was asked by NASA to address several questions related to the Astronaut Corps. The NRC s Committee on Human Spaceflight Crew Operations was tasked to answer several questions: 1. How should the role and size of the activities managed by the Johnson Space Center Flight Crew Operations Directorate change after space shuttle retirement and completion of the assembly of the International Space Station (ISS)? 2. What are the requirements for crew-related ground-based facilities after the Space Shuttle program ends? 3. Is the fleet of aircraft used for training the Astronaut Corps a cost-effective means of preparing astronauts to meet the requirements of NASA s human spaceflight program? Are there more cost-effective means of meeting these training requirements? Although the future of NASA s human spaceflight program has garnered considerable discussion in recent years and there is considerable uncertainty about what the program will involve in the coming years, the committee was not tasked to address whether human spaceflight should continue or what form it should take. The committee s task restricted it to studying activities managed by the Flight Crew Operations Directorate or those closely related to its activities, such as crew-related ground-based facilities and the training aircraft.

Source record↗

Determination of Survivable Fires

At NASA, there exists no standardized design or testing protocol for spacecraft fire suppression systems (either handheld or total flooding designs). An extinguisher's efficacy in safely suppressing any reasonable or conceivable fire is the primary benchmark. That concept, however, leads to the question of what a reasonable or conceivable fire is. While there exists the temptation to over-size' the fire extinguisher, weight and volume considerations on spacecraft will always (justifiably) push for the minimum size extinguisher required. This paper attempts to address the question of extinguisher size by examining how large a fire a crew member could successfully survive and extinguish in the confines of a spacecraft. The hazards to the crew and equipment during an accidental fire include excessive pressure rise resulting in a catastrophic rupture of the vehicle skin, excessive temperatures that burn or incapacitate the crew (due to hyperthermia), carbon dioxide build-up or other accumulation of other combustion products (e.g. carbon monoxide). Estimates of these quantities are determined as a function of fire size and mass of material burned. This then becomes the basis for determining the maximum size of a target fire for future fire extinguisher testing.

Dietrich, D. L.↗

Utilization of common pressurized modules on the Space Station Freedom

During the preliminary design review of Space Station Freedom elements and subsystems, it was shown that reductions of cost, weight, and on-orbit integration and verification would be necessary in order to meet program constraints, particularly nominal Orbiter payload launch capability. At that time, the Baseline station consisted of four resource nodes and two 44 ft modules. In this study, the viability of a common module which maintains crew and payload accommodation is assessed. The size, transportation, and orientation of modules and the accommodation of system racks and user experiments are considered and compared to baseline. Based on available weight estimates, a module pattern consisting of six 28 ft. common elements with three radial and two end ports is shown to be nearly optimal. Advantageous characteristics include a reduction in assembly flights, dual egress from all elements, logical functional allocation, no adverse impacts to international partners, favorable airlock, cupola, ACRV (Assured Crew Return Vehicle), and logistics module accommodation, and desirable flight attitude and control characteristics.

Gould, Marston J.↗

Utilization of common pressurized modules on the Space Station Freedom

During the preliminary design review of Space Station Freedom elements and subsystems, it was shown that reductions of cost, weight, and on-orbit integration and verification would be necessary in order to meet program constraints, particularly nominal Orbiter payload launch capability. At that time, the Baseline station consisted of four resource nodes and two 44 ft modules. In this study, the viability of a common module which maintains crew and payload accommodation is assessed. The size, transportation, and orientation of modules and the accommodation of system racks and user experiments are considered and compared to baseline. Based on available weight estimates, a module pattern consisting of six 28 ft common elements with three radial and two end ports is shown to be nearly optimal. Advantageous characteristics include a reduction in assembly flights, dual egress from all elements, logical functional allocation, no adverse impacts to international partners, favorable airlock, cupola, ACRV (Assured Crew Return Vehicle), and logistics module accommodation, and desirable flight attitude and control characteristics.

Mazanek, Daniel D.↗

A Data-Based Console Logger for Mission Operations Team Coordination

Concepts and prototypes1,2 are discussed for a data-based console logger (D-Logger) to meet new challenges for coordination among flight controllers arising from new exploration mission concepts. The challenges include communication delays, increased crew autonomy, multiple concurrent missions, reduced-size flight support teams that include multidisciplinary flight controllers during quiescent periods, and migrating some flight support activities to flight controller offices. A spiral development approach has been adopted, making simple, but useful functions available early and adding more extensive support later. Evaluations have guided the development of the D-Logger from the beginning and continue to provide valuable user influence about upcoming requirements. D-Logger is part of a suite of tools designed to support future operations personnel and crew. While these tools can be used independently, when used together, they provide yet another level of support by interacting with one another. Recommendations are offered for the development of similar projects.

Thronesbery, Carroll↗

Freeing Water from Viruses and Bacteria

Four years ago, Argonide Corporation, a company focused on the research, production, and marketing of specialty nano materials, was seeking to develop applications for its NanoCeram[R] fibers. Only 2 nanometers in diameter, these nano aluminum oxide fibers possessed unusual bio-adhesive properties. When formulated into a filter material, the electropositive fibers attracted and retained electro-negative particles such as bacteria and viruses in water-based solutions. This technology caught the interest of NASA as a possible solution for improved water filtration in space cabins. NASA's Johnson Space Center awarded Sanford, Florida-based Argonide a Phase I Small Business Innovation Research (SBIR) contract to determine the feasibility of using the company's filter for purifying recycled space cabin water. Since viruses and bacteria can be carried aboard space cabins by space crews, the ability to detect and remove these harmful substances is a concern for NASA. The Space Agency also desired an improved filter to polish the effluent from condensed and waste water, producing potable drinking water. During its Phase I partnership with NASA, Argonide developed a laboratory-size filter capable of removing greater than 99.9999 percent of bacteria and viruses from water at flow rates more than 200 times faster than virus-rated membranes that remove particles by sieving. Since the new filter s pore size is rather large compared to other membranes, it is also less susceptible to clogging by small particles. In September 2002, Argonide began a Phase II SBIR project with Johnson to develop a full-size cartridge capable of serving a full space crew. This effort, which is still ongoing, enabled the company to demonstrate that its filter media is an efficient absorbent for DNA and RNA.

Source record↗