Space programs summary no. 37-64, volume 2 for the period 1 June to 31 July 1970. The Deep Space Network
Mariner Mars 1971 mission support, engineering, and design of Deep Space Network
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Mariner Mars 1971 mission support, engineering, and design of Deep Space Network
The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide an additional delta- V of approximately 11 km/s for the heliocentric transfers to each body and for all orbit transfers including orbit capture/escape and transition to the various science orbits. Deterministic thrusting to Vesta began in December 2007 and concluded with orbit capture at Vesta in July 2011. The transfer to Vesta included a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s and was the only postlaunch mission delta-V not provided by IPS. During the mission at Vesta the IPS was used for all orbit transfers which included six different near-polar science mapping orbits. Thrusting for departure from Vesta and the start of cruise to Ceres began on July 25, 2012 with escape from Vesta occurring on September 5, 2012. To date the IPS has been operated for approximately 31,000 hours, consumed approximately 300 kg of xenon, and provided a delta-V of approximately 8.3 km/s. IPS performance characteristics are very close to the expected performance based on analysis and testing performed prelaunch. Thrusting for cruise to Ceres will continue until the spring of 2015, with a planned arrival date at Ceres in April 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations from Vesta departure through the first year of cruise to Ceres.
The Primary Mission for Deep Space (DS1) was to demonstrate 12 new technologies one of which was the Ion Propulsion System (IPS). After successfully completing its primary mission, DS1 was given a new mission. The objective of this Extended Mission was to fly by the Comet Borrelly. After the successful Borrelly encounter, the ion thruster on DS1 had to be operated for more than 14,000 hours in space. This provided a unique opportunity to investigate the condition of the thruster after long-term operation in space and determine, to the extent possible, if the thruster wear in space is consistent with that observed in long-duration ground tests.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This paper describes the different electro static and electro magnetic emissions of the ion engine for each of the the thrust levels the engine has operated in space and in the test chamber.
Explore the source record for details and available documents.
This paper discusses the results of a 1000-hour wear test intended to determine the erosion resistance and voltage standoff capability of the optics in a relevant environment, i.e. duration testing on an NSTAR-like thruster.
A viewgraph presentation to demonstrate collaborative scheduling using Java Message Service (JMS) in a mixed Java and .Net environment is given. The topics include: 1) NASA Deep Space Network scheduling; 2) Collaborative scheduling concept; 3) Distributed computing environment; 4) Platform concerns in a distributed environment; 5) Messaging and data synchronization; and 6) The prototype.
Solar Electric Propulsion (SEP) trajectories are shown for Mars missions between late 2004 and 2011.
For interplanetary missions, highly efficient electric propulsion systems can be used to increase the mass delivered to the destination and/or reduce the trip time over typical chemical propulsion systems.
In October, 1998, the first of the NASA New Millenium Spacecraft, DS1, was successfully launched into space. The objectives for this spacecraft are to test advanced technologies that can reduce the cost or risk of the future missions.