NREL and DONG Energy Collaboration for Grid Simulator Controls and Testing: Cooperative Research and Development Final Report, CRADA Number CRD-13-527

The National Renewable Energy Laboratory (NREL) and DONG Energy are interested in collaborating for the development of control algorithms, modeling, and grid simulator testing of wind turbine generator systems involving NWTC's advanced Controllable Grid Interface (CGI). NREL and DONG Energy will work together to develop control algorithms, models, test methods, and protocols involving NREL's CGI, as well as appropriate data acquisition systems for grid simulation testing. The CRADA also includes work on joint publication of results achieved from modeling and testing efforts. Further, DONG Energy will send staff to NREL on a long-term basis for collaborative work including modeling and testing. NREL will send staff to DONG Energy on a short-term basis to visit wind power sites and participate in meetings relevant to this collaborative effort. DOE has provided NREL with over 10 years of support in developing custom facilities and capabilities to enable testing of full-scale integrated wind turbine drivetrain systems in accordance with the needs of the US wind industry. NREL currently operates a 2.5MW dynamometer and is in the processes of commissioning a 5MW dynamometer and a grid simulator (referred to as a 'Controllable Grid Interface' or CGI). DONG Energy is the market leader in offshore wind power development, with currently over 1 GW of on- and offshore wind power in operation, and 1.3 GW under construction. DONG Energy has on-going R&D projects involving high voltage DC (HVDC) transmission.

17 WIND ENERGY↗

EV Charging Infrastructure Roadmap

As highlighted in the U.S. Department of Energy’s EV Everywhere Grand Challenge, vehicle technology is advancing toward an objective to “… produce plug-in electric vehicles that are as affordable and convenient for the average American family as today’s gasoline-powered vehicles …” [1] by developing more efficient drivetrains, greater battery energy storage per dollar, and lighter-weight vehicle components and construction. With this technology advancement and improved vehicle performance, the objective for charging infrastructure is to promote vehicle adoption and maximize the number of electric miles driven. The EV Everywhere Charging Infrastructure Roadmap (hereafter referred to as Roadmap) looks forward and assumes that the technical challenges and vehicle performance improvements set forth in the EV Everywhere Grand Challenge will be met. The Roadmap identifies and prioritizes deployment of charging infrastructure in support of this charging infrastructure objective for the EV Everywhere Grand Challenge

33 ADVANCED PROPULSION SYSTEMS↗

Hybrid Multi-Material Endoskeleton Overmolded Structure for Automotive Powertrain

Oak Ridge National Laboratory’s (ORNL) Manufacturing Demonstration Facility (MDF) worked with American Axle and Manufacturing (AAM) to demonstrate additive manufacturing’s (AM) applicability to multi-material endoskeleton driveline mechanisms. The goal of this phase one technical collaboration project was to significantly reduce mass, improve efficiency, and improve power torque density of the driveline mechanism through applied research analysis of a multi-material solution. The focus of the effort explored the impact of multi-material endoskeleton components on reducing the weight of a typical drivetrain component using a blend of metal additive manufacturing with overmolding. For this study, a conventional rear driveline power transfer unit housing was selected. The component was geometrically optimized for additive manufacturing and to ensure proper lubrication of the gears. Therefore, traditional weight reduction techniques were invalid because AM enables weight reduction far beyond what is capable with traditional manufacturing. The hypothesis was that an inner aluminum structure could be optimized with respect to strength and weight reduction. An outer composite surface was overmolded to the aluminum AM part to satisfy the part’s geometric constraints and to provide embodiment for oil encapsulation. The original component weighed 11.3 lb whereas the topologically optimized structure was 6.96 lbs, which is a 4.34 lb difference. When the missing aluminum material was replaced with a composite material, the part weighed approximately 8.66 lbs resulting in a 2.64 lb or 23% weight reduction from the traditionally manufactured part. These first phase efforts are deemed a success. A proposed second phase will explore the material and design requirements necessary to ensure a viable mechanical interface between the AM component and overmolding.

36 MATERIALS SCIENCE↗

Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

The objective of this project was to develop, demonstrate, and evaluate commercialization of a highly efficient downsized engine by electrification of the air delivery and waste heat recovery system and optimizing energy usage to achieve significant fuel economy improvement at a commercially viable cost. The system consists of an Electrically Assisted Variable speed Supercharger (EAVS), driven by an electric motor and the engine through a planetary gear train, that provides engine boost pressure and provides the mild hybrid functions of engine start/stop, torque assist, and brake energy recovery. In the exhaust path of the engine is the electric Waste Heat Recovery (eWHR) system, a roots-based expander driven by another electric motor, that enables exhaust gas energy recovery along with controlled back pressure on the engine. The two electric motors are powered by a 48V rechargeable lithium-ion battery. Further, the EAVS system coupled to an EGR valve enables very precise high exhaust recirculation rates to control the NOx emissions. Through two budget periods, the project team of Eaton, Isuzu, Southwest Research Institute and AVL designed and developed the EAVS and eWHR systems, integrated with an Isuzu diesel engine, and validated the target fuel economy performance and emissions by engine dynamometer testing and vehicle level simulations. GT Power model-based analyses results were used to size the EAVS and eWHR systems for the 1.9L Isuzu Spark engine. The two systems were built and the functional testing was carried out to verify the boosting performance of the superchargers. Following the baseline engine dynamometer testing, the two systems were integrated with the engine and the fuel economy performance and emissions were determined by combined steady state and transient testing over three drive cycles, namely, FTP75, NEDC and HWFET. The EAVS/eWHR system demonstrated 4% improvement in fuel economy for the NEDC cycle in engine dyno testing, correlating well with vehicle simulation results (5.3%). The simulation results indicated that the combination of hybrid functions and drivetrain optimization, fuel economy improvement of more than 20% was feasible with the system. The commercialization study to evaluate the cost of the system and the scalability for different engine/vehicle classes was planned for the final budget period but not completed as the project was closed at the end of budget period two.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Uptower Investigation of Main and High-Speed-Shaft Bearing Reliability

This purpose of this report is to summarize the investigation of the operational conditions conducive to premature main bearing wear and gearbox bearing axial cracking failures in wind turbines. The report fully describes the series of operations conducted and measurements gathered from commissioning of the instrumented drivetrain in January 2017 through the end of the wind season in May 2018.

17 WIND ENERGY↗

WGRID-49 GMLC Project Report: Understanding the Role of Short-Term Energy Storage and Large Motor Loads for Active Power Controls by Wind Power

The GMLC project is built upon the results of pioneering research funded by the U.S. Department of Energy (DOE) and conducted by the National Renewable Energy Laboratory (NREL)—in collaboration with the Electric Power Research Institute and the University of Colorado—on active power controls (APC) by wind power during 2013–2016. The studies detailed in the first APC by wind power project have shown tremendous promise for the potential for wind power plants to provide APC. The goal of this project was to continue the previous work and develop and validate coordinated controls of APC by wind generation, short-term energy storage, and large industrial motor drives for providing various types of ancillary services to the grid and minimizing loading impacts on wind turbines (e.g., drivetrains), thereby reducing operation-and-maintenance (O&M) costs and subsequently reducing the cost of energy generated by wind power. This work used the $30 million, multiyear DOE investments and the unique characteristics of NREL’s existing National Wind Technology Center test site, including a combination of multimegawatt utility-scale wind turbine generators, a 1-MW/1-MWh battery energy storage system (BESS), industrial variable-frequency motor drives, a 1-MW solar photovoltaic (PV) array, and a 7-MVA controllable grid interface. This combination of technologies allows for the optimization, testing, and demonstration of various types of APC by wind power in coordination with other generation sources (including regenerative loads) and energy storage to allow for enhancing or, in some cases, substituting the APC services by wind power and reducing impacts on wind turbine component life and thus increasing the availability and reliability of the power supply from wind

17 WIND ENERGY↗

US Hybrid Northeast Demonstration and Deployment of FCRxNV200 (DE-EE0007276 Final Report)

In this project, US Hybrid and other strategic project partners, collaborated to build a fuel cell range extended plug-in hybrid utility vehicle and demonstrate it in real-world operation. The base vehicle platform to be modified to the hybrid platform was the Nissan e-NV200, which is an all-electric version of the NV200 commercial cargo van. This is a Class 1 vehicle with a GVWR of approx. 4,900 lbs., wheelbase of 115 inches, and cargo capacity of approx. 122ft. The 80kW/254N-m electric powertrain is the same as Nissan’s LEAF, but with a revised final drive ratio (9.301 vs. 8.194) to accommodate higher payloads with lower top speed. US Hybrid utilized a purpose built, freeze capable, integrated fuel cell engine FCe™10 to hybridize and range-extend the existing e-NV200 vehicle with OEM drivetrain. The eNV200 has the same size battery as the LEAF with a different rear axle ratio. Fuel cell stack size and balance of plant (BOP) configuration were designed for compact under the hood vehicle packaging. Engine design took into consideration the need for high efficiency (>50% at all loads & up to 62% at partial power), optimal heat recovery for cabin heating, and low maintenance. The technology of the isolated DC-DC converter operating at >100kHz enables extremely high efficiency (ZVS and SIC power devices) and robust performance while reducing system complexity, weight, and volume. This enables an extended vehicle range of up to 250 miles and an operational life that should provide lower total cost of ownership (TCO) to the end user.

33 ADVANCED PROPULSION SYSTEMS↗

Integrated friction reduction technology to improve fuel economy without sacrificing durability

This project aims to develop fuel economy technologies to minimize parasitic losses within vehicle engines and drivetrains by improving fuel economy at least 2% for 2014 legacy vehicles and 2018 vehicles without adverse impacts on engine durability. The tools used are advanced low viscosity lubricants and surface material technologies, including surface textures, and coatings. Working with industrial partners, an experimental fuel efficient low viscosity lubricant was developed, verified by ASTM fuel economy engine test for 2014 vehicle population. An ultralow viscosity lubricant was also developed for 2018 engines, demonstrated by engine chassis dynamometer tests. Surface texturing of engine components was also conducted, and in engine testing, confirmed the textured engine developed more torque and power while the textures largely stayed intact after the test.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Medium- and Heavy-Duty Vehicle Electrification: An Assessment of Technology and Knowledge Gaps

The objective of this assessment was to leverage current medium- and heavy-duty vehicle (MHDV) data and information to evaluate the state of commercial vehicle electrification technologies, including the following: 1. Assessment and inventory of current MHDV electrification architectures; 2. Identification and assessment of MHDV component technologies; 3. Assessment of potential performance and cost drivers; and, 4. Identification of R&D gaps where appropriate R&D and technology would accelerate commercial vehicle electrification. These gaps include shortfalls in technology, gaps in data, and inadequate knowledge and understanding. To inform this study, the National Renewable Energy Laboratory–Oak Ridge National Laboratory team examined the open literature; conducted workshops; assessed and analyzed data on more than 175 electrified MHDVs, including vehicle and powertrain specifications; and conducted one-on-one meetings with industry representatives. This systems-level information was concatenated and parsed with respect to key characteristics such as battery energy, power, and range compared across vehicle classes. Operational data of many conventional vehicles were also examined to help determine the requirements on electrified vehicle attributes such as range. Previous studies on the total cost of ownership of electrified MHDVs were reviewed to determine where improvements in technologies (efficiency, cost, maintenance) were needed to accelerate adoption. The team also assessed the state of the art in electric drivetrains for component specifications and challenges for the commercial vehicle sector, including electric machines, power electronics, and off-board high-power charging systems (extreme fast charging and beyond). The goal of this analysis was to identify the barriers to widespread adoption of commercial vehicle electrification technologies and prioritize the research and development gaps that need to be overcome to accelerate significant market penetration of these technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Used Plug-in Electric Vehicles as a Means of Transportation Equity in Low-Income Households

This report examines improving the equity of low-income households through access to reliable means of transportation. Used plug-in electric vehicles (PEVs) can serve as a low-cost and low-maintenance means of transport for low-income households. Zero tail-pipe emissions from PEVs is also a benefit of these drivetrain compared to internal combustion engine vehicles (ICEVs). Barriers to the adoption of the used PEVs, and incentives that may address these barriers were reviewed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

WhiteWind: White Etching Crack (WEC) Bearing Failures in Wind Turbine: Cooperative Research and Development, CRADA Number CRD-18-00758 (Final Report)

A WEC is a particularly aggressive, unpredictable and wide spread rolling element bearing failure mode that is common for large multi-megawatt (MW) wind turbines. WEC is considered the single most expensive failure mode for all wind turbine components, and there is currently no commercial solution. The Technical University of Denmark (DTU) is leading the WhiteWind project to investigate WECs through funding provided by the Innovation Fund Denmark. Other project partners include Vestas, SKF, Expanite, Rheinisch-Westfalische Technische Hochschule Aachen University (RWTH Aachen), and Argonne National Laboratory. The objective of the overall project is to develop a new surface engineered WEC-resistant bearing material using novel surface engineering techniques that shall provide a commercially competitive alternative to existing wind turbine bearings. NREL will support the project by providing existing measured bearing loads and validating models of drivetrain loads.

17 WIND ENERGY↗

Up-Tower Investigation of Main Bearing Cage Slip and Loads

This paper described the operational conditions of an SRB in the main bearing position of a three-point mount wind turbine drivetrain. A commercial wind turbine was instrumented to measure load characteristics on the outer ring of the bearing, which were used to examine the roller load characteristics qualitatively and the cage slip quantitatively in a range of operational states. Further, a simple analytic model estimated the bearing loads and was used as input conditions to a three-dimensional finite element model. The finite element roller load results were compared to the measurements and contact stresses were also described.

17 WIND ENERGY↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Acoustic Emission Measurement of a Wind Turbine Main Bearing

This report described acoustic emissions and temperature characteristics of a commercial main bearing in a wind turbine drivetrain. These characteristics were measured on the outer ring of the bearing by SKF DVST nodes, which are mounted on both upwind and downwind rows of the main bearing at four equally spaced circumferential locations. The measurement started in early 2018 and ends in 2020 and five-month data in 2018 winter was analyzed in this study.

17 WIND ENERGY↗

An Operations and Maintenance Roadmap for U.S. Offshore Wind: Enabling a Cost-Effective and Sustainable U.S. Offshore Wind Energy Industry Through Innovative Operations and Maintenance

The United States is currently targeting 30GW of offshore wind to be installed by 2030, and 150GW by 2050. Even considering future turbine sizes, this represents thousands of new turbines installed in a diverse set of environments, each with their unique design, installation, and maintenance challenges. While much can be learned from European and Asian experience with offshore wind over the past two decades, it is important to understand the unique circumstances of the U.S. This document explores operations and maintenance of offshore wind energy, specific to the U.S. and attempts to lay out a roadmap for needed activities to ensure reliability of future installations. The roadmap was informed through dozens of interviews with a wide cross-section of the industry, including representatives from OEMs, owner/operators, service companies, certification agencies, service providers, and researchers. The roadmap first describes the problem by component - blades, drivetrain and nacelle, structures and foundations, and electrical systems - through a look at current practices and opportunities for improvement in the areas of Failure Mode Analysis and Mitigation; Monitoring, Sensing, and Inspection; and Maintenance Execution. Crosscutting areas of Digitalization, Robotics and Automation, Prognostics and Health Management and O&M Optimization, Experimentation and Demonstration, Standardization, and Design Optimization Considering Reliability and O&M are then discussed. Finally, the roadmap summarizes all of these topics with recommendations for short (1-3 years), medium (4-7 years), and long term (8-12 years) activities, with a description of needed public and private sector contributions.

17 WIND ENERGY↗

PV Inverter Systems Enabled by Monolithically Integrated SiC based Four Quadrant Power Switch (4-QPS) [BiDFET]

The purpose of this project was to develop a new breed of Power Conversion Systems (PCS) for PV integration that is enabled by the newly developed 4-Quadrant Single Die SiC Power Semiconductor Switches (4-QPS) or also referred to as “Bidirectional FET (BIDFET)”. This work includes semiconductor die development, advanced packaging, converter design, development, and testing of 4-QPS enabled hardware prototypes at 1 kW (for single phase residential application) and 10 kW (for three phase commercial application). The BiDirectional Field-Effect Transistor (BiDFET) can enable circuit topologies requiring four-quadrant switches, that were earlier designed using discrete combinations of MOSFETs, IGBTs, GaN HEMTs, and PiN diodes. The monolithic nature of the BiDFET allows lower device count, smaller switch volume, lower inductance, and simpler packaging, and hence more reliable and commercially viable implementation in power electronics converters. The matrix converter topologies, now feasible using BiDFETs, can eliminate the bulky and unreliable dc link capacitors or inductors required for conventional voltage-source or current-source converters in ac–ac and ac–dc applications. The 1.2 kV BiDFET has the potential to disrupt all the applications utilizing 1.2 kV switches, including electric vehicle (EV) drivetrain, bidirectional EV chargers, industrial motor drives, solid-state transformers, datacenter power supplies, elevator drives, dc microgrids, energy storage grid integration, solid-state breakers, etc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARCUS Vertical-Axis Wind Turbine (Final Scientific/Technical Report)

While land-based wind energy has become economically competitive with traditional energy generation sources in the U.S., offshore wind is not. For floating offshore wind this difference is even more substantial where the levelized cost of energy (LCOE) is projected to be around 3-5 times more expensive than land-based wind. The turbine capital costs represent around 50% of the LCOE for land-based wind sites, but the increased system costs for floating offshore wind reduce this to 20%. The platform and mooring costs are the single largest contributor to the LCOE for floating offshore wind where their mass must counteract the overturning moment caused by the turbine’s thrust force. Despite the high costs of the platform and relatively low cost of the turbine, current offshore wind turbines are designed essentially the same as for land-based sites. Reducing the LCOE is the greatest challenge to realize the benefits of sustained development of floating offshore wind in the U.S. Reducing the complicated system costs of floating offshore wind will enable the industry to continue to grow and outpace current projections if reduced cost curves can be reached. The ideal wind energy system would remove all mass and cost that is not directly capturing energy from the wind. For floating offshore wind energy systems, this objective is even more significant as increased mass above the water level must be supported by larger and more expensive floating platforms. For this reason, vertical-axis wind turbines (VAWTs) are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWTs) at this scale. Large VAWTs offer opportunities for improved energy capture over HAWTs as single units and with reduced wind plant aerodynamic losses through enhanced wake recovery. Additionally, the platform-level placement of the VAWT drivetrain greatly reduces the demands placed on the floating platform and its mass and cost. The ARCUS vertical-axis wind turbine concept (U.S. 11,421,650 B2) is an iteration beyond traditional Darrieus-type VAWTs that replaces the rigid tower with blades that are bent into shape and held in place with tensioned center supports, like a bow. The ARCUS design has been shown to further decrease the VAWT rotor mass properties, with a 50% reduction over traditional Darrieus VAWTs quantified in the ATLANTIS program. The ARCUS VAWT’s efficient use of material for the rotor and turbine support structures combined with its lowered center of gravity enables a tension-leg platform (TLP) with simplified installation procedures. TLPs have been an emerging platform architecture in the Oil and Gas industry and demonstrated to have the lowest hull mass requirements while maintaining stability with minimal roll and pitch deflections in operation. A 22 MW ARCUS turbine has been designed with a three-column TLP that enables quayside integration of the turbine while maintaining system stability during tow-out and installation and having optimal mass and cost properties. A comprehensive analysis shows the optimal ARCUS TLP system design minimizes LCOE through efficient material usage and increased energy capture to yield a competitive LCOE estimate of $\$$55/MWh. A comparison with a reference HAWT, having the same swept area, quantifies the advantages that helped to produce this improved LCOE for the ARCUS concept: (1) 30% reduction in total turbine mass, (2) 70% reduction in turbine center of gravity, and (3) 45% increase in energy production over what is optimal for a HAWT. Intellectual property has been generated through the ATLANTIS program providing opportunities to further reduce the LCOE and improve the performance of the ARCUS turbine and TLP system, expanding the list of innovations to support commercial development of the ARCUS concept.

17 WIND ENERGY↗

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER↗