Search NASA⌕ Search

SEARCH · Search NASA

Results for “Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Towards standardized nuclear reactors: Seismic isolation and the cost impact of the earthquake load case

We report nuclear energy has a key role to play in global decarbonization. Impediments to the widespread deployment of reactors are their projected high capital cost and levelized cost of energy, and time required to analyze, design, license, construct, and commission them. The earthquake load case is a key cost driver for a new build nuclear plant, because near-surface soils and seismic hazard are different at each site, requiring site-specific analysis, design, engineering, qualification, licensing, and regulatory review, essentially making every design First-of-a-Kind (FoaK). To enable deployment at the scale needed for deep decarbonization, the cost and time impact of the seismic load case must be significantly mitigated, and plants must be standardized. Seismic base isolation has been proven to considerably reduce the earthquake response of structures and equipment but has yet to be applied to a nuclear power plant in the United States, in part because the financial impacts, positive or negative, are not known. Because there are no recent non-proprietary data to characterize the influence of the seismic load case on capital cost, it is difficult to confidently quantify the financial benefits of seismic isolation. Scheme-level designs of two fundamentally different advanced reactor buildings were developed to assemble cost data on the influence of the seismic load case. Both buildings were equipped with three bespoke pieces of safety-related equipment and analyzed for incremented levels of earthquake shaking to quantify the seismic penalty on equipment, in terms of vessel weights and horizontal accelerations. Using analysis results, a questionnaire was developed and transmitted to nuclear utilities, reactor developers, engineers, and equipment suppliers to collect cost data on engineering and fabrication costs for these unique pieces of safety-class equipment. Synthesis of the cost data showed that the seismic load case significantly affects the capital cost (sum of engineering and fabrication cost) of safety-class equipment, with engineering costs being comparable to fabrication costs. Standardization of safety-class equipment is made possible by seismic isolation, that is, equipment designed for minimal seismic robustness can resist earthquake shaking at a site of much higher seismic hazard. The average reduction in the capital cost of the safety-related equipment, enabled by seismic isolation, is a factor of two for FoaK equipment and a factor of five for standardized equipment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Radiological Recovery Logistics Tool - 20161

Argonne is building and testing a tool, the Radiological Recovery Logistics Tool (RRLT), that can be used during the response and recovery from a radiological or nuclear incident to effectively allocate appropriate commercial and public works equipment to mitigate, remove, and contain radiological contamination. The requirements for this tool - as well as development of the resulting software - is overseen by a steering committee of stakeholders from DHS's National Urban Security Technology Laboratory (NUSTL), the Federal Emergency Management Agency (FEMA), and the Environmental Protection Agency (EPA). One essential requirement is for RRLT to support the efficient and appropriate allocation of resources for a radiological response. Subsequent discussions between ANL and stakeholders have solidified the nature of this support to include identification of the types of resources to be allocated. The study reported in this paper has both factored fundamental concepts and connections out of this identification process and created a Knowledge Base detailing support goals, response scenarios, and efficacy information on dozens of equipment types. In short, RRLT will dynamically apply these findings to situational conditions surrounding contamination incidents. RRLT's Domain, the model of elements, ideas and relationships with which the tool will work, draws concepts from technical reports and stakeholder vocabularies to connect response goals and scenarios to types of equipment that offer utility towards those goals in those scenarios. RRLT's Knowledge Base will contain details on dozens of equipment types and facilitate the operator's discovery and consumption of these details most pertinent to a dynamically selected subset of goals. The core of its Domain Model is based on a report authored by this team. This report [1] contains a comprehensive list of proposed equipment to accomplish various missions or scenarios that might arise after a large-scale radiological contamination incident in an urban environment or critical infrastructure. The report divides potential response and recovery efforts into five support goals: Survey and monitoring of the contaminated area; Mitigation of received dose to first responders: Decontamination (gross and final) of buildings, vehicles, roadways, parks, and other surfaces: Waste management of solid waste generated during recovery operations: and Containment of wastewater and other waste generated during the response and recovery phases. RRLT's development is driven by use cases. A use case is an intention with which a user approaches the software. Use cases are grouped into delivery increments to schedule development, testing, and presentation to stakeholders. This model partitions the system into seven increments: User Arrival and Authentication, Search and Navigation, Equipment Recommendation, Plan Management, Content Management, and Expanded Access. Once a user 15 authenticated, RRLT will present the user with a dashboard that allows them to explore or search RRLT's content. The dashboard will also include a 'Plan' panel for collecting decisions and relevant observations about an incident at hand to facilitate development of an equipment list. RRLT will offer three general modes of access to items in the knowledge base: - Keyword search for direct discovery of items, - Navigation along predetermined paths from recovery goal towards equipment types, and - Interactive guidance towards equipment types by an autonomous software agent: the Equipment Recommendation Wizard. This presentation will detail progress in the development of the RRLT and also discuss opportunities for those interested in providing feedback on its content and functionality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogen Infrastructure Analysis for the Port Applications [Slides]

The International Maritime Organization has committed to 50% reduction in GHG emissions by 2050 worldwide as of 2023. This analysis includes performing an inventory and modeling efforts to understand the energy, equipment and cost requirements to support decarbonization of cargo handling and shore power at U.S. Ports, along with assessment of zero- and near- zero emission fuel supplies at or near U.S. ports focused upon Hydrogen technologies. Initial market assessment for ocean going vessels for harbor support and ocean-going vessels is explored. An energy analysis is performed on the port system using a holistic approach and considering the port as an entire ecosystem that functions as a transportation and energy node. Presently, a comprehensive view is lacking for future analysis efforts, this analysis seeks to address this gap in data by evaluating four representative port types and the potential for utilizing hydrogen for the maritime industry. Every port is different, but broadly they could be bracketed into reference cases with scaling factors for the relative size of the port operations. These reference ports are for future use, potentially as baselines for analysis and development of demonstration programs. An equipment inventory for each reference port type (container, bulk, breakbulk, and inland waterway) is presented. A comparative analysis of fuel cell electric and battery electric equipment is conducted based on the following criteria: technology readiness level, refueling/charging time, operational range, energy consumption, and fuel cost savings compared to baseline internal combustion engine equipment. The tradeoffs and synergies between two alternative powertrains is highlighted. Based on energy and infrastructure analysis, average and high equipment utilization profiles across different port types is identified and quantified baseline fuel and electricity demand for various decarbonization scenarios. Based on the portfolio of equipment converted to fuel cell electric, the estimates of initial capital investment are provided for hydrogen refueling stations across ports. An energy demand model is developed that predicts well the all-electric cargo handling equipment annual energy consumption for ports with annual tonnage under 2 million twenty-foot equivalent units (TEUs). The model is a good rubric to follow for further energy demand models that can create a scalable solution to understand the energy needs of cargo handling equipment, whether they are all-electric, hydrogen fuel cell, or powered by another fuel-type. Zero and near-zero emission fuel supply at ports is evaluated looking into the characteristics of hydrogen, ammonia, and methanol as an alternative fuel, as well as the bunkering status. The readiness of reference ports to produce ammonia or methanol and bunker the fuel is examined based on the framework developed by the Global Maritime Forum and Rocky Mountain Institute.

08 HYDROGEN↗

Substation Secondary Asset Health Monitoring and Management System (SSHM)

Electric Power Group, LLC (EPG) was awarded DOE OE0000850 to design, develop, and demonstrate a real-time software application for substation secondary equipment health monitoring and management at host utility American Electric Power (AEP), a cost share partner. This project addresses the need for monitoring substation equipment health and providing operators with tools to identify and take pre-emptive action to avoid catastrophic equipment failure. By monitoring synchrophasor data in real time, data anomalies that indicate potential asset failure can be detected and alerts can be sent to operators in time to take corrective actions. EPG developed two data driven algorithms to identify abnormal equipment signature patterns as well as a method using substation linear state estimation (SLSE). The software has been deployed on hardened PC’s and tested and validated for cost share partner AEP’s substations - 138kV and 765 kV. The SSHM software has been accepted by AEP and final demonstration of DOE - OE0000850 for AEP and DOE was successfully completed on March 17th, 2020. EPG developed the Substation Secondary Asset Health Monitoring (SSHM) Platform to analyze equipment failure signatures in PMU data and alert substation personnel when pre-emptive inspection, repairs and other actions are warranted to prevent potential catastrophic failures. This is the first system that automatically monitors the health of substation secondary assets and alerts users to emerging failures using synchrophasor measurements. SSHM uses high resolution PMU data from PTs, CTs, and CCVTs to analyze equipment signatures and identify anomalies that are precursor indicators of potential equipment failure. When an anomaly is detected, there is a likelihood of potential failure of monitored equipment, the system alerts the user with visual alarms including alarm trend charts and indicator lights on a oneline diagram of the substation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeled Results of Four Residential Energy Efficiency Measure Packages for Deriving Advanced Building Construction Research Targets

The Advanced Building Construction (ABC) Initiative from the U.S. Department of Energy Building Technologies Office is working to accelerate industrialized construction innovations for decarbonizing buildings. To inform performance and cost targets for research under the ABC Initiative, this analysis used the ResStock™ tool to evaluate the energy savings, utility bill impacts, and carbon emissions impacts of four simulated upgrade packages with specific target performance levels on a large sample of residential dwelling units (approximately 550,000) representative of the U.S. housing stock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly

The work performed under this agreement before the No/Go decision amounted to the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5.Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability); 7. Go / No-Go, Purchase Orders, Equipment build & commissioning next All other future task were not completed because during the Go /No-Go decision it was confirmed this project was a "No-Go" and did not proceed past BP1; these included the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5. Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability) In final preparation of the termination of the Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly, Cummins has purchased no equipment with government funds, and there is no government-owned property in Cummins possession related to this project. Minimal labor and travel were completed and paid. This acts as the Final technical report and concludes our business with DOE on this grant.

36 MATERIALS SCIENCE↗

The Challenges of Troubleshooting

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed.Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident.The primary challenges include:Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state.Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging.Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present.Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency.Equipment design and construction. The physical construction of the equipment in large part will determine to which hazards troubleshooters may be exposed. It will also determine which hazards may be encountered while performing the servicing needed to restore the equipment or system to operation.There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗

Performance Results for Sensor Assignment Problem as Solved on a Multi-Node Cluster

An earlier report described a procedure for optimal sensor set selection and its implementation on a computational cluster. This new and innovative capability was developed to facilitate a reduction in operations staffing levels to improve plant economics. By automating surveillance and maintenance tasks through early detection of degrading sensors and equipment, staff can be more efficiently deployed. The method uses automated reasoning and domain knowledge in the form of the conservation equations to infer from plant measurements the state of equipment health. Inclusion of domain knowledge addresses the problem that exists with pure data-driven methods that there are no rigorous guidelines for determining what constitutes an adequate sensor set. Formalizing the procedure for sensor set selection as we have done results in a more reliable and explainable diagnosis of plant equipment health. Importantly, from the standpoint of the plant owner, personnel are provided with an early and explicit diagnosis of an equipment problem. That in principle automates the process and eliminates having to send personnel into the plant to find the cause as typically occurs when a data-driven method detects an anomaly. In this report we describe first results obtained using a computational cluster to solve the sensor set selection problem as framed above. The case described addresses the problem of equipment health monitoring in the high-pressure (HP) feedwater system of a pressurized light water reactor as seen through the eyes of our collaborating utility partner. Maintenance of this system can amount to millions of dollars per year if equipment health issues go undiagnosed and lead to loss of function. On examining the potential that is inherent in the installed sensor set for diagnosing equipment health degradation, it was found that greater fault resolution capability can be achieved using a sensor set that is 20 percent fewer in number. The take-away is that compared to the installed sensor set there exists a more strategic assignment of sensors that will furnish better health monitoring capability and with fewer sensors. Where the problem defies solution by manual inspection, as is the case here, one can be found by an algorithm. The solution was obtained in four hours using 30 computational cores. The HP feedwater problem as posed above illustrates the added value of approaching the sensor selection problem as one amenable to algorithmic solution. This problem is of interest to advanced reactor designers and to utilities that are setting up remote monitoring and diagnostic centers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Microscopic Measurement: Need for Nuclear Material Sample Specimen Characterization Capability

The Surveillance, Fabrication, and Off-Site Operations team at Lawrence Livermore National Laboratory is beginning an update to the nuclear material machining lab in Superblock. Plutonium and other nuclear materials tend to accelerate the aging process for equipment and machines that would otherwise be maintainable for long lives. They have their lifespans shortened from deteriorated seals, embrittled polymer components, accelerated corrosion, and damage to electronics from exposure to radioactive materials. The cost of installation of equipment into a glove box (GB) tends to outstrip the cost of the equipment itself. Due to the magnification of cost, the historical approach to equipment installs has been to purchase and install the highest-quality and most robust equipment available to maximize time between failures and updates. To make room for the installation of a new lathe, the inspection GB is being moved to a different location within the machining lab. As part of the overall effort, the equipment within the inspection GB is being revisited. Current measurement capabilities are antiquated and starting to become problematic due to age. Advances in metrology are sought for more comprehensive characterization of scientific samples. This document aims to identify several options for the replacement of current measurement equipment and identify a system for purchase and eventual installation. The intention is not to select the cheapest system, but rather to identify a system that best meets the needs of both the operators and principal investigators (PI). Following the convention of the SYSM-5620 Design Thinking and System Engineering, it was determined that a laser confocal measurement system from Keyence is the most suitable option for our programmatic need. Form factor, capability, and maintainability were considered. Along with stakeholder input, to ensure the best decision for the Nuclear Material Technology Program.

36 MATERIALS SCIENCE↗

System and method for selective transmission and reception for stationary wireless networks

A system and methods for selective transmission and reception for stationary wireless networks. The system and method include an end user equipment, a primary base station, a core network, and a selective server. The end user equipment transmits a request for transmission to the primary base station receiver. The primary base station authenticates the end user equipment using a cellular network authentication process. The primary base station then searches for a time slot data for the end user equipment from the selective server and determines whether the time slot is open for transmission, steers a beam towards the end user equipment when time slot is open for transmission. The primary base station then enables transmission from the end user equipment, wherein the enabling is performed by the primary base station. The core network receives the transmission from the end user equipment.

Bhuyan, Arupjyoti↗

Nuclear Decontamination Evolution and Revolution - 20349

Decontamination, one of the oldest practices in the nuclear industry, is about to change. While no single approach to decontamination is appropriate in all situations, decontamination of highly contaminated surfaces is historically viewed as difficult and/or marginally effective and fixatives and strippable coatings are often called on to manage time sensitive contamination control issues. The deferral of proper decontamination can lead to accumulated concentrations of radioactive material increasing the risk of cross-contamination of workers and equipment while also increasing radiation levels, which further discourages decontamination. The results of the subject testing demonstrate that superior decontamination factors are readily achievable and the ALARA benefit of decontamination is viable through advanced decontamination technologies in conjunction with innovative application techniques. The collateral benefits will save countless radiological man-hours and personnel radiological exposure. The appropriate use of radiological decontamination techniques can prevent or limit the adverse effects of highly radioactive contamination in the work area. High levels of radiological contamination are typically associated with some of the most physically demanding work in the nuclear industry. Additionally, working in highly contaminated environments increases the risk of exposure to elevated levels of airborne radioactivity and radiation from the source term of the contamination, particularly in hard to reach areas or complex equipment. Veolia's Alaron Nuclear Services (Alaron), a fully integrated nuclear facility, has provided the nuclear industry waste treatment, consolidation, repackaging, and broad decontamination services for almost 35 years. In looking at solutions for its customers, as well as for their own facility, Alaron has recently collaborated with Environmental Alternatives, Inc. (EAI), which has provided innovative solutions addressing difficult nuclear decontamination and industrial cleaning challenges since 1989. This broad range of experience along with the products to support the work created an ideal partner for Alaron's needs at their facility. The benefits of collaboration were immediately recognizable to the management of both companies although the decontamination challenge was significant. Due to the nature of the services offered, contamination at the Alaron facility is routine. The recent decontamination experience at Alaron utilized an innovative surfactant process that quickly produces remarkably higher decontamination factors for both removable surface contamination and fixed contamination. Considering the time to decontaminate areas historically designated for high radiological hazard work, the results from this decontamination effort not only reduced contamination levels but also significantly lowered exposure rates in the working environment. The relative ease with which the surfactant is applied, combined with extraordinary decontamination test results, indicates the potential to alter current radiological work processes in a way that improves worker comfort, and removes radiological engineering barriers, allowing Alaron to complete complex radiological tasks more efficiently and effectively. In a series of two simple applications of the decontamination agent to contaminated high bay vertical surfaces, as well as a variety of horizontal and vertical surfaces with variable porousness and surface sealants, there was an overall reduction in removable contamination of approximately 73% with a reduction in area dose of approximately 93%. The results indicate additional reduction in fixed contamination with application of the surfactant. These values are much higher than experienced with more traditional decontamination agents. In conjunction with demonstrating EAI's surfactant on room surfaces, additional studies were conducted on complex geometry equipment including waste processing equipment, tools, and heavily contaminated parts normally handled from Alaron's customers. Evaluations were made with straight application of EAI's surfactant as well as adding additional techniques to the treatment which afforded revolutionary improvements in the levels of contamination removed. Successful decontamination with up to 95% reduction in removable contamination with just one application were demonstrated in several of the trials. This paper outlines the planned approach to use this technology, the variety of surfaces and equipment treated, and the results of the decontamination efforts. Furthermore, this paper discusses options for pretreatment of certain heavily contaminated equipment prior to employees handling and/or working with the equipment. The potential for dose saving and the reduced risk of cross-contamination with the added benefit of lower PPE requirements, produces an enormous potential for cost and time savings. Attendees will benefit from Alaron's experiences and more fully understand the capabilities of EAI's decontamination process. With the variety of contamination agents, forms and surfaces on which the technology was demonstrated, the information will be valuable to a broad cross-section of industry users. The significance of this report demonstrates superior decontamination factors are achievable utilizing the next evolution of decontamination technology and that the ALARA benefits of decontamination are available through advanced and modern decontamination efforts. The collateral benefits will save countless radiological man-hours and valuable personnel radiological exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Seismic isolation: A pathway to standardized advanced nuclear reactors

Standardizing advanced nuclear reactors is a pathway to substantially reducing their overnight capital cost and achieving parity with other power sources, including renewables and fossil fuels. The seismic load case has thwarted standardization of nuclear power plants because site-specific seismic hazard and local near-surface geology has triggered soil-structure-interaction analysis, design, equipment qualification, regulatory review, and licensing, ensuring that each build is different. To achieve standardized or site-independent certified advanced reactor designs, the impact of the seismic load case on the engineering and construction cost and time must be substantially mitigated. Seismic isolation is a mature technology that has been used for more than 30 years in non-nuclear sectors to substantially reduce earthquake demands in buildings and other infrastructure. In this paper, seismic isolation is used to enable standardization of advanced reactor designs, aimed at the complete re-use of a site-independent, certified design and repeated procurement of safety-class equipment. A pathway to standardized designs using seismic isolation is demonstrated for two fundamentally different advanced reactors: a molten salt reactor and a high temperature gas reactor. Each reactor building is equipped with three specialized pieces of safety-class equipment, namely, a reactor vessel, a steam generator, and a control rod drive mechanism housing that is attached to the reactor head. Analysis is performed per ASCE and ASME standards to design the buildings and the equipment for two base conditions: conventional (fixed base) and base isolated. The impact of the seismic load case is characterized for the reinforced concrete walls in the buildings and for the equipment, measured using vessel wall thickness and horizontal accelerations. Here the analysis results show that the fixed-base buildings, designed for a site of low seismic hazard (peak ground acceleration, PGA = 0.15 g) could be constructed at a site of much greater seismic hazard (PGA = 0.7 g) if seismic base isolation is employed. Importantly, the scope of the site-specific analysis, design, and qualification would be limited to the seismic isolators and the isolated substructure, drastically reducing plant-specific engineering, review, and licensing, and time to construction start. Regulatory challenges and opportunities with standardized reactor designs are identified.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimental Characterization Test of a Grid-Forming Inverter for Microgrid Applications

Standardized experimental testing protocols for grid forming (GFM) inverters to ensure expected operation under both normal and contingency conditions do not exist. Such protocols increase the confidence of system owner/operators that an inverter deployed in a proposed system will engage in typical behaviors to ensure interoperability with other units and ancillary equipment (e.g. protection equipment). This paper presents systematic and comprehensive test protocols to evaluate the performance of GFM inverters under the following operational configurations: islanded operation, heterogeneous islanded operation (parallel with a synchronous generator), grid-connected operation, and transition operation. A commercial GFM inverter is used to verify the test protocols and to understand the inverter's performance and functionalities. In particular, required configuration and tuning of the inverter will be explained in the full paper to enrich the testing protocol.

black start↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Analysis of Space-Conditioning Loads in Commercial Buildings

Space conditioning end-uses, which include heating, cooling, and ventilation, represent a significant fraction of commercial building energy use, with a wide variety of heating and cooling technology options available in the market. In the interest of improving the overall efficiency of heating, ventilation and air-conditioning (HVAC) technologies, governments, utilities and private sector entities have implemented a variety of market transformation policies that aim to influence consumer purchase decisions. To evaluate the costs and benefits of such programs, analysts typically postulate a hypothetical default equipment choice, and compare it to one that provides comparable service with lower energy and/or power use. The corresponding reduced operating cost provides a benefit that offsets the potential higher cost of improved efficiency. Typically, life-cycle cost or cash-flow analyses are used to quantify the net economic benefit. These analyses require the capability to assess how a given equipment design would perform across a broad range of characteristics, both of the building and of the local weather. While these assessments can be performed using customized building simulations, it is generally not practical to develop and validate detailed building simulation code to cover all the potential variations of equipment design and installation. An alternative, and somewhat simpler, approach is to solely use detailed building simulations to generate time series of heating and cooling loads in commercial buildings. These loads can then be used as input to more detailed, stand-alone engineering models that simulate HVAC system performance under different equipment designs. This approach was used to evaluate a range of high-efficiency commercial packaged air conditioner design options for the Department of Energy’s Appliance and Equipment Standards Program (DOE-EERE 2015). While there may be some loss of precision relative to full simulation, the accuracy of this approach is sufficient for practical applications of cost-benefit analysis. This report describes the development of a database of commercial building heating and cooling loads, generated using the EnergyPlus software package, a whole building energy use model supported by the Department of Energy (DOE-EERE 2020a). EnergyPlus takes as input a set of configuration files that describe the building itself (size, zoning, envelope characteristics, etc.) and the various systems within it (HVAC, lighting, water heating, etc.). This analysis uses a publicly available collection of commercial reference buildings (CRB), comprised of sixteen building types and three vintages (DOE-EERE 2020b; Deru et al 2011). Each building is simulated in eighteen different locations, covering a wide range of climatic conditions. The prototype building description files assign the type of HVAC equipment used, and capacities across climate zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Manufacturing Supply Chain Development for Modular Solar-Thermochemical Conversion Platform - CRADA 387 (Final Report)

Modular chemical process intensification (MCPI) is an emerging field where chemical processing is performed using small-scale modular equipment instead of conventional large centralized chemical plants. Conventional chemical plants benefit from economies of scale that encourage scale-up to ever larger plants. A goal of MCPI is to develop technology that intensifies processing so that equipment can be dramatically smaller and integrated into modular systems. Scale-up occurs by adding more modules in parallel rather than making the equipment larger. A key concept is that equipment and modules can ultimately be cheaper by leveraging economies of mass production, analogous to the automotive industry, in manufacturing the equipment. This project made significant progress toward this outcome by meeting the RAPID institute metric to reduce equipment cost by 20% for each doubling in manufacturing volume. The MCPI application was thermochemical technology that is being commercialized by STARS Technology Corporation, one of the CRADA partners. The technology converts solar and renewable power to chemical energy to produce renewable hydrogen, fuels, and chemicals. The benefit to the public is reduction in greenhouse gases that are contributing to climate change. The project transitioned the steam methane reforming (SMR) reactor from conventional fabrication methods to additive manufacturing (AM) direct metal laser sintering (DMLS) process. This is projected to reduce the cost of making a reactor by 58% when producing 100 reactors per year. Innovations in the DMLS process produced a patented design that reduces reactor weight by 60%. Reductions in material costs and processing time extend the DMLS advantage to higher production volumes. The new design promises to be 38% cheaper than the conventional processes at 1000 units per year. The resulting 87% reduction in the steam methane reforming (SMR) module cost in scaling from current costs meets the RAPID metric. The project was successful in producing and testing the first ever additively manufactured SMR reactors. A reactor achieved over 82% efficiency in converting electric power to chemical energy, which is a world record for an inductively heated SMR. The project has contributed to the design and assembly of a first demonstration plant that is headed to a hydrogen bus filling station in Thousand Palms, CA.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗