Search NASA⌕ Search

SEARCH · Search NASA

Results for “Final report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Enhanced Depolarized Electro-Membrane System (EDEMS) for Direct Capture of Carbon Dioxide from Ambient Air (Final Report)

The goal of this final project report is to summarize the work conducted on project DE-FE0031962. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) developed an intensified process to capture CO2 from ambient conditions (400 ppm CO2). The process combines low-temperature solvent-aided membrane capture with electrochemically-mediated solvent regeneration to simultaneously capture ambient CO2 while regenerating the solvent. The technology employs only two primary units (regenerator and absorber/contactor) while generating high purity hydrogen as a co-product that can be sold, used for energy storage, or cost-saving depolarization of the direct air capture (DAC) system during the grid peak demand, allowing for flexible operation. When depolarization is employed, the operating voltage is reduced by more than 1 V. Since the technology is powered directly by DC electricity, it can seamlessly tie in with power sources like solar cells without the need for AC/DC converters, therefore allowing for a remote operation to further mitigate greenhouse gas generation toward deploying a negative carbon emissions technology that is completely decoupled from the carbon emissions from the power source for the DAC unit. The project results verified that UK CAER’s integrated approach addressed the complexities of incumbent DAC systems by demonstrating at ambient conditions, including (1) low gas-side pressure-drop facile CO2 capture via a membrane contactor with in-situ generated hydroxide as capture solvent, (2) multi-functional electrochemical regenerator for hydroxide regeneration, CO2 concentration and hydrogen production, and (3) depolarization using cathode-produced hydrogen to reduce energy requirement. The EH&S Assessment of the process did not identify any obvious concern for the bench-scale operation and no apparent barriers to implementing UK CAER’s carbon capture and solvent regeneration system at a larger scale.

20 FOSSIL-FUELED POWER PLANTS↗

Fundamental Algorithmic Research for Quantum Computing (FAR‐QC) (Final report)

This document is the final technical report for the "Fundamental Algorithmic Research for Quantum Computing" (FAR-QC) project at Dartmouth College (PI: J. Whitfield, co-PI: L. Viola). It details the project's primary scientific accomplishments from 2019 to 2025, focusing on advances in quantum simulation algorithms, resource-efficient fermionic encodings, bosonic topology, and optimization methods for near-term quantum devices. The report also summarizes project impacts, including software development (Quiqbox.jl), workforce training, and a complete list of resulting publications.

97 MATHEMATICS AND COMPUTING↗

Charged Particle Transport Libraries (Final Report FY2020 Level-2 Milestone #7127)

This document is the final report on the status and developments of the Charged-Particle Transport (CPT) Level-2 (“CP2020”) ASC/PEM Milestone work. This section gives an overview of the CP2020 work partitioned into two subsections: 1) a summary of the code tools used for generating CP (and other) data in Section 1.2; and 2) and library data and codes access information for end users in Section 1.3. Section 2 gives an overview of the status of previous work on charged-particle (CP) nuclear data, particularly focused on the work of the FY2011 CP Level-2 Milestone. New work for CP2020 is detailed in the following Section 3. Section 4 discusses testing and validation of the evaluated and processed data for the CP2020 library. Conclusions based on the experience of this Level-2 work and the outlook for future development of CPT-relevant data are given in the final Section 5. Appendices, detailed throughout the report, are provided for further information. This report, related documentation, codes, and the CPT nuclear data libraries are available via online repository.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Final Report from Cal Poly on LLNL sponsored project

This final report consists of updates the project for the entire project period. The project started in 2018, ends on Sep 30th, 2020. Topics included are: Powder removal; Tensile Properties Test; Powder Flowability; and Thin walled Structure. Reports are included for each area.

36 MATERIALS SCIENCE↗

Final Report for Zero-noise Extrapolation for Quantum Sensing

Final Report for the DOE EXPRESS 2022 project "Zero-noise Extrapolation for Quantum Sensing." Contains a description of the motivation, accomplishments, and implications of the technical work performed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Advancing the Science of Both Coastal Ocean Biophysics and Atmospheric Pollution Chemistry: A Final Report to the Nasa Earth Science Division by the GEO-CAPE Team

The 2007 Decadal Survey (DS) included the recommendation for the Geostationary Coastal and Air Pollution Events (GEO-CAPE) mission to launch in 2013–2016 to advance the science of both coastal ocean biophysics and atmospheric-pollution chemistry. In 2009 the NASA Earth Science Division (ESD) initiated study activities for GEO-CAPE and 8 other near- to medium-term missions to help determine the readiness of these conceptual missions to begin the formulation phase. In FY15 the GEO-CAPE mission study team completed a white paper summarizing the results of the pre-formulation work accomplished to date: https://geo-cape.larc.nasa.gov/pdf/GEO-CAPE_2009-2015_SummativeWhitePaper.pdf The team was directed to complete a final report in FY18. This document, prepared as an addendum to the FY15 white paper, serves as the GEO-CAPE final report and focuses only on FY16-18 activities and on summarizing the final state.

Geostationary Coastal and Air Pollution Events↗

Orchestrating the Restoration of Wind-Dominant Grids from Blackouts (Final Report of Award No. DE-SC0021410)

This is the final report of Award No. DE-SC0021410: “Orchestrating the Restoration of Wind-Dominant Grids from Blackouts.” It: (1) summarizes the technical/scientific accomplishments, (2) lists the publications containing scientific details of the accomplishments, (3) reports several dissemination activities, (4) names new research grants as consequence of this project, (5) lists the project team funded by the project, and (6) concludes the project.

17 WIND ENERGY↗

Integrated Methane Monitoring Platform Design (Final Report)

As the urgency for understanding methane emissions and the number of methane monitoring technologies being deployed have increased in the last two decades, there is an opportunity and a need to integrate the numerous disparate data sources to enable the detection, quantification, contextualization, and reporting of methane emissions along the oil and gas supply chain. Such an integration would enable emissions reductions through early detection of super emitters, data-driven mitigation strategies, and improved greenhouse gas inventories. The GTI Energy (“GTI”) project team (“the team”) worked with a multitude of industry experts, stakeholders, and subject matter experts (SMEs) to collect guidance, insights, and information to inform the requirements and subsequent engineering, design, deployment, and operations of an integrated methane monitoring platform (IMMP). This final report describes the results of the team’s effort to execute the Integrated Methane Monitoring Platform Design project, ultimately providing an engineering, design, deployment, and operating plan (EDDOP) for the IMMP. This final report summarizes and integrates the project tasks' results and outputs.

03 NATURAL GAS↗

Supporting Information for the Integrated Methane Monitoring Platform Design (Final Report)

As the urgency for understanding methane emissions and the number of methane monitoring technologies being deployed have increased in the last two decades, there is an opportunity and a need to integrate the numerous disparate data sources to enable the detection, quantification, contextualization, and reporting of methane emissions along the oil and gas supply chain. Such an integration would enable emissions reductions through early detection of super emitters, data-driven mitigation strategies, and improvedgreenhouse gas inventories. The GTI Energy (“GTI”)project team (“the team”) worked with a multitude of industry experts, stakeholders, and subject matter experts (SMEs) to collect guidance, insights, and information to inform the requirements and subsequent engineering, design, deployment, and operations of an integrated methane monitoring platform (IMMP). This final report describes the results of the team’s effort to execute the Integrated Methane Monitoring Platform Design project, ultimately providing an engineering, design, deployment, and operating plan (EDDOP) for the IMMP. This document provides additional information supporting the findings in the final report.

03 NATURAL GAS↗

GA-ASI Final Report and Program Wrap-up for NASA System Integration and Operationalization (SIO)

The NASA SIO demonstration flight of April 3, 2020 represents a successful culmination of 18 months of coordinated effort between GA-ASI, NASA, the FAA, Collins Aerospace, and Honeywell Aerospace to operate a Medium Altitude, Long Endurance (MALE) Unmanned Aircraft System (UAS) safely in the National Airspace System (NAS) using industry leading prototype technologies. The GA-ASI team consisted of technical experts, program managers, engineers, mechanics, flight technicians, flight crews, and numerous other subject matter experts. This final report describes the most significant and potentially impactful aspects of the planning, integration, test, and flight aspects of this effort. GA-ASI successfully integrated the key technologies needed for UAS to fly in the NAS onto our prototype SkyGuardian UAS, which was designed to meet the most stringent airworthiness standards applicable to an aircraft of its size category. A proven Detect and Avoid (DAA) system, developed by GA-ASI and utilizing Honeywell Aerospace technology was integrated onto SkyGuardian for the first time, along with datalink radios from Collins Aerospace that meet the new civil standard for Control and Non-Payload Communication (CNPC) links. GA-ASI also obtained approvals from the FAA and FCC to operate the reconfigured UAS. The SIO demonstration flight represented a commercial aerial surveying operation conducted at medium altitude (>10,000ft above mean sea level). The aircraft’s onboard sensors were used to capture photographic, infrared and radar imagery of public and commercial infrastructure and land, and to subsequently produce the types of data products that would provide business value to potential customers. These survey services would supplement or replace services currently provided by manned airplanes and helicopters, small drones or satellites. A “virtual” mission was also planned, to show what additional survey data could have been captured during the flight if additional sensors had been installed on the aircraft’s external hardpoints. This revision of the final report focuses on information of value to the wider UAS community, and avoids propriety data to facilitate broad dissemination. It also includes a description of GA-ASI’s engagement with the FAA following the SIO flight, which led to the award of an updated Special Airworthiness Certificate in the Experimental Category (SAC-EC) and a Certificate of Waiver or Authorization (COA) allowing operation of the SkyGuardian UAS using its DAA system to satisfy right-of-way rules, instead of a chase plane. The associated operational limitations are described to illustrate the further steps that would be needed to remove those limitations for unhindered commercial operations.

Flight demonstration↗

Development of Methods of Increasing Terminal Flexibility and Control Authority: Option Year 1 Final Report

The focus of the NRA contract is to develop a What-if Analysis Tool for planning Departure Management Programs (DMP) at airports. This final report summarizes the work conducted throughout the option year, with a focus on use case specification for the what-if analysis capability and the implementation of the What-if Analysis Tool and its application to traffic and weather scenarios at Charlotte Douglas International Airport (CLT).

Departure Management Programs (DMP)↗

Body-fixed, Three-Axis Reference System Study: Phase II Final Report

This Phase II Body-Fixed, Three-Axis Reference System Study Final Report is the result of a follow-on contract awarded by NASAIMSFC to TRW Systems in April 1966, under Contract No, NASS-20209. of the Phase I1 Study was to refine and supplement the strapdown inertial ’ reference assembly (SIRA), software, airborne computer, and alignment analyses performed during Phase I of the same contract. The purpose Specifically, the Phase I results in many areas were those which could be achieved using simplifying assumptions (linearization) and hand analyses. It was the purpose of the Phase I1 studies to investigate the validity of the Phase I results by means of more sophisticated computer simulations, in which no simplifying assumptions were made, for each of the areas analyzed. The Phase 11 analyses were directed, therefore, at confirming the analytical feasibility asserted by the Phase I results.

Source record↗

Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (Final Report)

This document presents final technical findings for the project Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (FE0031782). The project is part of the U.S. Department of Energy Oil and Gas Program to develop and advance technologies that can significantly improve the recovery efficiencies of unconventional oil and gas resources. The overall objective of this project is to improve the ultimate recovery from unconventional oil and gas (UOG) resources in the United States by developing a method for using unrefined natural gas liquids (NGLs) as treatment fluids to improve hydrocarbon production. Horizontal extended-lateral drilling coupled with high volume hydraulic fracturing has significantly increased production from UOG resources in the U.S. However, the recovery efficiency is low compared to the estimated oil and gas in place. Recent data indicate that less than 10% of the oil in the liquid-rich UOG reservoirs is produced. Alternative completion methods using NGLs could increase production (Battelle, 2016; Wan et al., 2013; Wan, 2013; Downey et al, 2021); however, field validation tests are needed to develop an approach that is economical, efficient, and compatible in the UOG setting to advance towards commercial deployment. This project aims to develop and field test a method to improve recovery of oil resources in UOG shale plays by using Y-Grade NGLs, or a similar combination of NGLs, as treatment fluids. Refined NGLs have been used as a hydraulic treatment fluid in UOG plays for decades and are shown to be particularly effective because their miscibility with oil allows oil to flow more freely; however, the use of Y-Grade (unrefined) NGLs has not been studied. The use of Y-Grade NGLs would be advantageous over refined NGLs because Y-Grade NGLs do not require infrastructure or investment in refining and are already being produced from many UOG reservoirs. The concept was tested and monitored in the field at a commercial well site owned by project partner Hopco, Ltd. The project team, which consists of multiple oil and gas operators, Linde Gas North America LLC (Linde) and the Ohio Division of Geological Survey (ODGS), has extensive experience with oil and gas production in the Appalachian basin and the ability to work together quickly to solve technical issues and research needs. A key part of the proposed work was the use of existing wells for field testing and monitoring. A total of four wells (three vertical and one horizontal) were available for this project. One of the vertical wells was utilized as the test well for the NGL treatment test. A nearby vertical well was used for microseismic monitoring. The remaining vertical well and the horizontal well provided a baseline for typical UOG production in the oil window of the Utica/Point Pleasant (UPP). Major technical tasks of the project include characterization of the geotechnical properties of the UPP with an emphasis on the field site; design and planning for the NGLs testing; field testing and monitoring; analysis and integration of field data; and economic and resource/reserve assessment. The Shoman monitoring well and Doughty NGL treatment well were successfully plugged back during September-October 2020 in preparation for treatment and monitoring. A nitrogen diagnostic fracture injection test (DFIT) was completed on the Doughty well on July 22, 2021, consisting of 133,000 scf (91 Bbl.) of nitrogen. A nitrogen foam frac was completed in the Utica-Point Pleasant interval on August 17, 2021 with funding from outside sources. A microseismic monitoring array was installed in the Shoman well and monitored microseismic activity during the Doughty well frac job. Y-Grade NGL injection commenced on August 26, 2021. A total of 215 Bbl. was injected but the job was shut down due to a small leak on the suction hose on the pump truck. The Y-Grade treatment resumed on August 27, 2021 and an additional 726 Bbl. of Y-Grade NGL was injected at a well head pressure of 3850 psi. Total volume of injected Y-Grade over the two days of injection was 941 Bbl. The well was shut-in for 17 days following injection to allow the Y-Grade NGLs to soak on the formation. Y-Grade treatment flow back commenced on 9/13/2021 on a weekly basis. Production data, including surface pressures, oil, nitrogen, natural gas, and flow times was measured and recorded. Periodic gas samples were collected and analyzed to determine composition of flowback gas. As of July 2022, the treatment well had produced 726 Bbl of oil and 2,888 mcf gas. In August 2022, tubing and packer in the well were removed and a pump was installed to enhance oil recovery. Currently, the operator is producing the well about 2 days a week for a few hours. The performance of the NGL treatment test was evaluated based on reservoir simulations of the treatment process, processing of well testing data, analysis of micro seismic monitoring data, and production data analysis. This analysis suggested that oil production in the small test would continue through 2025. Upscaling the treatment to a horizontal Utica Point-Pleasant well would allow more oil recovery, but the process would involve more investment, services, and operational support. An economic analysis was conducted for scenarios aimed at upscaling the NGL treatment process for more typical horizontal UPP wells in the Appalachian Basin.

02 PETROLEUM↗