Search NASA⌕ Search

SEARCH · Search NASA

Results for “Flight test infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Initial Developments Toward an Active Noise Control System for Small Unmanned Aerial Systems

Small unmanned aerial systems have the potential to expand commercial markets from package delivery to infrastructure inspection. Many missions, however, require the vehicles to operate in close proximity to people, where community noise concerns could ultimately limit vehicle acceptability. Therefore, noise control technologies may be needed to achieve an acceptable noise signature and enable widespread use of these vehicles. The purpose of this paper is to assess the feasibility of using loudspeakers attached to the vehicle to actively reduce noise. More specifically, this initial study explores the possibility of using a single loudspeaker to reduce the noise from an isolated rotor. Tests performed in an anechoic chamber with a 7.6 cm diameter speaker and 23.9 cm diameter rotor are used to demonstrate the potential benefits and limitations of the concept. Results confirm that active noise control can work in this application with measured tonal reductions of over 30 dB in specific directions. However, since the radiation characteristics of the speaker are different than the rotor, amplification is observed in other directions. This technology has the potential to create a “cone of silence”, which could be steered during flight operations to minimize the impact on noise sensitive areas.

Schiller, Noah H.↗

Lunar and Mars Exploration: The Autonomy Factor

Long duration space flight crews have relied heavily on almost constant communication with ground control mission support. Ground control teams provide vehicle status and system monitoring, while offering near real time support for specific tasks, emergencies, and ensuring crew health and well being. With extended exploration goals to lunar and Mars outposts, real time communication with ground control teams and the ground s ability to conduct mission monitoring will be very limited compared to the resources provided to current International Space Station (ISS) crews. An operational shift toward more autonomy and a heavier reliance on the crew to monitor their vehicle and operations will be required for these future missions. NASA s future exploration endeavors and the subsequent increased autonomy will require a shift in crew skill composition, i.e. engineer, doctor, mission specialist etc. and lead to new training challenges and mission scenarios. Specifically, operational and design changes will be necessary in many areas including: Habitat Infrastructure and Support Systems, Crew Composition, Training, Procedures and Mission Planning. This paper will specifically address how to apply ISS lessons learned to further use ISS as a test bed to address decreased amounts of ground support to achieve full autonomous operations for lunar and Mars missions. Understanding these lessons learned and applying them to current operations will help to address the future impacts of increased crew autonomy for the lunar and Mars outposts and pave the way for success in increasingly longer mission durations.

Rando, Cynthia M.↗

Kennedy Space Center: Creating a Spaceport Reality from the Dreams of Many

On December 17, 1903, Orville Wright piloted the first powered airplane only 20 feet above the ground near Kitty Hawk, North Carolina. The flight lasted 12 seconds and covered 120 feet. Who would have guessed that the bizarre looking contraption developed by brothers in the bicycle business would lay the ground work eventually resulting in over a million passengers moved daily in a sky filled with the contrails of jets flying at over 30,000 feet in elevation and over 500 miles per hour. Similarly, who would have guessed that the destructive nature of V-2 rockets of Germany would spark the genesis of spaceflight to explore our solar system and beyond? Yet the interest in using the Kennedy Space Center (KSC) continues to grow. Potential customers have expressed interest in KSC as a location for testing new rocket engines, servicing the world's largest airborne launching platform for drop-launch rockets, developing multi-use launch platforms that permit diverse customers to use the same launch platform, developing new spacecraft, and implementing advanced modifications for lifting 150 metric ton payloads to low earth orbit. The multitude of customers has grown and with this growth comes a need to provide a command, control, communication, and range infrastructure that maximizes flexibility and reconfigurability to address a much more frequent launch rate of diverse vehicles and spacecraft. The Ground Systems Development and Operations (GSDO) Program Office at KSC is embarking upon these developments to realize the dream of a robust spaceport. Many unique technical trade studies have been completed or are underway to successfully transition KSC into a multi-user customer focused spaceport. Like the evolution of the airplane, GSDO is working to transform KSC infrastructures that will turn once unthinkable space opportunities into a reality for today.

Gray, James A.↗

Engineering the Interface: Advanced Surface Technologies for Lunar Dust Management and Equipment Longevity

Through the Artemis program, NASA intends to develop a sustainable human foothold on the Moon, ultimately paving the way for crewed exploration of Mars. The Moon's hostile environment poses numerous obstacles, including exposure to radiation, temperature extremes, micrometeoroid threats, and particularly the persistent problem of lunar dust. Lunar dust impacts nearly every aspect of surface operations through adhesion and abrasion mechanisms, with contamination from anthropogenic activities (landing, rovers) far outweighing natural phenomena. Multiple adhesion pathways contribute to surface contamination in the lunar environment, including van der Waals forces, electrostatic forces, chemical reaction, and magnetic forces from elemental iron deposits. Sharp asperities from micrometeoroid bombardment and atmospheric absence increase interaction potential and enable mechanical interlocking. Low cohesion between dust particles exacerbates these challenges, as minimal interaction potential between dust and nearby surfaces overcomes particle cohesion, causing contamination. Lunar dust adhesion mitigation technologies can be categorized as either active, requiring external energy, or passive, relying on intrinsic material properties. Ultrasonic and electrodynamic technologies have been developed to the highest technology readiness level for active approaches. Passive strategies primarily focus on surface chemistry and topography modifications. At NASA Langley Research Center, approaches include surface migration agents to reduce surface energy, topographical modification using laser ablation patterning, and tailored surface conductivity to reduce intrinsic adhesion force. Performance has been evaluated using custom-built ultrasonic and centrifuge instruments. Plume-surface interactions from lunar landers can propel micrometer-sized particles at velocities up to 1000 m s-1.8 These particles pose risks to landers, habitats and infrastructure, leading to erosion, degradation, and reduced component lifespan. A panel recovered from Surveyor III was determined to have been severely abraded because of lunar dust displaced from the Apollo 12 lunar module that landed 160 m away. The performance of metallic surfaces has been evaluated via high velocity single particle impact using the laser-induced project impact test (LIPIT) facility at the University of Utah. Peridynamics modeling, a form of continuum mechanics that uses a nonlocal approach enabling greater simulation capabilities of crack initiation and fracture, has also been utilized to gain greater insight into material response during impact events. Lunar dust contamination challenges extend to power generation systems and moving equipment. Cables, rotation stages, and other mechanisms may experience limited range of motion and reduced lifetime due to dust infiltration. NASA Langley Research Center has evaluated traditional aerospace alloys, softgoods, wear resistant ceramics, and several polymer and polymer composite materials. Test methods have included traditional techniques like Taber abrasion testing, as well as designed test configurations developed in the DUSTE (dust, ultraviolet radiation, and space thermal environmental) chamber that reproduce mechanism functions in operational environment. Beyond laboratory experiments, several flight experiments have been conducted. Materials were exposed to the low Earth orbit environment on the Materials International Space Station Experiment (MISSE) and to the lunar surface environment through the Aegis Aerospace Regolith Adherence Characterization (RAC) payload and the Honeybee Robotics PlanetVac payload. Determining lunar dust's impact on surface exploration and habitation requires comprehensive experimental and computational capabilities combined with lessons learned from initial lunar activities. Identifying the greatest environmental challenges and developing mitigation technologies provides the clearest path toward successfully, expeditiously, and efficaciously completing NASA's mission. This presentation will discuss ongoing efforts at NASA Langley Research Center and collaborator contributions to these critical objectives.

Surface Engineering↗

An Introduction to Flight Software Development: FSW Today, FSW 2010

Experience and knowledge gained from ongoing maintenance of Space Shuttle Flight Software and new development projects including Cockpit Avionics Upgrade are applied to projected needs of the National Space Exploration Vision through Spiral 2. Lessons learned from these current activities are applied to create a sustainable, reliable model for development of critical software to support Project Constellation. This presentation introduces the technologies, methodologies, and infrastructure needed to produce and sustain high quality software. It will propose what is needed to support a Vision for Space Exploration that places demands on the innovation and productivity needed to support future space exploration. The technologies in use today within FSW development include tools that provide requirements tracking, integrated change management, modeling and simulation software. Specific challenges that have been met include the introduction and integration of Commercial Off the Shelf (COTS) Real Time Operating System for critical functions. Though technology prediction has proved to be imprecise, Project Constellation requirements will need continued integration of new technology with evolving methodologies and changing project infrastructure. Targets for continued technology investment are integrated health monitoring and management, self healing software, standard payload interfaces, autonomous operation, and improvements in training. Emulation of the target hardware will also allow significant streamlining of development and testing. The methodologies in use today for FSW development are object oriented UML design, iterative development using independent components, as well as rapid prototyping . In addition, Lean Six Sigma and CMMI play a critical role in the quality and efficiency of the workforce processes. Over the next six years, we expect these methodologies to merge with other improvements into a consolidated office culture with all processes being guided by automated office assistants. The infrastructure in use today includes strict software development and configuration management procedures, including strong control of resource management and critical skills coverage. This will evolve to a fully integrated staff organization with efficient and effective communication throughout all levels guided by a Mission-Systems Architecture framework with focus on risk management and attention toward inevitable product obsolescence. This infrastructure of computing equipment, software and processes will itself be subject to technological change and need for management of change and improvement,

Gouvela, John↗

Cold Metal Transfer (CMT) Wire-Arc Additive Manufacturing (WAAM)

Aluminum has been identified as a compound within regolith and is likely to become a core component of our infrastructure on the lunar surface as in-situ resource utilization (ISRU) capabilities are advanced Large-scale components, outfitting, and repairs of aluminum materials can be fabricated with robotic wire arc additive manufacturing (WAAM) in order to inhabit the moon’s surface long term WAAM is a high value process for lunar advanced manufacturing as it does not require special containment to reduce explosion hazards such as powder-based additive processes and feedstock The welding process of cold metal transfer (CMT) is a relatively new variation of gas metal arc welding (GMAW, also known as MIG) that relies on the detection of a short circuit in the welding process to control the deposition droplet action, resulting in lower heat input and splatter compared to conventional MIG welding The past year was spent developing the CMT-WAAM process for aluminum materials, tested specialty feedstock, tested within the high vacuum environment, and advanced the MSFC capability to perform complex toolpathing from solid models Upcoming and future work includes large depositions working towards material certification for multiple feedstocks, in-situ monitoring, work to use recycled materials for the AM feedstock, and the design and fabrication of a parabolic flight experiment payload.

cold metal transfer↗

Risk Trade-Space Analysis for Safe Human Expeditions to Mars

We assessed the integrated safety, health, and performance risk to crews on long-duration missions, specifically to Mars. Using a systems approach rather than one focused on individual countermeasures, we examined the trade space around several such risks to identify high-potential risk mitigation strategies and characterize aspects of Mars mission architectures that could lower aggregated risk. Current Mars Design Reference missions would require durations well over two years and would increase crew exposure to radiation and microgravity well beyond ISS levels, likely resulting in significantly reduced performance beyond our current capability to mitigate that could jeopardize mission success. A “fast Mars transit” round-trip mission concept was studied using an innovative flight dynamics approach to quantify the minimum total mission energy required for a Mars transit with total mission duration less than 400 days. This approach holds promise for sending humans to Mars and returning them safely with acceptable, potentially mitigatable, exposure to microgravity and radiation using current or near-term technologies. The fast transit concept would also result in fewer time-driven vehicle failures and enable sustainable deployment of humans and infrastructure to Mars on a regular cadence, allowing steady exploration and colonization of Mars. Finally, we conclude that reliance on the Low Earth Orbit (LEO) mission operations paradigm – i.e., one of near-complete real-time dependence on experts at Mission Control to manage the combined state of the mission, vehicle, and crew – is high risk given the communication delays and limited resupply of any Mars mission, and this risk is not eliminated by the shorter missions durations of fast transit scenarios. Based on historical trends, it is highly likely that the crew will face a high-consequence problem of uncertain origin during Mars transit when ground support will be greatly reduced. While it may be possible to reduce anomaly rates through improved reliability analysis and testing, and to reduce anomaly impacts through added robustness, such mitigations address only known failure modes and known uncertainties. Therefore, a radical shift in the Human-Systems Integration Architecture (HSIA) that defines the operational paradigm, systems design, and human-systems interactions is required to improve the risk posture to an acceptable level regardless of mission duration.

Mars↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗

Advances in Stereo Photogrammetry Capabilities for in-Situ Ejecta Measurements in Lunar Plume-Surface Interactions

Plume-surface interaction is a critical topic of interest as human spaceflight programs establish a renewed presence on the Moon and push onwards to Mars. The erosion of regolith and high-speed ejection of soil and rocks which occurs during a powered spacecraft landing on lunar or terrestrial bodies can pose serious risks to the vehicle during landing and to existing ground assets. Ground testing campaigns have provided data sets in relevant environments (e.g., low pressure) in tandem with predictive computational model validation. To-date, limited in-situ flight data exists to inform the study of the key phenomena of plume-surface interaction: plume-flow physics, soil erosion, and ejecta dynamics. In two upcoming lunar missions, erosion of the lunar regolith will be measured in-situ using the stereo photogrammetry technique as part of NASA’s Commercial Lunar Payload Services (CLPS) Program. The Stereo Cameras for Lunar Plume Surface Studies (SCALPSS) will use a multiple-camera system to measure the erosion of the lunar regolith due to the vehicles’ rocket engine plumes during descent and after landing. The application of stereo photogrammetry to accurately measure a realistic eroded shape has been validated in laboratory work ahead of the scheduled flights. In preparation for future CLPS, Artemis, or other lunar science missions, recent advancements have been made to measure the ejecta structure and particle dynamics in addition to the erosion of regolith using a SCALPSS-like photogrammetry system. The thickness and ejection angle of entrained soil and dust produced during plume-induced erosion can be used to determine how far debris will travel, and thus how it may impact nearby infrastructure or the landing vehicle itself. The present work highlights the development of this new flight instrumentation capability and its value to advancements in the plume-surface interaction measurement topic for lunar or planetary landings.

Olivia K. Tyrrell↗

Spacesuit Water Membrane Evaporator; An Enhanced Evaporative Cooling System for the Advanced Extravehicular Mobility Unit Portable Life Support System

Development of the Advanced Extravehicular Mobility Unit (AEMU) portable life support subsystem (PLSS) is currently under way at NASA Johnson Space Center. The AEMU PLSS features a new evaporative cooling system, the Generation 4 Spacesuit Water Membrane Evaporator (Gen4 SWME). The SWME offers several advantages when compared with prior crewmember cooling technologies, including the ability to reject heat at increased atmospheric pressures, reduced loop infrastructure, and higher tolerance to fouling. Like its predecessors, Gen4 SWME provides nominal crew member and electronics cooling by flowing water through porous hollow fibers. Water vapor escapes through the hollow fiber pores, thereby cooling the liquid water that remains inside of the fibers. This cooled water is then recirculated to remove heat from the crew member and PLSS electronics. Test results from the backup cooling system which is based on a similar design and the subject of a companion paper, suggested that further volume reductions could be achieved through fiber density optimization. Testing was performed with four fiber bundle configurations ranging from 35,850 fibers to 41,180 fibers. The optimal configuration reduced the Gen4 SWME envelope volume by 15% from that of Gen3 while dramatically increasing the performance margin of the system. A rectangular block design was chosen over the Gen3 cylindrical design, for packaging configurations within the AEMU PLSS envelope. Several important innovations were made in the redesign of the backpressure valve which is used to control evaporation. A twin-port pivot concept was selected from among three low profile valve designs for superior robustness, control and packaging. The backpressure valve motor, the thermal control valve, delta pressure sensors and temperature sensors were incorporated into the manifold endcaps, also for packaging considerations. Flight-like materials including a titanium housing were used for all components. Performance testing of the Gen4 SWME is underway.

Bue, Grant C.↗

An Integrated Architecture Study for Autonomous Lunar Construction

Lunar construction is an expanding field within NASA’s Moon to Mars objectives that presents many challenges and requires innovative and reliable forms of autonomous operations on the surface of the Moon to further the technologies needed for human space exploration. Marshal Space Flight Center’s (MSFC) Advanced Concepts Office (ACO) addressed Lunar Infrastructure Objective LI-4 l by developing a Pre-Phase A, integrated architecture to inform a demonstration for lunar construction operations. The ACO study traded three architectures that would survey and prepare a construction area to build a landing pad out of lunar regolith using MMPACT (Moon-to-Mars Planetary Autonomous Construction Technology) platforms, rovers, and navigation outposts. The main trades examined navigation for the system/architecture, options for rover navigation, battery vs continuous tether power for the MMPACT robotic arm, and assigning site prep functionality to the rovers vs the platforms. Results of the study determined that the best options for the scenario provided would be local navigation (more accurate and continuous), a combination of Light Detection and Ranging (LiDAR) for initial site mapping with subsequent Smart Video Guidance Sensors (SVGS) to save power for construction, and using tethered power to decrease mission duration. The team also concluded that assigning site prep functionality to either the rovers or the platforms has benefits and challenges; future studies could explore having that functionality on both the rovers and platforms. Lastly, the team provided a Concept of Operations (ConOps) timeline that can be used in real-time ground demonstrations to explore the mission timeline, construction processes, autonomous operations, and communication systems that can be tested using MSFC’s lunar regolith field and Lunar Utilization Control Area (LUCA).

Sarah Triana↗

Advanced Space Fission Propulsion Systems

Fission has been considered for in-space propulsion since the 1940s. Nuclear Thermal Propulsion (NTP) systems underwent extensive development from 1955-1973, completing 20 full power ground tests and achieving specific impulses nearly twice that of the best chemical propulsion systems. Space fission power systems (which may eventually enable Nuclear Electric Propulsion) have been flown in space by both the United States and the Former Soviet Union. Fission is the most developed and understood of the nuclear propulsion options (e.g. fission, fusion, antimatter, etc.), and fission has enjoyed tremendous terrestrial success for nearly 7 decades. Current space nuclear research and technology efforts are focused on devising and developing first generation systems that are safe, reliable and affordable. For propulsion, the focus is on nuclear thermal rockets that build on technologies and systems developed and tested under the Rover/NERVA and related programs from the Apollo era. NTP Affordability is achieved through use of previously developed fuels and materials, modern analytical techniques and test strategies, and development of a small engine for ground and flight technology demonstration. Initial NTP systems will be capable of achieving an Isp of ~900 s at a relatively high thrust-to-weight ratio. The development and use of first generation space fission power and propulsion systems will provide new, game changing capabilities for NASA. In addition, development and use of these systems will provide the foundation for developing extremely advanced power and propulsion systems capable of routinely and affordably accessing any point in the solar system. The energy density of fissile fuel (8 x 10(exp 13) Joules/kg) is more than adequate for enabling extensive exploration and utilization of the solar system. For space fission propulsion systems, the key is converting the virtually unlimited energy of fission into thrust at the desired specific impulse and thrust-to-weight ratio. This presentation will discuss potential space fission propulsion options ranging from first generation systems to highly advanced systems. Ongoing research that shows promise for enabling second generation NTP systems with Isp greater than 1000 s will be discussed, as will the potential for liquid, gas, or plasma core systems. Space fission propulsion systems could also be used in conjunction with simple (water-based) propellant depots to enable routine, affordable missions to various destinations (e.g. moon, Mars, asteroids) once in-space infrastructure is sufficiently developed. As fuel and material technologies advance, very high performance Nuclear Electric Propulsion (NEP) systems may also become viable. These systems could enable sophisticated science missions, highly efficient cargo delivery, and human missions to numerous destinations. Commonalities between NTP, fission power systems, and NEP will be discussed.

Houts, Michael G.↗

Investigation of Lunar-Inspired Geopolymer Concrete Formulations Mixed and Cured in Microgravity on the International Space Station (ISS)

The research outlined in this presentation investigates the use of various lunar regolith simulants in geopolymer lunar concrete mixes mixed and cured on the International Space Station (ISS). The motivation for this work is to study the effects of gravity on the microstructure of alkali-activated materials cured with heat, and to develop materials for the construction of long-term infrastructure on the lunar surface with in-situ resource utilization (ISRU). ISRU for construction materials reduces the cost and mass of payloads related to lunar construction. The advantage of geopolymer concrete as opposed to traditional portland cement concrete is that water acts as a medium for the polymerization reaction and leaves the system throughout the process, reducing its demand. Twelve samples of lunar regolith simulant and a solution composed of sodium hydroxide and sodium silicate were sent to the ISS. The three simulants were OPRH2N, OPRL2N, and JSC-1AF, using only particles less than 53 µm in diameter to increase reactivity of the simulant. Simulant to solution ratios were determined by workability while mixing. The simulant and solution were sealed Burst Pouches® along with 2 other sealed bags to prevent material from leaking. Crew member F-14 conducted testing on the ISS by introducing the solution to the simulant in the Burst Pouch®, mixing the sample with a spatula, and then clamping the specimen in the fresh state to prevent flow inside the Burst Pouch®. These specimens were then put in a thermos heated to 80C via sealed drinking water bags to cure for 24 hours with a temperature logger. The cured specimens remained in microgravity for at least 28 days and were returned from the ISS in February 2025. The specimens were then brought to the NASA Marshall Space Flight Center (MSFC) to analyze. Material characterization consisted of conducting Micro-CT tests of entire samples in their sealed apparatus to a resolution of 25µm. 2D image slices were saved in each orthogonal direction of each specimen at a 0.03 mm step size from the 3D model to conduct analytical porosity calculations. Representative samples from each specimen were sampled to perform helium gas pycnometery and were then mounted in resin for SEM imaging, EDS, and nanoindentation. Porosity was analyzed analytically using micromechanics modelling with the assistance of the NASA Multiscale Analysis Tool (NASMAT), as well as the NASA Advanced Supercomputing (NAS) servers (V. Saseendran & N. Yamamoto, 2024). Density was measured using helium gas pycnometery and was then compared to the theoretical density for experimental porosity calculation. Due to the samples’ non-uniform shape being cured in a pouch, traditional compression and tensile strength testing could not be performed. Nanoindentation was conducted at Clarkson University to determine the microhardness and reduced modulus of elasticity. Results from flight samples can be compared to ground samples currently in DLR’s possession to determine the effect on microstructure from being mixed and cured in microgravity. This study gives further insight and understanding of geopolymer lunar concrete and its viability as a lunar construction material with ISRU.

Adam Johnson↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASAs Space Launch System

The engineering development of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS) requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The nominal and off-nominal characteristics of SLS's elements and subsystems must be understood and matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex systems engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model-based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model-based algorithms and their development lifecycle from inception through FSW certification are an important focus of SLS's development effort to further ensure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. To test and validate these M&FM algorithms a dedicated test-bed was developed for full Vehicle Management End-to-End Testing (VMET). For addressing fault management (FM) early in the development lifecycle for the SLS program, NASA formed the M&FM team as part of the Integrated Systems Health Management and Automation Branch under the Spacecraft Vehicle Systems Department at the Marshall Space Flight Center (MSFC). To support the development of the FM algorithms, the VMET developed by the M&FM team provides the ability to integrate the algorithms, perform test cases, and integrate vendor-supplied physics-based launch vehicle (LV) subsystem models. Additionally, the team has developed processes for implementing and validating the M&FM algorithms for concept validation and risk reduction. The flexibility of the VMET capabilities enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the developed algorithms utilizing actual subsystem models such as MPS, GNC, and others. One of the principal functions of VMET is to validate the M&FM algorithms and substantiate them with performance baselines for each of the target vehicle subsystems in an independent platform exterior to the flight software test and validation processes. In any software development process there is inherent risk in the interpretation and implementation of concepts from requirements and test cases into flight software compounded with potential human errors throughout the development and regression testing lifecycle. Risk reduction is addressed by the M&FM group but in particular by the Analysis Team working with other organizations such as S&MA, Structures and Environments, GNC, Orion, Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission (LOM) and Loss of Crew (LOC) probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and associated detection and responses to be tested in VMET to ensure reliable failure detection, and confirm responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - the ARINC 6535-partitioned Operating System, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM such as telemetry packing and processing. The baseline plan for use of VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by FSW. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure their effectiveness and performance in the exterior FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.↗

Launching to the Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission today, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. Unlike the Apollo program of the 1960s, this phase of exploration will be a journey, not a race. In 1966, the NASA's budget was 4 percent of federal spending. Today, with 6/10 of 1 percent of the budget, NASA must incrementally develop the vehicles, infrastructure, technology, and organization to accomplish this goal. Fortunately, our knowledge and experience are greater than they were 40 years ago. NASA's goal is a return to the Moon by 2020. The Moon is the first step to America's exploration of Mars. Many questions about the Moon's history and how its history is linked to that of Earth remain even after the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment. The Moon also will serve as a training ground in several respects before embarking on the longer, more perilous trip to Mars. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, the Ares V Cargo Launch Vehicle, the Orion Crew Exploration Vehicle, and the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit on the Ares I and a second launch to orbit the lunar lander and the Earth Departure Stage to send the lander and crew vehicle to the Moon. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on proven hardware and decades of experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. Less than one year after the Exploration Launch Projects Office was formed at NASA's Marshall Space Flight Center, engineers are testing engine components, firing test rocket motors, refining vehicle designs in wind tunnel tests, and building hardware for the first flight test of Ares I, scheduled for spring 2009. The Vision for Exploration will require this nation to develop tools, machines, materials, and processes never before invented, technologies and capabilities that can be turned over to the private sector to benefit nearly all aspects of life on Earth. This new pioneering venture, as did the Apollo Program before it, will contribute to America's economic leadership, national security, and technological global competitiveness and serve as an inspiration for all its citizens.

Sumrall, John P.↗

Enhanced Flight Vision Systems Operational Feasibility Study Using Radar and Infrared Sensors

Approach and landing operations during periods of reduced visibility have plagued aircraft pilots since the beginning of aviation. Although techniques are currently available to mitigate some of the visibility conditions, these operations are still ultimately limited by the pilot's ability to "see" required visual landing references (e.g., markings and/or lights of threshold and touchdown zone) and require significant and costly ground infrastructure. Certified Enhanced Flight Vision Systems (EFVS) have shown promise to lift the obscuration veil. They allow the pilot to operate with enhanced vision, in lieu of natural vision, in the visual segment to enable equivalent visual operations (EVO). An aviation standards document was developed with industry and government consensus for using an EFVS for approach, landing, and rollout to a safe taxi speed in visibilities as low as 300 feet runway visual range (RVR). These new standards establish performance, integrity, availability, and safety requirements to operate in this regime without reliance on a pilot's or flight crew's natural vision by use of a fail-operational EFVS. A pilot-in-the-loop high-fidelity motion simulation study was conducted at NASA Langley Research Center to evaluate the operational feasibility, pilot workload, and pilot acceptability of conducting straight-in instrument approaches with published vertical guidance to landing, touchdown, and rollout to a safe taxi speed in visibility as low as 300 feet RVR by use of vision system technologies on a head-up display (HUD) without need or reliance on natural vision. Twelve crews flew various landing and departure scenarios in 1800, 1000, 700, and 300 RVR. This paper details the non-normal results of the study including objective and subjective measures of performance and acceptability. The study validated the operational feasibility of approach and departure operations and success was independent of visibility conditions. Failures were handled within the lateral confines of the runway for all conditions tested. The fail-operational concept with pilot in the loop needs further study.

Etherington, Timothy J.↗