Future plans for the NASA suborbital program

The development of more reliable heavy-lift balloons and a fine pointed gondola; the development of the Black Brant-12 rocket for auroral research; and the development of a collaborative Orbiting Payload Using Scout program are outlined. Through 1989 NASA will conduct a comprehensive program of aircraft, balloon, and rocket campaigns in conjunction with Shuttle and satellite measurements on the Supernovae 1987a.

Shawhan, S. D.↗

Planetary protection implementation on future Mars lander missions

A workshop was convened to discuss the subject of planetary protection implementation for Mars lander missions. It was sponsored and organized by the Exobiology Implementation Team of the U.S./Russian Joint Working Group on Space Biomedical and Life Support Systems. The objective of the workshop was to discuss planetary protection issues for the Russian Mars '94 mission, which is currently under development, as well as for additional future Mars lander missions including the planned Mars '96 and U.S. MESUR Pathfinder and Network missions. A series of invited presentations was made to ensure that workshop participants had access to information relevant to the planned discussions. The topics summarized in this report include exobiology science objectives for Mars exploration, current international policy on planetary protection, planetary protection requirements developed for earlier missions, mission plans and designs for future U.S. and Russian Mars landers, biological contamination of spacecraft components, and techniques for spacecraft bioload reduction. In addition, the recent recommendations of the U.S. Space Studies Board (SSB) on this subject were also summarized. Much of the discussion focused on the recommendations of the SSB. The SSB proposed relaxing the planetary protection requirements for those Mars lander missions that do not contain life detection experiments, but maintaining Viking-like requirements for those missions that do contain life detection experiments. The SSB recommendations were found to be acceptable as a guide for future missions, although many questions and concerns about interpretation were raised and are summarized. Significant among the concerns was the need for more quantitative guidelines to prevent misinterpretation by project offices and better access to and use of the Viking data base of bioassays to specify microbial burden targets. Among the questions raised were how will the SSB recommendations be integrated with existing Committee on Space Research (COSPAR) policy and how will they apply to and affect Mars '94, Mars '96, MESUR Pathfinder, and MESUR Network missions? One additional topic briefly considered at the workshop was the identification of some issues related to planetary protection considerations for Mars sample return missions. These issues will form the basis for a follow-on joint U.S./Russian workshop on that subject.

Howell, Robert↗

Research Software Engineering Efforts for DataFed: FY2021 Developments

DataFed is a scientific data management system for big data providing simple and uniform data access, organization, discovery, and sharing within and across scientific facilities - with the goals of enhancing productivity and scientific reproducibility. We hope to aid in communicating development contributions to DataFed over the last year and any planning we can provide for the future developments in the next year

42 ENGINEERING↗

ILEOS: A Novel Intelligent Observing System Enabled by High Altitude Long Endurance Uncrewed Aerial Systems

Most major global satellite surveyors of climate-relevant trace gases have relatively coarse spatial resolution or temporal sampling. While these data can be supplemented by fine-pointing satellites and aircraft, the spatial and temporal resolutions available from crewed aircraft is not sufficient to observe stochastic, ephemeral events that take place between observations. Emerging High Altitude Long Endurance (HALE) Uncrewed Aerial Systems (UAS) can operate for months at a time and loiter over targets to provide continuous daylight geostationary-like observations, allowing these new platforms to be integrated with existing satellites as part of a New Observing Strategy (NOS).To aid in the planning of future NOS missions, NASA is developing the Intelligent Long Endurance Observing System (ILEOS), a science activity planning system. ILEOS will help scientists build plans to improve spatio-temporal resolution of climate-relevant gases by fusing coarse-grained sensor data from satellites and other sources(e.g., terrain, forecasts), and plan HALE UAS flights to obtain finer-grain (high spatio-temporal) data. ILEOS will also enable observations for longer periods and of environments not accessible through in-situ observations and crewed aircraft field campaigns.

science planning pipeline↗

Operations of the Optical Communications Demonstration for the Orion EM-2 Mission

The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.

Optical Communication↗

Spatial design principles for sustainable hydropower development in river basins

How can dams be arranged within a river basin such that they benefit society? Recent interest in this question has grown in response to the worldwide trend toward developing hydropower as a source of renewable energy in Asia and South America, and the movement toward removing unnecessary dams in the US. Environmental and energy sustainability are important practical concerns, and yet river development has rarely been planned with the goal of providing society with a portfolio of ecosystem services into the future. We organized a review and synthesis of the growing research in sustainable river basin design around four spatial decisions: Is it better to build fewer mainstem dams or more tributary dams? Should dams be clustered or distributed among distant subbasins? Where should dams be placed along a river? At what spatial scale should decisions be made? We came up with the following design principles for increasing ecological sustainability: (i) concentrate dams within a subset of tributary watersheds and avoid downstream mainstems of rivers, (ii) disperse freshwater reserves among the remaining tributary catchments, (iii) ensure that habitat provided between dams will support reproduction and retain offspring, and (iv) formulate spatial decision problems at the scale of large river basins. Based on our review, we discuss trade-offs between hydropower and ecological objectives when planning river basin development. We hope that future testing and refinement of principles extracted from our review will define a path toward sustainable river basin design.

13 HYDRO ENERGY↗

Planetary Protection Policy and Technology Developments for the Crewed Exploration of Mars

As part of planning for potential future crewed exploration of Mars, NASA is developing its planetary protection policy for crewed missions, building on concepts developed within the international space exploration community. COSPAR (The Committee on Space Research), together with participating space agencies, has over the last several years organized and held interdisciplinary meetings to consider next steps in addressing knowledge gaps for planetary protection for the first human missions to Mars. Beginning with these workshop discussions as a base, NASA has held follow-on planning activities to identify the necessary steps to be accomplished to close those knowledge gaps. Significant overlap was identified between the planetary protection needs, including; microbial monitoring requirements for crew health and medical systems; studies of the microbiome of the built environment; environmental control and life support system (ECLSS) venting and disinfection strategies; waste management, and; planetary surface operations. In many cases, efforts to mature exploration systems for Mars that are occurring in other technology domains can be leveraged with minor changes to address planetary protection gaps as well. In other cases, work planned for testing on ISS as an analog for Mars transit, or on the lunar surface as an analog for Mars surface operations, can be used to close gaps in current planetary protection capabilities. This presentation provides a status update on the findings of the COSPAR Meetings on this topic to date, together with NASA’s responses in terms of agency-level plans and activities.

James N Benardini↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Strategic Perspectives on the Future of Systems Engineering at NASA

NASA’s Model-Based Systems Engineering (MBSE) Infusion and Modernization Initiative (MIAMI) chartered a strategy group comprising early to mid-career NASA subject matter experts with diverse experiences to look into the future of systems engineering at NASA. The purpose of the group was to provide a vision for the future state of systems engineering practices and to develop a strategic plan to enable the evolution of the art up to 20 years in the future. The group used a design thinking approach to gather ideas and obtained insight into current engineering processes and domain outlook by interviewing engineers of varying expertise and experiences who had worked on teams of different sizes for missions large and small. The group built a roadmap to highlight future needs, projected capabilities, and technology and competency gaps and developed a strategic plan to ensure the expedient introduction of these capabilities. The resulting strategic plan recommends capability development and workforce strategies and provides guidance for Agency-wide SE policy. Artifacts, details, and raw data from the strategy team’s work are contained in NASA/TM-20205002911/SUPPL, Strategic Perspectives on the Future of Systems Engineering at NASA: Supplemental Information: Appendixes A to K.

Anupa R Bajwa↗

LaRC 20-Year Center Revitalization Plan

LaRC has developed a 20-Year Center Revitalization Plan. The objective of this plan is to assure that the center infrastructure is sustainable for the long-term and that the center will have the essential facilities and laboratories to execute the future NASA mission. The plan was developed by a centerwide team, VITAL, and was approved by the Center Leadership Council (CLC) in March 2012. The revitalization plan will be implemented through the Center Master Planning process.

Mangum, Cathy H.↗

Technology Applications that Support Space Exploration

Several enabling technologies have been identified that would provide significant benefits for future space exploration. In-Space demonstrations should be chosen so that these technologies will have a timely opportunity to improve efficiencies and reduce risks for future spaceflight. An early window exists to conduct ground and flight demonstrations that make use of existing assets that were developed for the Space Shuttle and the Constellation programs. The work could be mostly performed using residual program civil servants, existing facilities and current commercial launch capabilities. Partnering these abilities with the emerging commercial sector, along with other government agencies, academia and with international partners would provide an affordable and timely approach to get the launch costs down for these payloads, while increasing the derived benefits to a larger community. There is a wide scope of varied technologies that are being considered to help future space exploration. However, the cost and schedule would be prohibitive to demonstrate all these in the near term. Determining which technologies would yield the best return in meeting our future space needs is critical to building an achievable Space Architecture that allows exploration beyond Low Earth Orbit. The best mix of technologies is clearly to be based on our future needs, but also must take into account the availability of existing assets and supporting partners. Selecting those technologies that have complimentary applications will provide the most knowledge, with reasonable cost, for future use The plan is to develop those applications that not only mature the technology but actually perform a useful task or mission. These might include such functions as satellite servicing, a propulsion stage, processing lunar regolith, generating and transmitting solar power, cryogenic fluid transfer and storage and artificial gravity. Applications have been selected for assessment for future consideration and are addressed in this paper. These applications have been made available to the various NASA study groups that are determining the next steps the Agency must take to secure a sound foundation for future space exploration The paper also addresses how follow-on demonstrations, as launch performance grows, can build on the earlier applications to provide increased benefits for both the commercial and scientific communities. The architecture of incrementally building upon previous successes and insights dramatically lowers the overall associated risk for developing and maturing the key enabling technologies. The goal is to establish a potential business case that encourages commercial activity, thereby reducing the cost for the demonstration while using the technology maturation in developing readiness for future space exploration with overall less risk.

Henderson, Edward M.↗

Development of a verification program for deployable truss advanced technology

Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.

Dyer, Jack E.↗

Science and Observation Recommendations for Future NASA Carbon Cycle Research

Between October 2000 and June 2001, an Agency-wide planning, effort was organized by elements of NASA Goddard Space Flight Center (GSFC) to define future research and technology development activities. This planning effort was conducted at the request of the Associate Administrator of the Office of Earth Science (Code Y), Dr. Ghassem Asrar, at NASA Headquarters (HQ). The primary points of contact were Dr. Mary Cleave, Deputy Associate Administrator for Advanced Planning at NASA HQ (Headquarters) and Dr. Charles McClain of the Office of Global Carbon Studies (Code 970.2) at GSFC. During this period, GSFC hosted three workshops to define the science requirements and objectives, the observational and modeling requirements to meet the science objectives, the technology development requirements, and a cost plan for both the science program and new flight projects that will be needed for new observations beyond the present or currently planned. The plan definition process was very intensive as HQ required the final presentation package by mid-June 2001. This deadline was met and the recommendations were ultimately refined and folded into a broader program plan, which also included climate modeling, aerosol observations, and science computing technology development, for contributing to the President's Climate Change Research Initiative. This technical memorandum outlines the process and recommendations made for cross-cutting carbon cycle research as presented in June. A separate NASA document outlines the budget profiles or cost analyses conducted as part of the planning effort.

McClain, Charles R.↗

A plan for the development of superconducting Undulator prototypes for LCLS-II and future FELs

Copyright © 2014 CC-BY-3.0 and by the respective authors. Undulators serve as the primary source of radiation for modern storage rings, and more recently for the advent of Free-Electron Lasers (FELs). The performance of future FELs can be greatly enhanced using the much higher magnetic fields of superconducting undulators (SCU) [1]. For example, the LCLS-II hard x-ray undulator can be shortened by up to 70 m using an SCU in place of a PMU (permanent magnet undulator), or its spectral performance can be critically improved when using a similar length. In addition, SCUs are expected to be orders of magnitude less sensitive to radiation dose; a major issue at LCLS-II with its 1-MHz electron bunch rate. We present a funded R&D collaboration between SLAC, ANL, and LBNL, which aims to demonstrate the viability of superconducting undulators for FELs by building, testing, measuring, and tuning two 1.5-m long planar SCU prototypes using two different technologies: NbTi at ANL and Nb3Sn at LBNL. Our goal is to review and reassess the LCLS-II HXR baseline plans (PMU) in July of 2015, after the development and evaluation of both prototypes, possibly in favor of an SCU for LCLS-II.

Emma, P↗

How Much Testing is Needed to Manage Supportability Risks for Beyond-LEO Missions?

Supportability will be a significantly greater driver of cost and risk for future deep-space crewed missions than it has been in the past. Spares requirements and maintenance risk mitigation in particular present an unprecedented challenge for missions beyond Low Earth Orbit (LEO), since, for the first time in human spaceflight history, crews will be weeks or months away from resupply or a safe return to Earth in the event of an abort. Under these conditions, failure rates are a critical parameter that must be well-understood in order to manage logistics and risk effectively. However, failure rates cannot be measured directly, and can only be estimated based on past experience and test results. Previous research has shown that International Space Station (ISS) operational experience has provided significant benefits to future missions by reducing uncertainty and improving accuracy in failure rate estimates, resulting in significant reductions in mass and risk for beyond-LEO missions. This paper updates and expands on that research and quantifies the potential value of continued testing for future mission supportability. Frequentist and Bayesian models for evaluating, validating, and updating failure rate estimates are described, and are combined with supportability models to examine potential impacts of additional operating experience for future missions in terms of logistics mass reduction. The implications of these results for technology development, system design, and program planning are discussed along with lessons learned and recommendations for future system development. In the end, there is no simple answer to the question of how much testing is required, but the models described in this paper provide a way to evaluate the potential impacts of testing in order to inform test planning.

Andrew C Owens↗

AES Water Architecture Study Interim Results

The mission of the Advanced Exploration System (AES) Water Recovery Project (WRP) is to develop advanced water recovery systems in order to enable NASA human exploration missions beyond low earth orbit (LEO). The primary objective of the AES WRP is to develop water recovery technologies critical to near term missions beyond LEO. The secondary objective is to continue to advance mid-readiness level technologies to support future NASA missions. An effort is being undertaken to establish the architecture for the AES Water Recovery System (WRS) that meets both near and long term objectives. The resultant architecture will be used to guide future technical planning, establish a baseline development roadmap for technology infusion, and establish baseline assumptions for integrated ground and on-orbit environmental control and life support systems (ECLSS) definition. This study is being performed in three phases. Phase I of this study established the scope of the study through definition of the mission requirements and constraints, as well as indentifying all possible WRS configurations that meet the mission requirements. Phase II of this study focused on the near term space exploration objectives by establishing an ISS-derived reference schematic for long-duration (>180 day) in-space habitation. Phase III will focus on the long term space exploration objectives, trading the viable WRS configurations identified in Phase I to identify the ideal exploration WRS. The results of Phases I and II are discussed in this paper.

Sarguisingh, Miriam J.↗